Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 720TRCA regulated area (46% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (43% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 65852 building permits open, the oldest since 2000
Needs a closer lookStill open in the City's records: 24 107123 (Proposed repairs to the air intake shaft of office building, 2024, status Permit Issued); 16 181808 (Applicant proposed to repair the parking garage and re waterproofing where needed, 2016, status Permit Issued); 16 215213 (Install maglocks on two 14th floor elevator lobby doors. Install power supply and tie i..., 2016, status Permit Issued); and 49 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (44% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 26 206791 (PROPOSED NEW OFFICES FOR MANULIFE LOOR 8, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0684/05TEY (The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as ame..., 2005).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)6 development applications open within 300 m
Good to know6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
171 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 206791Inspection
PROPOSED NEW OFFICES FOR MANULIFE LOOR 8
Aug 12, 2026 · 250 BLOOR ST E - Building permit24 235772Closed
Proposal for interior alterations to existing office suite to include HVAC and sprinklers.
Nov 15, 2024 · 250 BLOOR ST E - Building permit24 119303Closed
Proposed washroom upgrades for manulife financial
Mar 5, 2024 · 250 BLOOR ST E - Building permit24 107123Permit Issued
Proposed repairs to the air intake shaft of office building.
Feb 21, 2024 · 250 BLOOR ST E - Building permit23 111067Closed
Proposal for interior alterations to existing office floor level 7, for tenant - 'Manulife Financial'. [East Tower]
Mar 8, 2023 · 250 BLOOR ST E - Building permit21 222935Closed
Proposal for fire alarm retrofit, upgrade to fire alarm panel.
Nov 8, 2021 · 250 BLOOR ST E - Building permit19 239596Closed
Proposal for interior alterations to the media room in unit 1600 in the existing office building, scope of work includes hvac.
Nov 6, 2019 · 250 BLOOR ST E - Building permit19 238354Closed
Install two maglocks on 9th floor. Install power supply and tie into existing base building maglock control system for emergency release on fire alarm.
Oct 23, 2019 · 250 BLOOR ST E
Show 163 older records
- Building permit19 210999Closed
Proposal for interior alterations to unit 9 in existing office "Cority"
Sep 18, 2019 · 250 BLOOR ST E - Building permit19 120411Closed
Proposal for interior alterations to existing office space on the 10th floor - "Manulife"
Mar 7, 2019 · 250 BLOOR ST E - Building permit19 110597Closed
HVAC - Proposed interior alterations to existing office unit ET15 on the 15th floor - MANULIFE
Feb 14, 2019 · 250 BLOOR ST E - Building permit18 214448Closed
To erect and display two illuminated wall signs displaying static copy located at the uppermost storey of the northerly and southerly elevations, each measuring 11.69 m by 2.14 m. **MANULIFE**
Sep 21, 2018 · 250 BLOOR ST E - Building permit18 110361Closed
Proposed interior alterations to existing office space on the main floor of an existing 17 floor multi-unit building.
Feb 1, 2018 · 250 BLOOR ST E - Building permit17 213171Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated ground sign displaying static copy located on the south frontage. The proposed sign contains one sign face, measuring 0.48 metres vertically by 3.32 metres horizontally at a height of 1.07 metres above grade.**MANULIFE**
Aug 23, 2017 · 250 BLOOR ST E - Building permit17 114197Closed
Proposal for interior alterations to unit G001 in existing multiple use building.
Feb 21, 2017 · 250 BLOOR ST E - Building permit16 238962Closed
Proposal of interior alterations to the 9th floor of existing office - "Manulife Financial"
Nov 1, 2016 · 250 BLOOR ST E - Building permit16 186769Closed
Proposal for interior alterations to the 14th floor (unit 1400) of the existing office building.
Oct 4, 2016 · 250 BLOOR ST E - Building permit16 226791Closed
Installation of two electromagnetic maglocks on the 14th floor, install power supply and tie into existing base building maglock control system - East Tower - Manulife Financial
Sep 26, 2016 · 250 BLOOR ST E - Building permit16 181808Permit Issued
Applicant proposed to repair the parking garage and re waterproofing where needed.
Sep 15, 2016 · 250 BLOOR ST E - Building permit16 215213Permit Issued
Install maglocks on two 14th floor elevator lobby doors. Install power supply and tie into existing base building maglock control system
Sep 7, 2016 · 250 BLOOR ST E - Building permit16 199034Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy on the uppermost (17th) storey north elevation. The proposed sign is 2.07 metres vertically by 23.99 metres horizontally at a height of 70.56 metres above grade.**MANULIFE FINANCIAL**
Aug 18, 2016 · 250 BLOOR ST E - Building permit16 186779Closed
Proposal for interior alterations for washrooms, lobby upgrades and new universal washroom on 14th floor (unit 1400) of the existing office building.
Aug 8, 2016 · 250 BLOOR ST E - Building permit16 158742Closed
Proposal for interior alterations to the 9th floor, "Medgate"
Jun 27, 2016 · 250 BLOOR ST E - Building permit16 126100Permit Issued
Proposal for interior alterations to lobby and exit stair in existing multiple unit building.
Jun 16, 2016 · 250 BLOOR ST E - Building permit16 148027Closed
Instal two maglocks on the 5th floor
May 30, 2016 · 250 BLOOR ST E - Building permit16 155266Closed
Proposal for interior alterations to existing office space on the 10th floor - Manulife
May 19, 2016 · 250 BLOOR ST E - Building permit16 145457Cancelled
In conjunction with a seventeen storey building, proposal to erect and display two static illuminated wall signs on the uppermost storey of the north and south elevations and one static illuminated ground sign on the south frontage. The proposed ground sign contains two sign faces, measuring at 2.1 metres verticall by 0.62 metres horizontally at a height of 2.72 metres above grade. The proposed wall signs are 2.07 metres vertically by 11.58 metres horizontally.**MANULIFE FINANCIAL**
Apr 26, 2016 · 250 BLOOR ST E - Building permit16 127473Closed
Proposal for iceiling replacement, new sprinkler head location and emergency lighting and exit signage (new ceiling) to existing office space on the 9th floor - Unit 900
Apr 20, 2016 · 250 BLOOR ST E - Building permit16 127458Closed
Proposal for interior alterations to existing office space on the 8th floor - Unit 800
Apr 20, 2016 · 250 BLOOR ST E - Building permit16 127483Closed
Proposal for interior alterations (lobby upgrades and a new washroom) to existing office space on the 9th floor
Mar 30, 2016 · 250 BLOOR ST E - Building permit16 124250Closed
Proposal for interior alterations to elevator lobby and washrooms on the 5th floor - Manulife Financial
Mar 21, 2016 · 250 BLOOR ST E - Building permit15 265522Closed
Proposed 8 maglocks on 11th, 12th and 13th floors.
Jan 12, 2016 · 250 BLOOR ST E - Building permit15 248391Closed
Proposal for interior alterations to existing office space on floors 11, 12, and 13 - Toronto Transit Commision offices
Dec 18, 2015 · 250 BLOOR ST E - Building permit15 240510Inspection
Permit to install (2) Maglocks on 8th Floor.
Nov 19, 2015 · 250 BLOOR ST E - Building permit15 227970Inspection
Proposal for interior demolition - back to base build - on the 10th floor of existing office.
Nov 10, 2015 · 250 BLOOR ST E - Building permit15 229555Closed
Proposal for interior alterations for a new file room in existing office space on the 2nd floor - Unit 200
Oct 14, 2015 · 250 BLOOR ST E - Building permit15 210766Closed
Proposal to install 2 mag locks on the 5th floor elevator lobby doors in the existing office building.
Sep 10, 2015 · 250 BLOOR ST E - Building permit15 152306Closed
REVISION - interior layout changes Proposal for interior alterations to existing office space on floors 5 and 6 - Manulife Financial
Aug 31, 2015 · 250 BLOOR ST E - Building permit15 190992Closed
Proposal for interior alterations to the washrooms and lobby areas on floors 8 and 9 - Manulife Financial
Aug 18, 2015 · 250 BLOOR ST E - Building permit15 190978Closed
Proposal for interior alterations and interior demo in existing office space on floors 8 and 9 - Manulife Financial
Aug 17, 2015 · 250 BLOOR ST E - Building permit15 189773Closed
Proposal to install (700 cfm) dst collection system to service 2 buffing machines in watch repair shop.
Aug 10, 2015 · 250 BLOOR ST E - Building permit15 186358Closed
Proposal to install 1 maglock on the ground floor of an existing office building
Aug 4, 2015 · 250 BLOOR ST E - Building permit15 152100Inspection
Install two maglocks on 16th floor elevator lobby doors. Install power supply and tie into existing base building maglock control system
Jun 8, 2015 · 250 BLOOR ST E - Building permit15 152329Closed
Proposal for interior alterations to elevator lobby and washroom on the 6th floor - Manulife Financial
Jun 4, 2015 · 250 BLOOR ST E - Building permit15 141842Closed
Proposal for interior alteration on the 11th and 12th floors lobby or Core space. "Manulife",
Jun 1, 2015 · 250 BLOOR ST E - Building permit15 141827Inspection
Proposal for interior demolition on the 11, 12th, 13th floors, "Manulife", future tenant to come in for fit-out permit.
May 29, 2015 · 250 BLOOR ST E - Building permit15 136066Closed
Proposal for interior alterations to the ground and main floor, "Breitling"
May 5, 2015 · 250 BLOOR ST E - Building permit15 136057Closed
Proposal for interior alterations to the 16th floor east tower, "Canadian Payroll Association"
Apr 29, 2015 · 250 BLOOR ST E - Building permit15 137230Closed
Proposal for interior alterations to the ground floor for a new front entry door in the existing office building.
Apr 21, 2015 · 250 BLOOR ST E - Building permit15 129472Closed
Proposal for interior demolition on the 16th floor, to return floor back to base, future tenant to come in for fit-out
Apr 10, 2015 · 250 BLOOR ST E - Building permit15 129486Inspection
Proposal for interior alterations to the 16th floor washrooms and lobby space, east tower, "Manulife Financial"
Mar 30, 2015 · 250 BLOOR ST E - Building permit15 125494Permit Issued
Proposal for interior alterations on the ground floor for "Tim Hortons"
Mar 24, 2015 · 250 BLOOR ST E - Building permit15 111273Inspection
INSTALL 2 DOUBLE MAGLOCKS ON 4TH & 7TH FLOORS, NEW POWER SUPPLY TO CONNECT TO EXISTING BASE CONTROL SYSTEM
Mar 6, 2015 · 250 BLOOR ST E - Building permit15 120252Closed
Permit for Intrior Alterations to existing Office space on ground floor of existing Office Building.
Mar 4, 2015 · 250 BLOOR ST E - Building permit15 111699Inspection
Proposal for interior alterations to existing office space in unit 100 for Manulife Financial.
Feb 24, 2015 · 250 BLOOR ST E - Building permit15 110690Inspection
Proposal for interior alterations to existing office space on the main floor, Suite 100 - Manulife Financial
Feb 23, 2015 · 250 BLOOR ST E - Building permit14 265030Inspection
Proposal for interior alterations on the 7th floor for "Manulife"
Jan 12, 2015 · 250 BLOOR ST E - Building permit14 265650Permit Issued
Proposal for interior alterations for existing office space for Manulife Financial on the 6th Floor.
Jan 9, 2015 · 250 BLOOR ST E - Building permit14 265007Permit Issued
Proposal for interior alterations on the 13th floor for "Manulife"
Jan 9, 2015 · 250 BLOOR ST E - Building permit14 265640Closed
HVAC - Proposal for interior alterations for upgrading of washrooms on 6th floor.
Jan 8, 2015 · 250 BLOOR ST E - Building permit14 265042Inspection
Proposal for interior alterations for washrooms and the lobby space on the 7th floor for "Manulife"
Jan 8, 2015 · 250 BLOOR ST E - Building permit14 265022Permit Issued
Proposal for interior alterations for washrooms and the lobby space on the 13th floor for "Manulife"
Jan 8, 2015 · 250 BLOOR ST E - Building permit14 261004Inspection
Proposal for interior alterations to construct a microwave room on the ground floor of the existing office building.
Jan 8, 2015 · 250 BLOOR ST E - Building permit14 251157Closed
Proposal for interior alterations to existing office space on the 5th floor - Manulife Financial
Jan 6, 2015 · 250 BLOOR ST E - Building permit14 248792Inspection
Proposal for interior alterations to the 4h floor of existing office. Tenant is "Manulife Financial"
Dec 2, 2014 · 250 BLOOR ST E - Building permit14 250050Inspection
To install two double maglocks on the third floor of the existing office building.
Nov 25, 2014 · 250 BLOOR ST E - Building permit14 225704Revision Issued
Revision to washroom layout
Nov 24, 2014 · 250 BLOOR ST E - Building permit14 233697Closed
Proposal for interior alterations to the 15th floor office - tenant is "Manulife Financial"
Nov 21, 2014 · 250 BLOOR ST E - Building permit14 246291Inspection
Install four maglocks on 2nd floor, and two on 15th floor
Nov 12, 2014 · 250 BLOOR ST E - Building permit14 233708Closed
Proposal for interior alterations to the washrooms on 15th floor - tenant is "Manulife Financial"
Nov 4, 2014 · 250 BLOOR ST E - Building permit14 206033Closed
Revision - HVAC - To complete interior alterations to the second floor washrooms and elevator lobby.
Oct 31, 2014 · 250 BLOOR ST E - Building permit14 234598Closed
To complete interior alterations (demolition and ready to accept finishes) to the 16th floor of the existing office building unit 1602.
Oct 24, 2014 · 250 BLOOR ST E - Building permit14 225693Inspection
Proposal to construct interior alterations to the 4th floor office space in the existing building (back to base build)
Oct 21, 2014 · 250 BLOOR ST E - Building permit14 206054Inspection
To complete interior alterations to the main floor office space.
Oct 6, 2014 · 250 BLOOR ST E - Building permit14 225683Closed
Proposal to construct interior alterations to 5th floor washrooms and elevator lobby in the existing office building.
Oct 3, 2014 · 250 BLOOR ST E - Building permit14 225667Closed
Proposal to to construct interior alterations to the 5th floor office space in the existing building.
Sep 29, 2014 · 250 BLOOR ST E - Building permit14 206051Closed
HVAC - To complete interior alterations to the third floor office space.
Sep 17, 2014 · 250 BLOOR ST E - Building permit14 206041Closed
HVAC - To complete interior alterations to the second floor office space.
Sep 17, 2014 · 250 BLOOR ST E - Building permit14 206357Closed
HVAC - To complete interior alterations to the third floor washrooms and elevators
Sep 9, 2014 · 250 BLOOR ST E - Building permit14 199368Permit Issued
Proposal to extend water line and connect to new fixture (Milano Dispenser) and an exhaust fan for the Bagel Oven to an existing Tim Hortons located on the ground floor.
Aug 26, 2014 · 250 BLOOR ST E - Building permit14 199364Permit Issued
Proposal to extend water line and connect to new fixture (Milano Dispenser) and an exhaust fan for the Bagel Oven to an existing Tim Hortons located on the ground floor.
Aug 26, 2014 · 250 BLOOR ST E - Building permit14 206058Inspection
To complete interior alterations to the main floor washroom and elevator lobby.
Aug 18, 2014 · 250 BLOOR ST E - Building permit14 206040Cancelled
To complete interior alterations to the second floor office space
Aug 13, 2014 · 250 BLOOR ST E - Building permit14 108391Closed
Proposal for interior alterations in existing office space on the 10th floor for "Ontario College of Social Workers and Social Service Workers"
Jan 28, 2014 · 250 BLOOR ST E - Building permit13 258040Inspection
Proposal for interior alterations to existing office space on the 10th floor - Manulife Finanacial.Scope of work includes interior demolition and the construction of a demising wall.
Nov 25, 2013 · 250 BLOOR ST E - Building permit13 114517Permit Issued
HVAC - Proposal for interor alterations to the 15th floor of existing office building (313.0m2).
Aug 30, 2013 · 250 BLOOR ST E - Building permit12 296435Permit Issued
Proposal for interior alterations to Suite 502 on the 5th floor of existing office building (6.0m2).
Jan 14, 2013 · 250 BLOOR ST E - Building permit12 235127Closed
Proposal to construct a temporary tent (30' X 90') for an event for "Manulife". Setup date Sep 13/12 and dismantle on Sep 14/12.
Aug 29, 2012 · 250 BLOOR ST E - Building permit12 204492Closed
This is for the installation of one(1) double electromagnetic lock on the 15th floor for "MANULIFE FINANCIAL".
Jul 6, 2012 · 250 BLOOR ST E - Building permit12 160677Closed
permit for interior alterations to existing office space - main floor - West Side of main floor - Manulife.
May 22, 2012 · 250 BLOOR ST E - Building permit12 137013Permit Issued
Proposal for interior alterations to existing office space on the 14th floor (suite 1440).
Mar 28, 2012 · 250 BLOOR ST E - Building permit11 274327Permit Issued
permit for interior alterations to existing office space - floor 5 - suite 502 - Readers Digest
Sep 28, 2011 · 250 BLOOR ST E - Building permit11 203930Closed
Proposal to install one maglock on 8th floor of existing office building.
May 31, 2011 · 250 BLOOR ST E - Building permit11 118368Closed
Proposal for interior and minor structural alterations to 10th floor, unit 1000 for filing system for existing office tenant "OCSWSSW" (22.8m2).
Mar 1, 2011 · 250 BLOOR ST E - Building permit10 265930Permit Issued
Proposal to replace the front revolving door of an existing office building.
Jan 28, 2011 · 250 BLOOR ST E - Building permit09 196478Permit Issued
Proposal for interior alterations to office suite 1450 for new tenant "Skywriter Media Inc" (127.27m2).
Dec 29, 2009 · 250 BLOOR ST E - Building permit09 188590Permit Issued
Proposal for interior alterations to fifth floor office (Unit 502)
Nov 24, 2009 · 250 BLOOR ST E - Building permit09 175484Permit Issued
HVAC - interior alterations to build Demising wall in portion of 14th floor and extend existing demising wall on portion of 14th floor.
Oct 21, 2009 · 250 BLOOR ST E - Building permit09 101867Closed
Interior alterations to existing office on the 16th floor. Suite 1603.
Jan 21, 2009 · 250 BLOOR ST E - Building permit08 187142Closed
Interior alterations to existing office space on portions of the main floor, ground floor, and 9th floor.
Aug 15, 2008 · 250 BLOOR ST E - Building permit08 167936Closed
Interior alterations to ground floor corridor. (Note: see BLD 08 144785 for adjacent office alterations).
Jun 13, 2008 · 250 BLOOR ST E - Building permit08 144785Closed
Interior alterations to existing washrooms and corridors on the ground floor (office building).
Apr 24, 2008 · 250 BLOOR ST E - Building permit07 278301Permit Issued
HVAC - Make interior alterations on portion of 16th floor-East Tower
Nov 15, 2007 · 250 BLOOR ST E - Building permit07 277257Closed
Interior alterations to existing office space - floor 10
Nov 14, 2007 · 250 BLOOR ST E - Building permit07 238880Inspection
- Building permit to replace existing boiler - building permit for roof strengthening and reinforcing and HVAC permit for boiler replacement - $283 added to building permit for boiler replacement
Jul 30, 2007 · 250 BLOOR ST E - Building permit07 140993Permit Issued
Plumbing - Make alterations to corridor and construct partition to sub-divide tenant space on single-tenant office floor.
Apr 16, 2007 · 250 BLOOR ST E - Building permit06 180244Inspection
To install a new sprinkler system at the penthouse level
Oct 4, 2006 · 250 BLOOR ST E - Building permit06 172247Closed
Relocate 2 maglocks and install 1 new on 12th floor.
Sep 14, 2006 · 250 BLOOR ST E - Building permit06 172228Inspection
HVAC - Make alterations to 12th floor lobby area & corridors.
Sep 14, 2006 · 250 BLOOR ST E - Building permit06 160868Closed
Interior alterations to an existing office space on the 16th floor
Aug 1, 2006 · 250 BLOOR ST E - Building permit06 157011Inspection
Repair concrete repairs to exterior of office building.
Jul 20, 2006 · 250 BLOOR ST E - Building permit06 146488Permit Issued
Plumbing - Interior alterations to fit out new Tenant on 10th floor
Jun 19, 2006 · 250 BLOOR ST E - Building permit06 146506Cancelled
Install 3 maglocks to new tenant fit out on 10th floor.
Jun 14, 2006 · 250 BLOOR ST E - Building permit06 136124Closed
Interior alterations to an existing office space on the 12th floor
May 29, 2006 · 250 BLOOR ST E - Building permit06 130999Closed
Minor interior alterations to existing office on the 12th floor.
May 5, 2006 · 250 BLOOR ST E - Building permit06 121388Closed
Minor interior alterations to existing office on the 2nd floor East Tower.
Apr 4, 2006 · 250 BLOOR ST E - Building permit06 117378Closed
Make interior alterations to main floor.
Mar 31, 2006 · 250 BLOOR ST E - Building permit06 117397Inspection
Fire alarm retro fit to entire 17 floor existing building and garage
Mar 31, 2006 · 250 BLOOR ST E - Building permit06 119447Closed
Interior alterations to an existing office space on the 3rd floor
Mar 30, 2006 · 250 BLOOR ST E - Building permit06 117149Closed
Make interior alterations to 12th floor office.
Mar 29, 2006 · 250 BLOOR ST E - Building permit05 144738Closed
Revise roof service stair from steel to concrete. Revise roof access hatch to roof access hatch enclosure. Revision for 05-144738Alteration of roof enclosure to roof hatch, as well as a redesign of tank room. ******New roof top auxiliary generator and new convience stair from penthouse to roof.
Jan 31, 2006 · 250 BLOOR ST E - Building permit06 103635Closed
Chiller plant retrofit in Basement of existing Office Bldg. Examiner to verify fee.
Jan 30, 2006 · 250 BLOOR ST E - Minor varianceA0684/05TEYApproved
The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to install a rooftop generator and construct a stair enclosure on the middle portion of the roof of the existing office building.
Nov 2, 2005 · 250 BLOOR ST E - Building permit05 197857Closed
Make interior alterations to portion of ground floor office.
Oct 31, 2005 · 250 BLOOR ST E - Building permit05 188962Closed
Interior alteration to a portion of the 7th floor to remove and relocate existing partitions
Oct 5, 2005 · 250 BLOOR ST E - Building permit05 182664Permit Issued
Interior alterations to offices on 12th floor
Sep 23, 2005 · 250 BLOOR ST E - Building permit05 181176Closed
Install partitions on portions of the ground floor office. (NorthTower) Tenant: Manulife Financial
Sep 21, 2005 · 250 BLOOR ST E - Building permit05 172024Closed
Interior alterations to existing office on the 2nd floor (East Tower). Single tenant
Sep 20, 2005 · 250 BLOOR ST E - Building permit05 131369Closed
Make interior alterations to 10th floor office.
May 31, 2005 · 250 BLOOR ST E - Building permit05 111032Closed
Install maglocks on 16th floor.
Feb 24, 2005 · 250 BLOOR ST E - Building permit05 106761Permit Issued
Interior alterations to existing basement area to be converted to a diesel tank.
Feb 10, 2005 · 250 BLOOR ST E - Building permit04 195080Closed
Supply and install power supply and maglock (one) on second floor.
Nov 25, 2004 · 250 BLOOR ST E - Building permit04 188173Closed
interior alterations to construct a total of 6 vestibules. exist and proposed- parking garage
Nov 9, 2004 · 250 BLOOR ST E - Building permit04 185900Closed
Install 1 maglock on the 12th floor.
Oct 28, 2004 · 250 BLOOR ST E - Building permit04 180070Closed
Install one electro-magnetic locking device on gardeners shed storage area in exterior parking level.
Oct 7, 2004 · 250 BLOOR ST E - Building permit04 148064Closed
Install 1 electro-magnetic locking device on ground floor.
Jun 17, 2004 · 250 BLOOR ST E - Building permit04 147992Closed
install 2 maglocks on each of floors 4, 8 & 12, 6 in total
Jun 17, 2004 · 250 BLOOR ST E - Building permit04 129178Closed
Install 1 new maglock on the 7th floor and relocate one.
Apr 29, 2004 · 250 BLOOR ST E - Building permit03 130711Closed
install maglock on main floor
May 8, 2003 · 250 BLOOR ST E - Building permit02 130846Closed
h.v.a.c. alter air-conditioning by adding chiller and piping to ground floor.
May 17, 2002 · 250 BLOOR ST E - Building permit02 102155Permit Issued
make alterations to portion of lower level, for restaurant purposes ( seating capacity 82) tenant: manulife bistro/tim horton's
Mar 15, 2002 · 250 BLOOR ST E - Building permit01 169013Closed
alter h.v.a.c. system on portion of 15th floor. see bp#01-169008 tenant:Research Strategy Group
Sep 20, 2001 · 250 BLOOR ST E - Building permit01 169014Permit Issued
install fixtures on portion of 15th floor- 1 k.s., 1 h.w.t..tenant:Research Strategy Group see bp#01-169008
Sep 20, 2001 · 250 BLOOR ST E - Building permit01 162689Closed
carry out garage repairs.
Aug 24, 2001 · 250 BLOOR ST E - Building permit01 169008Closed
install partitions on portion of 15th floor. tenant:Research Strategy Group
Aug 23, 2001 · 250 BLOOR ST E - Building permit01 159120Closed
install on 15th floor existing office: 2 k.s., 2 h.w.t. tenant: quality management laboratory services. cost included in 01-159087 edc
Aug 16, 2001 · 250 BLOOR ST E - Building permit01 159114Closed
h.v.a.c. alter h.v.a.c. system on portion of 15th floor existing office. tenant: quality management laboratory services. cost included in 01-159087 edc
Aug 1, 2001 · 250 BLOOR ST E - Building permit01 159087Closed
make interior alterations to portion of 15th floor existing office. tenant: quality management laboratory services. edc
Jul 20, 2001 · 250 BLOOR ST E - Building permit01 145315Closed
Erect one temporary tent structure 30' x 40' to be erected June 8/01 and dismantled June14/01
Jun 7, 2001 · 250 BLOOR ST E - Building permit01 132597Closed
Install fixtures in restaurant in basement: 4 hand sinks, 1 d.w., 1 2-compt. sink, 1 grease interceptor cost incl. 01 - 132583 "Manulife Bistro"
May 2, 2001 · 250 BLOOR ST E - Building permit01 132587Closed
alter existing h.v.a.c. system in portion of the lower level (basement) restaurant. Also install kitchen exhaust system. (h.v.a.c. portion cost incl. in 01 - 132585) "Manulife Bistro"
May 2, 2001 · 250 BLOOR ST E - Building permit01 132583Application Withdrawn
Make alterations to existing restaurant on lower level (basement) and increase seating from 74 to 82 seats. "Manulife Bistro"
May 2, 2001 · 250 BLOOR ST E - Building permit01 105631Permit Issued
Install 1 maglock on 14th floor
Jan 25, 2001 · 250 BLOOR ST E - Building permit00 364164Closed
Install fixtures on the 14th floor office: 1 dishwasher, 1 kitchen sink cost incl. 00 - 364148
Dec 28, 2000 · 250 BLOOR ST E - Building permit00 364148Permit Issued
Make alterations to portion of 14th floor for office purposes.
Dec 28, 2000 · 250 BLOOR ST E - Building permit00 347185Closed
Relocation of one electromagnetic lock on the 11th Floor. Tenant: Manulife
Oct 19, 2000 · 250 BLOOR ST E - Building permit00 333271Closed
Install one maglock on 16th floor
Aug 31, 2000 · 250 BLOOR ST E - Building permit00 161979Inspection
1 maglock on 4rth floor
Jun 15, 2000 · 250 BLOOR ST E - Building permit00 135168Closed
Install partitions on the 16th floor office (north & south tower). Tenant: Working Ventures
Mar 23, 2000 · 250 BLOOR ST E - Building permit99 104050Closed
Make interior alteraitons on portion of lower level - (Basement) for Retail Store purposes. Area approx (74 sq.m) Tenant: Manulife
Jan 7, 2000 · 250 BLOOR ST E - Zoning review99 022390 LTOClosedMay 25, 1999 · 250 BLOOR ST E
- Building permit99 014996Closed
ERECT PARTITIONS ON PORTION OF 13TH FLOOR FOR OFFICE PURPOSES TENANT: MANULIFE JNB
Apr 15, 1999 · 250 BLOOR ST E - Building permit99 014145Closed
MAKE INTERIOR ALTERATIONS - DEMOLISH AND REBUID PARTITIONS ON PORTION OF 4TH FLOOR FOR OFFICE PURPOSES TENANT: MANULIFE FINANCIAL AREA 732 SQ. M. (W23)/ZL
Mar 15, 1999 · 250 BLOOR ST E - Building permit99 012239Closed
INSTALL MAGNETIC LOCKING DEVICE ON 3RD FLOOR LG
Feb 12, 1999 · 250 BLOOR ST E - Building permit98 025366Closed
MAKE INTERIOR ALTERS - DEMOLISH & REBUILD PARTITIONS ON PORTION OF 14TH FLOOR FOR OFFICE PURPOSES. TENANT: STRATEGIC/AMPERSAND INC AREA 185.8 SQ.M. (FEE COLLECTED $ 603.85) (W22)/SP
Dec 31, 1998 · 250 BLOOR ST E - Building permit98 017782Closed
REPLACE DOORS AND INSTALL ELECTRO-MAGNETIC LOCKING DEVICES TO FIRST FLOOR OFFICE. /LM
Jun 18, 1998 · 250 BLOOR ST E - Building permit98 013710Closed
INSTALL MAG-LOCK SYSTEM FOR LOBBIES ON 6TH AND 9TH FLOORS JNB
Feb 25, 1998 · 250 BLOOR ST E - Building permit97 019009Closed
ALTER DUCTWORK TO EXISTING H.V.A.C. SYSTEM ON PORTION OF THE 10TH FLOOR OFFICE. ALSO INSTALL FAN-COIL UNIT. COST INCL. 400822 /LM
Jul 18, 1997 · 250 BLOOR ST E - Building permit97 014811Closed
HVAC ALTERATIONS ON 16TH FLOOR BP COST INCL:396609
Apr 10, 1997 · 250 BLOOR ST E - Zoning review94 024829 LTOClosedApr 28, 1994 · 250 BLOOR ST E
- Zoning review89 029754 LTOClosedFeb 1, 1989 · 250 BLOOR ST E
Check before you build
Site-specific exception 900.11.10(1509)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 7,455 m²
- Frontage
- 43.5 m
- Depth
- 181.7 m
- Street
- Bloor St E
- Corner lot
- Yes, also on Ted Rogers Way181.7 m along it
- Public lane
- None
- House footprint
- 3,845 m²roof up to 85.5 m
- Back yard
- 15.6 mhouse to rear lot line
- Side yards
- 0 m and 5.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 61 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 211. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Bloor Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 6.0 (c4.5; r6.0) SS1 (x1509) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 78%7 of 9 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 14
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 109 m away - Minor varianceApproved
To permit 30 undersized/partially obstructed vehicular parking spaces within the existing underground parking garage (Parking Levels 1 to 5) of the 53-storey mixed-use building, which is currently under construction.
603 SHERBOURNE ST · Nov 26, 2025 · 399 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.
591 SHERBOURNE ST · Sep 3, 2025 · 428 m away - Minor varianceApproved
To facilitate the redevelopment of this site for a 51-storey mixed-use building, including the Parkland dedication requirement. This application is necessitated to modify Sections 4, 7, 16, and 24 under Appendix 1, Site Specific Zoning By-law 1528-2019, and Sections 4, 7, 15, and 23 under Schedule A, Site Specific Zoning By-law 1529-2019, which relates to the timing of conveyance and lease of the parklands and the construction for park improvements.
601 SHERBOURNE ST · Jun 11, 2025 · 412 m away - Minor varianceApproved
To permit the replacement of 4 new mechanical units.
1 MOUNT PLEASANT RD · Apr 9, 2025 · 239 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to replace existing indoor diesel life-safety generator with new rooftop natural gas life safety generator.
77 HUNTLEY ST · Nov 18, 2026 · 195 m away - Building permit
Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
1 MOUNT PLEASANT RD · Nov 18, 2026 · 239 m away - Building permit
Three wall sign.***NO FRILLS***
345 BLOOR ST E · Nov 10, 2026 · 255 m away - Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 109 m away - Building permit
Proposed interior alterations to create a second suite.HERITAGE REQUIRED
123 COLLIER ST · Oct 30, 2026 · 271 m away - Building permit
REV 01: Revision to permit to include two risers Proposal to replace heating riser.
110 CHARLES ST E · Oct 20, 2026 · 244 m away - Building permit
Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.
175 BLOOR ST E · Oct 15, 2026 · 216 m away - Building permit
Maglock Installation
100 HAYDEN ST · Sep 9, 2026 · 202 m away - Building permit
Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
175 BLOOR ST E · Aug 27, 2026 · 216 m away - Building permit
Proposed interior fit out to update existing school to new school finishes and layout
120 BLOOR ST E · Aug 17, 2026 · 255 m away
Neighbourhood: Rosedale-Moore Park
About the area around the lot, not the lot itself.
- Nearest station
- Sherbourne Station6 min walk
- Nearest TTC stop
- Bloor St East at Jarvis St1 min walk
- Nearest cycling route
- Bloor St ECycle Track, 1 min walk
- Nearest traffic count
- 10,784 vehicles in 8 hBloor St E / Ted Rogers Way, 80 m away, Dec 10, 2022
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 5 with cyclists
- Parks
- Rosedale Ravine Lands1 min walk
- Milner Parkette3 min walk
- Asquith Green Park4 min walk
Schools within 1 km
- BRANKSOME HALL GIRLS SCHOOL Private 5 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 6 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 6 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 7 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 9 min walk
- ROSEDALE JR PUBLIC SCHOOL English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Rosedale-Moore Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $122,000 | $84,500 |
| Households that own their home | 58% | 54% |
| Population (2021) | 20,080 | 16,813 |
| Homes built in 1960 or before | 46% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Rosedale-Moore Park | City median |
|---|---|---|
| Assault | 1080.4 | 636.3 |
| Robbery | 86.8 | 69.5 |
| Auto theft | 199.6 | 192.6 |
| Theft over $5,000 | 65.1 | 46.1 |
| Break and enter | 455.6 | 172.8 |
| Theft from vehicles | 182.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.