HousePrecheckCheck an address

250-256 Laird DrToronto · zoning, lot size and permit records

Also 809 Eglinton Ave E, 811 Eglinton Ave E

Commercial residential · CR 2.0 (c2.0; r1.3) SS2 (x869)41.2 × 45.8 m1,827 m²on Laird Drcorner, also on Eglinton Ave E

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 7 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • Major Transit Station Area: LairdThe City plans more homes around the station: good for transit, and more building over time.
N20 m
41.2 m frontage45.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

24 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 102516Cancelled

    Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations

    Jan 8, 2024 · 250-256 LAIRD DR
  • Building permit23 172261Approved

    Protection of standpipe systems at all stations

    Jul 10, 2023 · 250-256 LAIRD DR
  • Building permit16 152901Closednew building

    Revision 02 - addition of platform edge bollards.Revision 01 - see attached list for all revisions, include Alternative Solution 19-259678Constuct the future entrances for the Eglinton LRT line at Laird Station

    Mar 27, 2023 · 250-256 LAIRD DR
  • Building permit22 237161Closed

    Eginton Crosstown LRT - Laird Station is a new build. Installation fo future Presto Faregates to the transit subway station

    Jan 20, 2023 · 250-256 LAIRD DR
  • Building permit22 200925Cancelled

    Provide edge installation for bollard barriers

    Sep 8, 2022 · 250-256 LAIRD DR
  • Building permit22 159268Approved

    It is proposed to install window sprinklers under non-horizontal mullions to provide glazing protection at the Eglinton LRT (Laird Station)

    Jun 9, 2022 · 250-256 LAIRD DR
  • Building permit22 147491Cancelled

    AS addresses the steel HSS beams which support the 2hr fire resisting slab forming the roof/canopy over the Laird secondary entrance

    May 16, 2022 · 250-256 LAIRD DR
  • Building permit18 188525Closed

    Revision 02 - changes due to conditionRevision 01-changes to existing site servicesSite Services: for the Eglinton LRT Crosstown for the Laird Station

    Jun 11, 2021 · 250-256 LAIRD DR
Show 16 older records
  • Building permit18 111764Closed

    Installation of a backflow prevention device (Reduced Pressure Principal Assembly). This device will be used temporarily (less than 4 years) to faciliatate construction of the ECLRT project. For reference: Site Services permit 16-152901 STS 00 DR

    Feb 5, 2018 · 250-256 LAIRD DR
  • Zoning review13 155746 PSPClosed
    Sep 8, 2017 · 250-256 LAIRD DR
  • Building permit16 253135Closed

    Install 2 office trailers on the secondary entrance for Laird Stations

    Mar 1, 2017 · 250-256 LAIRD DR
  • Building permit17 101521Approved

    Egress from Service Areas

    Jan 6, 2017 · 250-256 LAIRD DR
  • Building permit16 113116Closeddemolition

    Demolition of existing building for the future Main Entrance to the Eglinton LRT Line

    Mar 4, 2016 · 250-256 LAIRD DR
  • Building permit14 245807Closed

    Proposal to install one 2" back flow preventer

    Nov 7, 2014 · 250-256 LAIRD DR
  • Development application13 151306 NNY 26 SAClosed

    Eglinton Crosstown LRT - Laird Station (corner of Laird Drive and Eglinton Avenue East)

    Apr 16, 2013 · 250-256 LAIRD DR · City file
  • Zoning review11 271680 LPRClosed
    Sep 9, 2011 · 250-256 LAIRD DR
  • Zoning review10 225887 LPRClosed
    Jul 21, 2010 · 250-256 LAIRD DR
  • Zoning review10 120111 ZSVClosed
    Feb 18, 2010 · 250-256 LAIRD DR
  • Zoning review09 124501 ZSVClosed
    Apr 7, 2009 · 250-256 LAIRD DR
  • Zoning review08 231952 ZPRCancelled
    Dec 24, 2008 · 250-256 LAIRD DR
  • Zoning review05 107405 LTOClosed
    Feb 8, 2005 · 250-256 LAIRD DR
  • Zoning review03 113350 LTOClosed
    Mar 7, 2003 · 250-256 LAIRD DR
  • Zoning review02 108864 LTOClosed
    Feb 7, 2002 · 250-256 LAIRD DR
  • Zoning review01 196449 LTOClosed
    Nov 20, 2001 · 250-256 LAIRD DR

Check before you build

  • Site-specific exception 900.11.10(869)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(869)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Dwelling units are only permitted in a mixed use building .

By-law 569-2013, Chapter 900

Lot facts

Area
1,827 m²
Frontage
41.2 m
Depth
45.8 m
Street
Laird Dr
Corner lot
Yes, also on Eglinton Ave E45.8 m along it
Public lane
None
Max height
12.2 m
Max lot coverage
80%
  • Major Transit Station Area: Laird. The lot is inside the Laird Major Transit Station Area approved by the Province (Site and Area Specific Policy 682). Source
  • Zone CR 2.0 (c2.0; r1.3) SS2 (x869) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
87%26 of 30 decisions
Garden suite permits
2
Laneway suite permits
1
Multiplex permits
3
Development applications
10

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second and third storey addition above the existing one-storey building which is occupied by a restaurant. The addition will create four new residential units, along with a rooftop terrace.

    804 EGLINTON AVE E · Jan 7, 2016 · 132 m away

Latest activity nearby

  • Building permitmultiplex

    Revision No.1: Rear exterior stair is changed from wooden to steel construction.Proposal - Interior renovation, third floor and rear addition to convert a single family residential, detached house to a residential fourplex.

    732 EGLINTON AVE E · Nov 25, 2026 · 276 m away
  • Building permit

    Proposed multiple projects including interior alterations on all floors, new front porch and new rear deck.

    64 PARKLEA DR · Nov 23, 2026 · 234 m away
  • Building permit

    Revision # 1 - interior revisions, to non structural - remove basement walkout and construct a rear wood deck.Proposal for 2 storey rear addition to existing 2 storey SFD

    38 VANDERHOOF AVE · Oct 23, 2026 · 265 m away
  • Building permit

    Proposal to supply and install 3 replacement HVAC roof top units and 1 replacement ductless split.

    211 LAIRD DR · Oct 15, 2026 · 217 m away
  • Building permit

    Proposal to repair and renovate existing attached garage

    281 LAIRD DR · Oct 14, 2026 · 133 m away
  • Zoning review

    Closed

    852-854 EGLINTON AVE E · Oct 13, 2026 · 60 m away
  • Building permit

    Proposal to install backwater valve.

    162 DIVADALE DR · Oct 8, 2026 · 295 m away
  • Building permit

    install backwater valve

    381 SUTHERLAND DR · Oct 1, 2026 · 211 m away
  • Building permit

    Proposal for HVAC standalone. Add ventilation to existing 6ix Nails Spa.

    846-850 EGLINTON AVE E · Sep 30, 2026 · 64 m away
  • Building permit

    Proposed underpinning to existing dwelling

    64 PARKLEA DR · Sep 30, 2026 · 234 m away

Neighbourhood: Leaside-Bennington

About the area around the lot, not the lot itself.

Nearest station
Laird Station1 min walk
Nearest TTC stop
Laird Station Westbound Platform1 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
36,709 vehicles in 14 hEglinton Ave E / Laird Dr, 40 m away, Sep 30, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Radar Park7 min walk
Serena Gundy Park7 min walk
Howard Talbot Park8 min walk

Schools within 1 km

  • NORTHLEA ELEMENTARY & MDL SCHOOL English Public 6 min walk
  • MARIA MONTESSORI SCHOOL Private 8 min walk
  • CHILDREN'S GARDEN JUNIOR SCHOOL Private 10 min walk
  • LEASIDE HIGH SCHOOL English Public 11 min walk
  • BESSBOROUGH DRIVE ELEMENTARY SCHOOL English Public 13 min walk
  • BLOORVIEW SCHOOL AUTHORITY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureLeaside-BenningtonMedian neighbourhood
Median household income (2020)$148,000$84,500
Households that own their home72%54%
Population (2021)16,53516,813
Homes built in 1960 or before67%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleLeaside-BenningtonCity median
Assault212.9636.3
Robbery10.669.5
Auto theft298.1192.6
Theft over $5,00047.946.1
Break and enter181172.8
Theft from vehicles234.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.