HousePrecheckCheck an address

25 Whitlam AveToronto · zoning, lot size and permit records

≈ 128.8 × 32.2 m3,497 m²on Whitlam Avebacks onto Ln N Twenty Second E Whitlam

Not a home

Whitlam Warehouse

The City of Toronto's real estate inventory lists Whitlam Warehouse here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 14 139849 (Rev 01: Revision as per bubbled drawingsInterior alterations to existing suite #2 sport..., 2019, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 128.8 m frontage≈ 32.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 14 139849 (Rev 01: Revision as per bubbled drawingsInterior alterations to existing suite #2 sport..., 2019, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit14 139849Revision Issued

    Rev 01: Revision as per bubbled drawingsInterior alterations to existing suite #2 sports training gym, to expand into suite #1 and add an exercise room New mechanical shaft and roof top unit. New plumbing.

    Apr 17, 2019 · 25 WHITLAM AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,497 m²
Frontage
128.8 mestimated, irregular lot
Depth
32.2 mestimated, irregular lot
Street
Whitlam Ave
Corner lot
No
Public lane
Ln N Twenty Second E Whitlam, 86.6 m along it
House footprint
2,634 m²roof up to 13.5 m
Back yard
1.9 mhouse to rear lot line
Side yards
9.1 m and 10.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%5 of 5 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new fourplex

      76 TWENTY FOURTH ST · Apr 23, 2026 · 313 m away
    • Minor varianceApproved

      To construct a new semi-detached apartment building containing 6 dwelling units.

      399 KIPLING AVE · Apr 23, 2026 · 346 m away
    • Minor varianceApproved

      To construct a new semi-detached apartment building containing 6 dwelling units.

      401 KIPLING AVE · Apr 23, 2026 · 343 m away
    • Minor varianceApproved

      To construct a new semi-detached fourplex.

      35 LABURNHAM AVE · Nov 20, 2025 · 496 m away
    • Minor varianceApproved

      To construct a new semi-detached fourplex.

      35 LABURNHAM AVE · Nov 20, 2025 · 496 m away

    Latest activity nearby

    • Building permit

      REVISION-01Proposed structural framing repairs to units 135 and 138

      120 TWENTY FOURTH ST · Nov 18, 2026 · 201 m away
    • Building permit

      Back water valve on sanitary line.

      90 TWENTY FOURTH ST · Sep 10, 2026 · 272 m away
    • Building permit

      PROPOSED ELEVATOR WITHIN EXISTING THREE STOREY INDUSTRIAL BUILDING

      20 TOWNS RD · Feb 2, 2026 · 277 m away
    • Building permit

      Proposed installation of back water valve on sanitary drain.

      90 TWENTY SECOND ST · Mar 13, 2025 · 267 m away
    • Building permit

      REVISION 01: Proposed structural Fire Damage Restoration Proposal for fire damage restoration

      120 TWENTY FOURTH ST · Jan 13, 2025 · 201 m away
    • Building permit

      Proposal to install a backwater valve on the sanitary line in an existing SFD-semi dwelling.

      105 TWENTY FOURTH ST · Oct 30, 2024 · 210 m away
    • Zoning review

      Closed

      11 A TOWNS RD · Oct 3, 2024 · 229 m away
    • Building permit

      Proposal for fire damage restoration

      120 TWENTY FOURTH ST · Aug 27, 2024 · 201 m away
    • Building permit

      Rev 01 - THE REVISION IS FOR REPAIRS TO THE STRUCTURE OF THE EXISTING DECK. Proposal for interior alterations on all floors

      89 TWENTY FOURTH ST · Jun 5, 2024 · 249 m away
    • Zoning review

      Closed

      300 BIRMINGHAM ST · May 13, 2024 · 276 m away

    Neighbourhood: New Toronto

    About the area around the lot, not the lot itself.

    Nearest station
    Long Branch GO Station34 min walk
    Nearest TTC stop
    Kipling Ave at New Toronto St South Side5 min walk
    Nearest cycling route
    Birmingham StSigned Route (No Pavement Markings), 5 min walk
    Nearest traffic count
    10,695 vehicles in 8 hKipling Ave / New Toronto St, 310 m away, Feb 8, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Don Russell Memorial Park1 min walk
    Laburnham Park6 min walk
    Colonel Samuel Smith Park11 min walk

    Schools within 1 km

    • LAKESHORE COLLEGIATE INSTITUTE English Public 5 min walk
    • TWENTIETH STREET JR SCHOOL English Public 9 min walk
    • HUMBER COLLEGE SCHOOL - LAKESHORE CAMPUS College 11 min walk
    • VINCENT MASSEY ACADEMY Private 12 min walk
    • THE HOLY TRINITY SCHOOL English Separate 12 min walk
    • FATHER JOHN REDMOND CATHOLIC SECONDARY SCHOOL English Separate 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureNew TorontoMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home44%54%
    Population (2021)11,34516,813
    Homes built in 1960 or before45%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleNew TorontoCity median
    Assault903.2636.3
    Robbery76.569.5
    Shootings15.310.5
    Auto theft145.4192.6
    Theft over $5,00091.946.1
    Break and enter183.7172.8
    Theft from vehicles244.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.