Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
7 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 173857 000 00 IR (Adequate Heat, 2026); 26 173856 000 00 IR (Property Standards, 2026); 26 114721 PRS 00 IR (Property Standards, 2026); and 4 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 25 256213 (Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for repl..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 95 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (11 storeys, 97 units, built 1983).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
18 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 256213Revision Issued
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
Oct 19, 2026 · 25 MUTUAL ST - By-law investigation26 173857 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 25 MUTUAL ST - By-law investigation26 173856 000 00 IRClosed
Property Standards
Jun 1, 2026 · 25 MUTUAL ST - By-law investigation26 114721 PRS 00 IRClosed
Property Standards
Feb 9, 2026 · 25 MUTUAL ST - By-law investigation26 103153 PRS 00 IRClosed
Property Standards
Jan 10, 2026 · 25 MUTUAL ST - By-law investigation25 204731 PRS 00 IRClosed
Property Standards
Aug 4, 2025 · 25 MUTUAL ST - By-law investigation25 186203 PRS 00 IVClosed
Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.Namely: Throughout unit
Jun 24, 2025 · 25 MUTUAL ST - By-law investigation25 183092 PRS 00 IRClosed
Property Standards
Jun 24, 2025 · 25 MUTUAL ST
Show 10 older records
- Building permit22 109546Closed
Rev 01: revision to common areas for accessibility upgrades
Feb 1, 2023 · 25 MUTUAL ST - Zoning review21 244433 ZPRClosedDec 2, 2021 · 25 MUTUAL ST
- Zoning review21 201925 ZPRClosedAug 20, 2021 · 25 MUTUAL ST
- Building permit20 187864Closed
Proposal to replace the fixtures in an existing apartment building.
Sep 21, 2020 · 25 MUTUAL ST - Building permit14 172903Closed
Proposal for concrete garage repairs
Jul 11, 2014 · 25 MUTUAL ST - Building permit11 224720Closed
This is for localized balcony repairs to this 11 storey apartment building. There will be repairs done to 83 balconies.
Jul 20, 2011 · 25 MUTUAL ST - Building permit09 195551Closed
Proposal to install one back flow device
Dec 15, 2009 · 25 MUTUAL ST - Building permit04 114348Closed
Install new fire alarm retrofit to a 14 storey building.
Mar 17, 2004 · 25 MUTUAL ST - Building permit98 022879Closed
INSTALL EQUIPMENT SHELTER AND ANTENNAS ON THE ROOF FOR TELECOMMUNICATIONS PURPOSES. /LM
Oct 30, 1998 · 25 MUTUAL ST - Building permit96 020728Closed
INSTALL MAGLOCK AT PENTHOUSE LEVEL SS
Nov 14, 1996 · 25 MUTUAL ST
Check before you build
Site-specific exception 900.11.10(2449)
Needs a closer look1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
1 part for other addresses
- C On 37 Mutual St., former City of Toronto by-law 445-78.
Lot facts
- Area
- 2,286 m²
- Frontage
- 75.4 m
- Depth
- 30.9 m
- Street
- Mutual St
- Corner lot
- No
- Public lane
- Richard Bigley Lane, 111.1 m along it
- House footprint
- 812 m²roof up to 35.8 m
- Back yard
- 10.5 mhouse to rear lot line
- Side yards
- 3.3 m and 15.1 mhouse to side lot lines
- Buildings on the lot
- 9house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c0.5; r4.0) SS1 (x2449) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%27 of 27 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 13
- Development applications
- 48
Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 401 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 477 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 34 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 149 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 154 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 145 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 120 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 285 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 284 m away - Building permit
Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.
124 CHURCH ST · Nov 16, 2026 · 239 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 205 m away - Building permit
Sprinklers related to 25-195702 BLD
30 BOND ST · Nov 2, 2026 · 284 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 213 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 106 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 183 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station7 min walk
- Nearest TTC stop
- Queen St East at Jarvis St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 2 min walk
- Nearest traffic count
- 22,444 vehicles in 14 hQueen St E / Jarvis St, 100 m away, Jul 3, 2025
- Serious collisions within 500 m
- 192021–2026, killed or seriously injured: 3 fatal, 13 with pedestrians, 1 with cyclists
- Parks
- 45 Dalhousie St Park1 min walk
- Moss Park3 min walk
- Arena Gardens3 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.