HousePrecheckCheck an address

25 Madison AveToronto · zoning, lot size and permit records

Also 25 Madison Ave

Commercial residential · CR 1.5 (c1.5; r1.0) SS2 (x2481)≈ 31.0 × 54.9 m965 m²on Madison Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 12 rental units, built 1989More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 25 168774 (Proposal for mechanical & enclosure retrofit of the 4-storey apartment building. Scope..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • City upkeep score: 88 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: SpadinaThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 31.0 m frontage≈ 54.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 25 269977 PRS 00 IR (Property Standards, 2025); 25 156162 ZON 00 IR (Zoning, 2025); 25 125168 ZON 00 IR (Zoning, 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 168774 (Proposal for mechanical & enclosure retrofit of the 4-storey apartment building. Scope..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 88 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 12 units, built 1989).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 269977 PRS 00 IRClosed

    Property Standards

    Dec 27, 2025 · 25 MADISON AVE
  • Building permit25 168774Inspection

    Proposal for mechanical & enclosure retrofit of the 4-storey apartment building. Scope includes envelope upgrades, including all exterior windows and doors, and new / increased roof insulation (and work associated with increased roof thickness. overall HVAC system upgrades with new in-suite ventilation

    Jul 10, 2025 · 25 MADISON AVE
  • By-law investigation25 175685 FEN 00 IRRescheduled

    Fence

    Jun 11, 2025 · 25 MADISON AVE
  • By-law investigation25 156162 ZON 00 IRClosed

    Zoning

    May 8, 2025 · 25 MADISON AVE
  • By-law investigation25 125168 ZON 00 IRClosed

    Zoning

    Mar 5, 2025 · 25 MADISON AVE
  • By-law investigation25 104697 ZON 00 IRClosed

    Zoning

    Jan 14, 2025 · 25 MADISON AVE
  • Building permit23 218434Closed

    Proposed terrace roofing and balcony guard replacement to existing apartment building.

    Jan 26, 2024 · 25 MADISON AVE
  • Building permit20 220502Closed

    replacement and relocation of fire department connection

    Dec 17, 2020 · 25 MADISON AVE
Show 2 older records
  • Building permit19 182992Closed

    Proposal to replace the fire alarm panel and modifications to existing system (replacing end of line resistors, and non latching supervisory valves and smoke detectors at top north and south stairwells)

    Aug 1, 2019 · 25 MADISON AVE
  • Building permit13 205123Closed

    Proposal to install 1-1/4" back flow preventer in existing apartment building.

    Jul 23, 2013 · 25 MADISON AVE

Check before you build

  • Site-specific exception 900.11.10(2481)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2481)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulations 40.10.20.40 (1), 40.10.20.100 (18), and Clause 40.10.150.1 (Waste) dwelling units are permitted in building types with less than 5 dwelling units

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 251 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 219 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  5. Rule E

    On or between the even numbered addresses of 480-482 Huron St., 488 Huron St., the even numbered addresses of 490-494 Huron St., 13 Madison Ave., the odd numbered addresses of 15-19 Madison Ave., the odd numbered addresses of 21-25 Madison Ave., 27 Madison Ave., former City of Toronto by-law 318-75

  6. Rule F

    On the even numbered addresses of 480-482 Huron St., 488 Huron St., the even numbered addresses of 490-494 Huron St., 13 Madison Ave., the odd numbered addresses of 15-19 Madison Ave., the odd numbered addresses of 21-25 Madison Ave., 27 Madison Ave., former City of Toronto by-law 319-75.

  7. Older by-law A

    Despite regulations 40.10.20.40 (1), 40.10.20.100 (18), and Clause 40.10.150.1 (Waste) dwelling units are permitted in building types with less than 5 dwelling units

  8. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 251 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86

  9. Older by-law C

    Section 12(2) 219 of former City of Toronto By-law 438-86

  10. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  11. Older by-law E

    On or between the even numbered addresses of 480-482 Huron St., 488 Huron St., the even numbered addresses of 490-494 Huron St., 13 Madison Ave., the odd numbered addresses of 15-19 Madison Ave., the odd numbered addresses of 21-25 Madison Ave., 27 Madison Ave., former City of Toronto by-law 318-75

  12. Older by-law F

    On the even numbered addresses of 480-482 Huron St., 488 Huron St., the even numbered addresses of 490-494 Huron St., 13 Madison Ave., the odd numbered addresses of 15-19 Madison Ave., the odd numbered addresses of 21-25 Madison Ave., 27 Madison Ave., former City of Toronto by-law 319-75.

By-law 569-2013, Chapter 900

Lot facts

Area
965 m²
Frontage
31 mestimated, irregular lot
Depth
54.9 mestimated, irregular lot
Street
Madison Ave
Corner lot
No
Public lane
None
House footprint
304 m²roof up to 17.2 m
Back yard
7 mhouse to rear lot line
Side yards
0 m and 1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 198. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Spadina. The lot is inside the Spadina Major Transit Station Area approved by the Province (Site and Area Specific Policy 597). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 1.5 (c1.5; r1.0) SS2 (x2481) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
91%21 of 23 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
13
Development applications
21

Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing two-and-one-half-storey commercial building (eating establishment) into a mixed-use building by constructing a rear five-storey addition. This altered building will contain one non-residential unit (including one bar/pub, and five office spaces), one residential dwelling unit (to be located on the fifth storey), side (west) third and fourth storey terraces, a side (east) fifth storey terraces, a rear parking pad (for one visitor parking space and one accessible parking space), and a rear yard ancillary building (waste and recyclable material storage shed). This existing building is a heritage building.

    36 PRINCE ARTHUR AVE · Jul 23, 2025 · 460 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 595-2021(OLT), as amended by City Wide By-law 569-2013), for a new mixed-use building.

    316 BLOOR ST W · Dec 13, 2023 · 141 m away
  • Minor varianceRefused

    To alter the development standards, as approved within Site Specific Zoning By-law 73-2021, which include changes to the overall tower height (29-storeys to 34-storeys) and a reduction of indoor amenity space.

    478 HURON ST · Nov 8, 2023 · 60 m away
  • Minor varianceApproved

    To alter the existing three-storey building containing office and residential uses, by removing the existing covered parking area between the east and west wing of the building and constructing a ground floor addition for new infilled office space with a new lobby entrance. One parking space will be provided on-site.

    23 BEDFORD RD · Jun 21, 2023 · 438 m away
  • Minor varianceApproved

    To maintain the existing three-storey and two-and-one-half-storey residential buildings.

    490 HURON ST · Apr 26, 2023 · 28 m away

Latest activity nearby

  • Building permitmultiplex

    Proposal for HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    482 HURON ST · Nov 10, 2026 · 44 m away
  • Building permitmultiplex

    Proposal for HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    480 HURON ST · Nov 10, 2026 · 50 m away
  • Building permit

    HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    492 HURON ST · Nov 5, 2026 · 26 m away
  • Building permit

    REPAIRS TO EXISITING REAR SECOND FLOOR DECK

    23 MADISON AVE · Nov 5, 2026 · 24 m away
  • Building permit

    Proposal to replace existing roof mounted life-safety natural gas emergency generator with a new outdoor life-safety natural gas generator.

    341 BLOOR ST W · Nov 4, 2026 · 204 m away
  • Building permit

    Repairs to existing rear second floor deck

    27 MADISON AVE · Nov 4, 2026 · 26 m away
  • Building permit

    Proposal for Installation of roof edge railings, roof mounted stair and ladder ports at TTC's St. George Station -St. George Entrance

    139 ST GEORGE ST · Oct 29, 2026 · 228 m away
  • Building permit

    Proposal for installation of roof edge railings, roof mounted stair, fixed ladder and ladder port at TTC's Spadina Stn -Main Entrance

    7 SPADINA RD · Oct 28, 2026 · 139 m away
  • Building permit

    Proposal for installation of roof edge railings and ladder port at TTC's Spadina Stn. - Walmer Entrance

    9 WALMER RD · Oct 28, 2026 · 283 m away
  • Building permit

    Interior alterations to include a new in-suite laundry and renovation of 2 bathrooms and kitchen. All new fixtures and new laundry to tie into existing rough-in plumbing locations.

    190 ST GEORGE ST · Oct 14, 2026 · 173 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Spadina Station3 min walk
Nearest TTC stop
Spadina Station2 min walk
Nearest cycling route
Huron StSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
2,401 vehicles in 8 hPrince Arthur Ave / Huron St, 50 m away, May 5, 2005
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
Parks
Paul Martel Park1 min walk
Huron Street Playground2 min walk
Matt Cohen Park3 min walk

Schools within 1 km

  • HOWLETT ACADEMY SCHOOL Private 1 min walk
  • TADDLE CREEK MONTESSORI SCHOOL Private 2 min walk
  • UNIVERSITY OF TORONTO SCHOOLS Private 3 min walk
  • HURON STREET JR PUBLIC SCHOOL English Public 4 min walk
  • PAUL PENNA DOWNTOWN JEWISH DAY SCHOOL & MILES NADAL JEWISH COMMUNITY CENTRE Private 4 min walk
  • SCHOOL OF CONTINUING STUDIES - U OF T, BLDG 103 University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.