HousePrecheckCheck an address

25 Herron AveToronto · zoning, lot size and permit records

Open space · ON≈ 339.5 × 1328.1 m219,668 m²on Florens Avecorner, also on Herron Ave

Not a home

Parklands

The City of Toronto's real estate inventory lists Parklands here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
≈ 339.5 m frontage≈ 1328.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Warden Woods

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit08 163400Closednew building, new house

    REV #1-ENLARGE REAR DECKMODEL # MODEL NAME "LILY" ELEVATION "A" LOT 4CONSTRUCT NEW SINGLE FAMILY DWELLING

    Oct 16, 2009 · 25 HERRON AVE
  • Building permit08 163391Closednew building, new house

    REV. #1- Finishing basement MODEL # MODEL NAME "GARDINIA" ELEVATION "B" LOT 1 CONSTRUCT NEW SINGLE FAMILY DWELLING

    May 12, 2009 · 25 HERRON AVE
  • Building permit08 162042Closednew building, new house

    MODEL # "" MODEL NAME "LILAC 1" ELEVATION "A" CONSTRUCT NEW SINGLE FAMILY DWELLING

    Nov 14, 2008 · 25 HERRON AVE
  • Zoning review07 276903 PSPClosed
    Nov 7, 2007 · 25 HERRON AVE
  • Building permit07 129233Closeddemolition

    to demolish a 1.5storey's brick family residential building for the purpose of future developments

    Jul 20, 2007 · 25 HERRON AVE
  • Zoning review05 162250 PLOClosed
    Jul 20, 2005 · 25 HERRON AVE

Lot facts

Area
219,668 m²
Frontage
339.5 mestimated, irregular lot
Depth
1,328.1 mestimated, irregular lot
Street
Florens Ave
Corner lot
Yes, also on Herron Ave1,328.1 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source

Around this lot

Minor variances approved
67%2 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    Accepted

    30 HERRON AVE · Nov 4, 2026 · 273 m away
  • Zoning review

    Notice Sent

    30 HERRON AVE · Jul 6, 2026 · 273 m away
  • Minor varianceRefused

    To alter the existing two-storey detached dwelling by constructing a three-storey rear yard addition, front yard balcony and to convert the single-family dwelling into a multiplex. There will be a total of 3 dwelling units on the lot. This application was previously deferred at the November 5, 2025 hearing.

    1 BRODERICK PL · May 6, 2026 · 195 m away
  • Building permit

    Proposed exterior sunroom on existing exterior deck backyard. Structural. Order to comply No. 23 137194 WNP 00V1 exterior balcony glass shed. The following observations have been made: design drawings prepared for permit submission for the as-built glass shed.

    7 BRODERICK PL · Apr 2, 2026 · 155 m away
  • Building permitsecondary suite

    REVISION - revised window as per the drawingsProposal for Legal Basement apartment and above grade side entrance

    15 MOREAU TRL · Feb 23, 2026 · 275 m away
  • Zoning review

    Closed

    1 BRODERICK PL · Feb 12, 2026 · 195 m away
  • Building permitsecondary suite

    Proposal for basement walkout

    15 MOREAU TRL · Jan 12, 2026 · 275 m away
  • Zoning review

    Cancelled

    1 BRODERICK PL · Nov 7, 2025 · 195 m away
  • Minor variancePending

    Cancelled

    1 BRODERICK PL · Sep 4, 2025 · 195 m away
  • Building permit

    HVAC - Proposed 1-storey backyard extension and existing covered area to be demolished.

    22 HERRON AVE · Jul 4, 2025 · 239 m away

Neighbourhood: Oakridge

About the area around the lot, not the lot itself.

Nearest station
Warden Station13 min walk
Nearest TTC stop
682 Warden Ave4 min walk
Nearest cycling route
Gus Harris TrlMulti-Use Trail, 1 min walk
Nearest traffic count
491 vehicles in 8 hHerron Ave / Nancy Ave, 270 m away, Apr 6, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Warden Woods Park1 min walk
Moreau Trail Park3 min walk
Firvalley Woods3 min walk

Schools within 1 km

  • REGENT HEIGHTS PUBLIC SCHOOL English Public 10 min walk
  • TAYLOR CREEK PUBLIC SCHOOL English Public 12 min walk
  • DANFORTH GARDENS PUBLIC SCHOOL English Public 15 min walk
  • ST JOACHIM CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureOakridgeMedian neighbourhood
Median household income (2020)$60,000$84,500
Households that own their home31%54%
Population (2021)13,70516,813
Homes built in 1960 or before33%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleOakridgeCity median
Assault1276.2636.3
Robbery57.769.5
Shootings12.810.5
Auto theft160.3192.6
Theft over $5,00044.946.1
Break and enter230.9172.8
Theft from vehicles198.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.