HousePrecheckCheck an address

25 Centennial Park RdToronto · zoning, lot size and permit records

Institutional · I56.6 × 69.8 m3,805 m²on Centennial Park Rd

Not a home

An institution

The zoning by-law sets this parcel aside for an institution. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An institutionVisitors, traffic and parking in its busy hours.
N20 m
56.6 m frontage69.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    2 records on file: more than at 72% of Toronto houses (median 0).

    • Building permit15 246102Closed

      Proposal to replace fire alarm on basement and first floor

      Feb 12, 2016 · 25 CENTENNIAL PARK RD
    • Building permit98 085369Closed

      NEW SPRINKLER SYSTEM TO RETIREMENT HOME

      Mar 31, 1999 · 25 CENTENNIAL PARK RD

    Lot facts

    Area
    3,805 m²
    Frontage
    56.6 m
    Depth
    69.8 m
    Street
    Centennial Park Rd
    Corner lot
    No
    Public lane
    None
    House footprint
    2,257 m²roof up to 14.4 m
    Back yard
    3.4 mhouse to rear lot line
    Side yards
    2.3 m and 5.4 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    14 m
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone I (Institutional). Chapter 80, section 80.10 of the by-law. Source
    • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: linden (23 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    2

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Installation of a new 4" interior backwater valve.

      1 CENTENNIAL PARK RD · Nov 25, 2026 · 206 m away
    • Building permit

      Backwater valve Installation

      506 RATHBURN RD · Jul 20, 2026 · 287 m away
    • Building permit

      Install one 30'x40' temporary tent for media from May 21st-June 5th, 2026

      56 CENTENNIAL PARK RD · May 14, 2026 · 269 m away
    • Building permitnew building

      Proposed new washroom building and all associated structural, mechanical and electrical work.

      56 CENTENNIAL PARK RD · Jan 30, 2026 · 269 m away
    • Building permitgarden suite

      REV: Proposed revision to 2nd floor layout and new bathroom windowProposal for a new garden suite.

      571 RENFORTH DR · Nov 26, 2025 · 192 m away
    • Building permit

      1 DEVELOPMENT GROUND SIGN**URBAN TOWNS**

      596 RENFORTH DR · Nov 12, 2025 · 82 m away
    • Building permit

      1 DEVELOPMENT GROUND SIGN**URBAN TOWNS**

      596 RENFORTH DR · Nov 3, 2025 · 82 m away
    • Building permit

      1 Ground Sign

      596 RENFORTH DR · Oct 23, 2025 · 82 m away
    • Building permit

      Proposed removal and replacement of existing wood frame balconies/decks at rear of unit in existing townhouse subdivision

      500 RENFORTH DR · Oct 6, 2025 · 229 m away
    • Building permit

      Proposed renovations and extension of existing Park buildings.

      56 CENTENNIAL PARK RD · Oct 3, 2025 · 269 m away

    Neighbourhood: Eringate-Centennial-West Deane

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Rathburn Rd at Renforth Dr West Side4 min walk
    Nearest cycling route
    Centennial Park RdMulti-Use Trail, 1 min walk
    Nearest traffic count
    8,947 vehicles in 14 hCentennial Park Rd / Rathburn Rd, 260 m away, Aug 19, 2025
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Centennial Park - Etobicoke1 min walk
    Christ the King Park8 min walk
    Elmcrest Park9 min walk

    Schools within 1 km

    • SENECA SCHOOL English Public 4 min walk
    • HOLLYCREST MDL SCHOOL English Public 5 min walk
    • NATIVITY OF OUR LORD CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
    • WELLESWORTH JR SCHOOL English Public 9 min walk
    • MICHAEL POWER ST JOSEPH CATHOLIC HIGH SCHOOL English Separate 11 min walk
    • BROADACRES JR SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEringate-Centennial-West DeaneMedian neighbourhood
    Median household income (2020)$108,000$84,500
    Households that own their home84%54%
    Population (2021)18,45016,813
    Homes built in 1960 or before29%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEringate-Centennial-West DeaneCity median
    Assault393.3636.3
    Robbery29.969.5
    Shootings1010.5
    Auto theft234192.6
    Theft over $5,00024.946.1
    Break and enter109.5172.8
    Theft from vehicles114.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.