HousePrecheckCheck an address

24A Darrell AveToronto · zoning, lot size and permit records

Also 24B Darrell Ave, 26A Darrell Ave, 26B Darrell Ave, 28A Darrell Ave, 28B Darrell Ave and 2 more

Residential · R (d0.6) (x741)34.9 × 24.5 m743 m²on Darrell Ave

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.1 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelStill open in the City's records: 06 153847 (Construct new residential building containing 4 dwelling units. BUILDING B, 2007, status Inspection); 06 153834 (Construct new 3-storey residential building containing 4 dwelling units. BUILDING A, 2007, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
34.9 m frontage24.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 06 153847 (Construct new residential building containing 4 dwelling units. BUILDING B, 2007, status Inspection); 06 153834 (Construct new 3-storey residential building containing 4 dwelling units. BUILDING A, 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Zoning review08 175833 ZPRClosed
    Jun 26, 2008 · 30 DARRELL AVE
  • Building permit06 153847Inspectionnew building

    Construct new residential building containing 4 dwelling units. BUILDING B

    Jan 22, 2007 · 30 DARRELL AVE
  • Building permit06 153834Inspectionnew building

    Construct new 3-storey residential building containing 4 dwelling units. BUILDING A

    Jan 22, 2007 · 30 DARRELL AVE
  • Zoning review04 172893 ZPRClosed
    Sep 10, 2004 · 30 DARRELL AVE

Check before you build

  • Exception 900.2.10(741) does not apply to this address

    Good to know

    The exception covers this area, but each of its 3 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(741)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

3 parts for other addresses
  • A On the odd numbered addresses of 419-425 Coxwell Ave., former City of Toronto by-law 384-91
  • B On 426 Coxwell Ave., former City of Toronto by-law 248-83
  • C On or between the even numbered addresses of 12-22 Darrell Ave., former City of Toronto by-law 231-80.
By-law 569-2013, Chapter 900

Lot facts

Area
743 m²
Frontage
34.9 m
Depth
24.5 m
Street
Darrell Ave
Corner lot
No
Public lane
None
House footprint
158 m²roof up to 14 m
Back yard
7.4 mhouse to rear lot line
Side yards
3.5 m and 17.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone R (d0.6) (x741) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
93%27 of 29 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a basement addition below.

    29 IONA AVE · Jul 8, 2026 · 326 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by reconstructing the front enclosed porch (including the stairs).

    84 GLENMORE RD · Jun 3, 2026 · 471 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by enclosing the front porch into habitable space. Also, to construct a new front landing with stairs.

    24 CEDARVALE AVE · Apr 15, 2026 · 252 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition (the existing rear one-storey will be demolished).

    34 DARRELL AVE · Nov 19, 2025 · 24 m away
  • Minor varianceApproved

    To construct a new one-storey ancillary building (to contain one garden suite with storage and bicycle parking), in the rear yard of the existing two-storey semi-detached dwelling. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    49 WEST LYNN AVE · Aug 20, 2025 · 419 m away

Latest activity nearby

  • Building permit

    Proposal for the reconstruction of an existing enclosed porch with new stair and guard

    8 CEDARVALE AVE · Nov 18, 2026 · 203 m away
  • Building permit

    INCREASE OPENING OF GROUND FLOOR LOAD BEARING WALL AND STRUCTURAL REINFORCEMENT, NEW POWDER ROOM ON GROUND FLOOR.

    41 BEACH VIEW CRES · Nov 17, 2026 · 267 m away
  • Zoning review

    Closed

    8 CEDARVALE AVE · Oct 7, 2026 · 203 m away
  • Zoning review

    Notice Sent

    2094 GERRARD ST E · Sep 24, 2026 · 289 m away
  • Building permit

    Backwatewr valve

    711 WOODBINE AVE · Sep 24, 2026 · 277 m away
  • Building permit

    Proposal for interior alterations to ground floor for new takeout bakery.

    1926 GERRARD ST E · Sep 23, 2026 · 193 m away
  • Zoning review

    Closed

    1929 GERRARD ST E · Aug 27, 2026 · 206 m away
  • Building permit

    backwater valve installation

    29 AMROTH AVE · Aug 26, 2026 · 251 m away
  • Zoning review

    Closed

    1933 GERRARD ST E · Aug 17, 2026 · 198 m away
  • Zoning review

    Closed

    1908 GERRARD ST E · Aug 10, 2026 · 248 m away

Neighbourhood: East End-Danforth

About the area around the lot, not the lot itself.

Nearest station
Woodbine Station8 min walk
Nearest TTC stop
Gerrard St East at Golfview Ave2 min walk
Nearest cycling route
Woodbine AveCycle Track, 1 min walk
Nearest traffic count
10,158 vehicles in 8 hGerrard St E / Golfview Ave (West), 130 m away, Oct 21, 2003
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Oakcrest Parkette2 min walk
Wildwood Crescent Playground3 min walk
Cassels Avenue Playground4 min walk

Schools within 1 km

  • GLEDHILL JR PUBLIC SCHOOL English Public 10 min walk
  • NORWAY JR PUBLIC SCHOOL English Public 12 min walk
  • ST BRIGID CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • BOWMORE ROAD JR & SR PUBLIC SCHOOL English Public 12 min walk
  • DANFORTH LINC English Public 14 min walk
  • GEORGES ETIENNE CARTIER CATHOLIC ELEMENTARY SCHOOL French Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast End-DanforthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home55%54%
Population (2021)21,84016,813
Homes built in 1960 or before54%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast End-DanforthCity median
Assault796.2636.3
Robbery51.869.5
Shootings410.5
Auto theft147.3192.6
Theft over $5,00039.846.1
Break and enter195.1172.8
Theft from vehicles195.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.