HousePrecheckCheck an address

2480A Eglinton Ave EToronto · zoning, lot size and permit records

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x697)47.7 × 111.6 m5,301 m²on Eglinton Ave E

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Kennedy (Subway)The City plans more homes around the station: good for transit, and more building over time.
N50 m
47.7 m frontage111.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Site-specific exception 900.11.10(697)

      Needs a closer look

      2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.11.10(697)Applies

    These parts of the exception apply to this lot's address.

    1. Rule A

      The minimum building setback from a lot line that abuts a street is the greater of: (i) 3.0 metres from the lot line that abuts the street ; or (ii) 16.5 metres from the original centre line of Midland Ave. and 23.0 metres from the original centre line of Eglinton Ave.

    2. Rule B

      The minimum building setback from a lot line that abuts a lot in the Residential Zone category is 7.5. Prevailing By-laws and Prevailing Sections: (None Apply)

    3. Older by-law A

      The minimum building setback from a lot line that abuts a street is the greater of: (i) 3.0 metres from the lot line that abuts the street ; or (ii) 16.5 metres from the original centre line of Midland Ave. and 23.0 metres from the original centre line of Eglinton Ave.

    4. Older by-law B

      The minimum building setback from a lot line that abuts a lot in the Residential Zone category is 7.5. Prevailing By-laws and Prevailing Sections: (None Apply)

    By-law 569-2013, Chapter 900

    Lot facts

    Area
    5,301 m²
    Frontage
    47.7 m
    Depth
    111.6 m
    Street
    Eglinton Ave E
    Corner lot
    No
    Public lane
    None
    House footprint
    1,446 m²roof up to 9.1 m
    Back yard
    37.6 mhouse to rear lot line
    Side yards
    0.1 m and 1.8 mhouse to side lot lines; 0 is a shared wall
    Buildings on the lot
    1house, garage, sheds
    Max height
    11 m
    Max lot coverage
    33%

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Major Transit Station Area: Kennedy (Subway). The lot is inside the Kennedy (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 647). Source
    • Zone CR 0.4 (c0.4; r0.0) SS3 (x697) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    0

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing mixed-use building by constructing interior alterations to convert ground floor retail space into 4 residential units.

      2495 EGLINTON AVE E · Feb 11, 2026 · 99 m away
    • Minor varianceApproved

      To construct an addition to the front and rear of the existing commercial building.

      2584 EGLINTON AVE E · Oct 15, 2015 · 436 m away

    Latest activity nearby

    • Zoning review

      Closed

      2480 EGLINTON AVE E · Sep 25, 2026 · 34 m away
    • Zoning review

      Closed

      2495 EGLINTON AVE E · Jul 8, 2026 · 99 m away
    • Building permit

      Proposed replacement of the fire alarm system

      2467 EGLINTON AVE E · Jul 7, 2026 · 275 m away
    • Building permitgarden suite

      Proposal to convert the existing garage to a Garden Suite

      795 MIDLAND AVE · Apr 29, 2026 · 282 m away
    • Building permit

      Proposal for replacement of existing fire pump and sprinkler header and associated electrical components.

      120 TOWN HAVEN PL · Apr 15, 2026 · 186 m away
    • Building permit

      Proposal for a canopy at rear.

      9 LORD ROBERTS DR · Mar 4, 2026 · 87 m away
    • Minor varianceApproved

      To alter the existing mixed-use building by constructing interior alterations to convert ground floor retail space into 4 residential units.

      2495 EGLINTON AVE E · Feb 11, 2026 · 99 m away
    • Building permit

      Revision01 - Construction of 1-hour fire-rated bulkhead for the installation of the new strobe circuit wiring.Proposal to modify existing Fire Alarm control panel to add two (2) visual strobe signal devices in a hearing impaired tenants Apt.

      120 TOWN HAVEN PL · Jan 6, 2026 · 186 m away
    • Zoning review

      Response Received

      932 MIDLAND AVE · Dec 11, 2025 · 194 m away
    • Building permit

      1 GROUND SIGN**MIDLAND PLAZA**

      2480 EGLINTON AVE E · Nov 14, 2025 · 34 m away

    Neighbourhood: Eglinton East

    About the area around the lot, not the lot itself.

    Nearest station
    Kennedy Station7 min walk
    Nearest TTC stop
    Eglinton Ave East at Midland Ave West Side2 min walk
    Nearest cycling route
    Gatineau Hydro Corridor TrlMulti-Use Trail, 6 min walk
    Nearest traffic count
    30,585 vehicles in 14 hEglinton Ave E (id: 13452567), 90 m away, Sep 24, 2025
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Glen Ravine Park6 min walk
    Kitchener Park9 min walk
    Treverton Park9 min walk

    Schools within 1 km

    • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 6 min walk
    • GLEN RAVINE JR PUBLIC SCHOOL English Public 10 min walk
    • A PLUS ACADEMY OF ADVANCEMENT Private 11 min walk
    • SALAHEDDIN ISLAMIC SCHOOL Private 11 min walk
    • WALTER PERRY JR PUBLIC SCHOOL English Public 12 min walk
    • ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEglinton EastMedian neighbourhood
    Median household income (2020)$73,500$84,500
    Households that own their home47%54%
    Population (2021)22,53516,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEglinton EastCity median
    Assault825.8636.3
    Robbery65.669.5
    Shootings15.410.5
    Auto theft270.1192.6
    Theft over $5,00061.746.1
    Break and enter150.5172.8
    Theft from vehicles559.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.