HousePrecheckCheck an address

2468 Dufferin StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c2.0; r2.0) SS224.1 × 33.9 m734 m²on Dufferin Stcorner, also on Roselawn Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 12 213071 (Renovation to sales office for Royal Park Homes, 2012, status Inspection); 09 195559 (To demo part of building and front part to remain, 2012, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 27 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N10 m
24.1 m frontage33.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 12 213071 (Renovation to sales office for Royal Park Homes, 2012, status Inspection); 09 195559 (To demo part of building and front part to remain, 2012, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 27 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Zoning review25 141758 LTOClosed
    Apr 9, 2025 · 2468 DUFFERIN ST
  • Zoning review17 105379 LPRClosed
    Jan 17, 2017 · 2468 DUFFERIN ST
  • Building permit12 213071Inspection

    Renovation to sales office for Royal Park Homes.

    Sep 24, 2012 · 2468 DUFFERIN ST
  • Building permit09 195559Permit Issued

    To demo part of building and front part to remain.

    Sep 18, 2012 · 2468 DUFFERIN ST
  • Building permit12 237970Cancelled

    DEVELOPMENT SIGNSTo erect and display two non-illuminated static copy wall signs at the northerly and easterly elevation of the building in conjunction with the sales and marketing of a condominium development.**Town Residences on the Trail****royalpark.com**

    Sep 14, 2012 · 2468 DUFFERIN ST
  • Building permit09 176341Cancelleddemolition

    Demolition of a one storey Industrial building.

    Oct 6, 2009 · 2468 DUFFERIN ST
  • Zoning review06 123756 LTOClosed
    Apr 6, 2006 · 2468 DUFFERIN ST
  • Zoning review00 135571 000Closed
    Mar 15, 2000 · 2468 DUFFERIN ST

Lot facts

Area
734 m²
Frontage
24.1 m
Depth
33.9 m
Street
Dufferin St
Corner lot
Yes, also on Roselawn Ave33.9 m along it
Public lane
None
Max height
15 m
Max lot coverage
—
  • Zone CR 2.0 (c2.0; r2.0) SS2 (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%8 of 8 decisions
Garden suite permits
7
Laneway suite permits
0
Multiplex permits
6
Development applications
6

Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an 11-storey mixed use building. The property was the subject of a previous Minor Variance application (File No. A0243/21NY) to permit a 9-storey mixed use building, which was approved on condition.

    1886 EGLINTON AVE W · Aug 20, 2026 · 493 m away
  • Minor varianceApproved

    To construct a mixed-use building containing 194 units, retail on ground floor and parking.

    1886 EGLINTON AVE W · Jun 17, 2021 · 493 m away
  • Minor varianceApproved

    To construct an addition to front of the exisiting building.

    1 RAMSDEN RD · Jan 16, 2020 · 434 m away
  • Minor varianceApproved

    The applicant is proposing to provide 60 parking spaces for the new office building.

    2462 DUFFERIN ST · Jan 9, 2013 · 64 m away

Latest activity nearby

  • Building permitgarden suite

    New one storey rear yard garden suite

    592 RIDELLE AVE · Oct 23, 2026 · 226 m away
  • Minor varianceApproved

    To permit the construction of a new Garden Suite, in the rear yard of the Subject Property.

    1126 ROSELAWN AVE · Oct 15, 2026 · 40 m away
  • Building permitdemolition

    DEMOLITION OF EXISTING SINGLE FAMILY DETACHED RESIDENCE AND ATTACHED GARAGE

    592 RIDELLE AVE · Sep 28, 2026 · 226 m away
  • Building permitmultiplex, new building, new house

    New three-storey detached residential fourplex.

    592 RIDELLE AVE · Sep 28, 2026 · 226 m away
  • Building permitdemolition, multiplex

    NEW THREE STOREY DETACHED RESIDENTIAL FOURPLEX

    594 RIDELLE AVE · Sep 23, 2026 · 221 m away
  • Building permitgarden suite

    Proposal for one storey garden suite with basement.

    594 RIDELLE AVE · Sep 23, 2026 · 221 m away
  • Building permitmultiplex, new building, new house

    NEW THREE STOREY DETACHED RESIDENTIAL FOURPLEX

    594 RIDELLE AVE · Sep 23, 2026 · 221 m away
  • Building permit

    1 wall sign.***BLOOMSBURY FINE CABINETRY***

    1142 CASTLEFIELD AVE · Sep 3, 2026 · 129 m away
  • Building permit

    1 wall sign**NORTHERN WIDE PLANK**

    1142 CASTLEFIELD AVE · Aug 18, 2026 · 129 m away
  • Building permitgarden suite

    Garden suite

    1126 ROSELAWN AVE · Jul 28, 2026 · 40 m away

Neighbourhood: Briar Hill-Belgravia

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station9 min walk
Nearest TTC stop
Castlefield Ave at Dufferin St1 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 2 min walk
Nearest traffic count
36,046 vehicles in 14 hDufferin St / Castlefield Ave, 80 m away, Sep 5, 2024
Serious collisions within 500 m
42021–2026, killed or seriously injured: 2 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
J.T. Watson Parkette2 min walk
Walter Saunders Memorial Park3 min walk

Schools within 1 km

  • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 11 min walk
  • LYCEE FRANCAIS DE TORONTO Private 12 min walk
  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 16 min walk
  • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBriar Hill-BelgraviaMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home48%54%
Population (2021)14,57516,813
Homes built in 1960 or before37%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBriar Hill-BelgraviaCity median
Assault684.5636.3
Robbery73.369.5
Shootings12.210.5
Auto theft262.8192.6
Theft over $5,00048.946.1
Break and enter207.8172.8
Theft from vehicles146.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.