HousePrecheckCheck an address

244 Eglinton Ave ENorth Toronto, Toronto · City records before you offer

Commercial residential · CR 5.0 (c3.0; r3.0) SS2 (x2497)17.1 × 41.2 m630 m²on Eglinton Ave E

Nothing to check before you offer in the City's records
N20 m
17.1 m frontage41.2 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 244 Eglinton Ave E

244 Eglinton Ave E is on a 17.1 m by 41.2 m lot on Eglinton Ave E in North Toronto. The zoning is CR. A site-specific exception, 900.11.10(2497), changes some of the usual rules for this address.

The City has 9 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Backflow device replacement". Status: closed. In 2024, a building permit was filed: "Revision 01: the modifications entail the inclusion of two (2) ac units to supplement fresh air supply in accordance with the obc and ashrae 62.1…". Status: closed. In 2023, a building permit was filed: "Proposal to intall 1 maglock on the ground floor of an existing office building". Status: closed. Nothing on file is open right now.

Within 300 m, 25 development applications are open (the tallest up to 61 storeys). Mount Pleasant station is a 1-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Site-specific exception 900.11.10(2497)Moderate
  • 25 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Clear

Open City files

How much in the City's records needs answers before an offer

  • No open orders or by-law investigations
  • No permits left open for years
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

City files on this lot

9 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-05Building permit
26 251858
Backflow Device ReplacementClosed
2025-06-12By-law investigation
25 176282 GRA 00 IR
GraffitiClosed
2024-05-24Building permit
23 116520
REVISION 01: The modifications entail the inclusion of two (2) AC units to supplement fresh air supply in accordance with the OBC and ASHRAE 62.1 standards.HVAC - Proposal for interior alterations to all floors of an existing office building.Closed
2023-08-30Building permit
23 193999
Proposal to intall 1 maglock on the ground floor of an existing office building.Closed
2022-10-19Building permit
22 203769
HVAC - Back to base building condition interior demolition on the ground/1st/2nd/3rd floor.Closed
2018-04-10Building permit
18 119468
Interior alteration to private offices, modification of kitchenette.Closed
2012-11-30Building permit
12 275482
Proposal to replace existing fire alarm control panel in basement of existing office building.Closed
2009-03-30Building permit
09 120442
No description on fileClosed
2006-06-20Building permit
06 138352
HVAC - Proposed interior alterations to portions of Ground, 3rd and 4th floors of Single tenant building.Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2497)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2497)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2497)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
17.1 m frontage41.2 m deepon Eglinton Ave E
Zone
CR 5.0 (c3.0; r3.0) SS2 (x2497)
Height limit
48 m
Corner lot
No
Public lane
None
House footprint
553 m²
Back yard
2.6 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 25 development applications open within 300 m, up to 61 storeys
    • In the Mount Pleasant station area
    • 1 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 25 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    North Toronto neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$70,000median $84,500
    Households that own their home19%median 54%
    Population (2021)15,885median 16,813
    Homes built in 1960 or before9%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • Mount Pleasant StationNearest station1 min walk
    • Eglinton Ave East at Mt Pleasant Rd West SideNearest TTC stop1 min walk
    • Broadway AveNearest cycling route5 min walk
    • Eglinton Jr Public SchoolSchool1 min walk
    • Toronto Stem SchoolSchool4 min walk
    • Northern Secondary SchoolSchool4 min walk
    • Willowdale High SchoolSchool4 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3626.8
    • Robberycity median 69.553.4
    • Auto theftcity median 192.668
    • Theft over $5,000city median 46.124.3
    • Break and entercity median 172.8174.9
    • Theft from vehiclescity median 188.163.2

    More about North Toronto

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 244 Eglinton Ave E

    Nothing in the City's records needs answers before an offer on 244 Eglinton Ave E

    The report lists the 15 record sets we checked and shows what the City allowed next door. You get it as a PDF for your agent and lawyer, and we watch the address for 90 days.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.