Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2023
Needs a closer lookStill open in the City's records: 22 200054 (Construction of a new Ventilation Fan Plant west of Kennedy Station as part of the Scar..., 2023, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 233743 (Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
20 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 233743Permit Issued
Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy TTC Station.
Sep 25, 2026 · 2439 EGLINTON AVE E - Building permit24 123307Closed
FS - Commercial Kitchen Exhaust Exitinguishing Shop Drawings - HVAC Permit Application for only the GO area at ECLRT Kennedy Station
Jun 17, 2024 · 2439 EGLINTON AVE E - Building permit24 124440Closed
Plumbing Permit Application for only the GO area at ECLRT Kennedy Station
Apr 2, 2024 · 2439 EGLINTON AVE E - Building permit24 111941Closed
Installation of faregates to Kennedy Station for ECLRT
Feb 15, 2024 · 2439 EGLINTON AVE E - Building permit24 102521Cancelled
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations
Jan 8, 2024 · 2439 EGLINTON AVE E - Building permit19 121442Closed
Revision -1 - addition of platform edge bollardsConstruction Pharmacy side platform stop with 6 canopies for the future Eglinton CLRT Line along Eglinton Avenue East.
Sep 11, 2023 · 2439 EGLINTON AVE E - Building permit23 193687Approved
Protection of Standpipe Systems at all Stations
Aug 25, 2023 · 2439 EGLINTON AVE E - Building permit17 156422Closed
addition of platform edge bollards. (Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647)Revision 01 - sprinkler, handrail clearance, safety barrier handrail and guardrail, see attached list. Include Alternative Solution 19-259678Construction of Kennedy Station of the Eglinton Crosstown LRT - (Includes Early Works)
Apr 5, 2023 · 2439 EGLINTON AVE E
Show 12 older records
- Building permit22 200054Inspection
Construction of a new Ventilation Fan Plant west of Kennedy Station as part of the Scarborough Subway Extension
Jan 19, 2023 · 2439 EGLINTON AVE E - Building permit22 200930Approved
Provide edge installation for bollard barriers
Sep 8, 2022 · 2439 EGLINTON AVE E - Building permit19 199711Approved
Elevator shaft construction requirements
Aug 2, 2019 · 2439 EGLINTON AVE E - Zoning review18 226971 ZPRClosedSep 17, 2018 · 2439 EGLINTON AVE E
- Building permit17 210499Closed
Temporary Site Services from the city mains to the trailers for the Eglinton LRT at Kennedy Station
Sep 20, 2017 · 2439 EGLINTON AVE E - Building permit17 201386Cancelled
Temporary prefabricated washroom trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 4"
Jul 19, 2017 · 2439 EGLINTON AVE E - Building permit17 201370Cancelled
Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 3"
Jul 19, 2017 · 2439 EGLINTON AVE E - Building permit17 201285Cancelled
Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 2"
Jul 19, 2017 · 2439 EGLINTON AVE E - Building permit17 201216Cancelled
Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer1"
Jul 19, 2017 · 2439 EGLINTON AVE E - Building permit17 157639Closed
This Folder was closed by the system. PP child folders cannot be created using the 'Copy' button.The n_ParentRSN was: 4157759
May 10, 2017 · 2439 EGLINTON AVE E - Building permit16 251317Closed
Demolish existing Canada Post office (1672.25m2)
Dec 5, 2016 · 2439 EGLINTON AVE E - Development application13 204146 ESC 35 SAFinal Approval Completed
Application by METROLINX re: implementation of the Eglinton Cosstown LRT eastern terminus at Kennedy Station.
Jul 15, 2013 · 2439 EGLINTON AVE E · City file
Check before you build
Site-specific exception 900.11.10(572)
Needs a closer look6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses
- Rule B
The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area
- Rule C
The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue
- Rule D
The minimum building setback is 7.5 metres from a rear lot line
- Rule E
The requirements of (B), (C) and (D) above, do not apply to a transportation use
- Rule F
Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses
- Older by-law B
The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area
- Older by-law C
The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue
- Older by-law D
The minimum building setback is 7.5 metres from a rear lot line
- Older by-law E
The requirements of (B), (C) and (D) above, do not apply to a transportation use
- Older by-law F
Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 10,871 m²
- Frontage
- 116.5 mestimated, irregular lot
- Depth
- 167.4 mestimated, irregular lot
- Street
- Transway Cres
- Corner lot
- Yes, also on Eglinton Ave E167.4 m along it
- Public lane
- None
- House footprint
- 874 m²
- Back yard
- 128.8 mhouse to rear lot line
- Side yards
- 0.1 m and 89.6 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- 33%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%3 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Revision 01 - Revision to confirm the absence of a sprinkler system within the existing restaurant unit.-----------------------------------------------------------Proposed interior renovations to an existing dine-in restaurant use.
2391 EGLINTON AVE E · Nov 13, 2026 · 284 m away - Building permit
Proposal for a concrete retaining wall.
807 KENNEDY RD · Oct 28, 2026 · 269 m away - Building permit
Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy TTC Station.
2439 EGLINTON AVE E · Sep 25, 2026 · 51 m away - Zoning review
Closed
2425 EGLINTON AVE E · Aug 31, 2026 · 140 m away - Building permit
Revision 01: Revision to permit, sprinkler work permitProposal for interior alterations/additions to create five units (basement and ground floor).
807 KENNEDY RD · Aug 6, 2026 · 269 m away - Building permit
1 ground sign with electronic redograph copy*****St. MARIA GORETTI CATHOLICELEMENTARY SCHOOL******
21 KENMARK BLVD · Jun 26, 2026 · 265 m away - Building permit
Conditional Permit - Part Permit - Construct a new forty (40) storey apartment building containing 417 of non-profit market co-op and affordable co-op units, with a two storey podium
2444 EGLINTON AVE E · Jun 19, 2026 · 189 m away - Building permit
1 ground sign with electronic redograph copy**TORONTO CATHOLIC DISTRICT SCHOOL BOARD**
21 KENMARK BLVD · Apr 17, 2026 · 265 m away - Building permit
Demolition of Existing 1 storey industrial building with 1 basement level (re: two new apartment buildings containing non-profit market co-op and affordable co-op units.)
2444 EGLINTON AVE E · Feb 25, 2026 · 189 m away - Zoning review
Closed
723 KENNEDY RD · Feb 24, 2026 · 238 m away
Neighbourhood: Kennedy Park
About the area around the lot, not the lot itself.
- Nearest station
- Kennedy Station2 min walk
- Nearest TTC stop
- Kennedy Station - Westbound Platform1 min walk
- Nearest cycling route
- Gatineau Hydro Corridor TrlMulti-Use Trail, 2 min walk
- Nearest traffic count
- 26,666 vehicles in 8 hEglinton Ave E / Hydro Corridor, 80 m away, Jun 20, 2001
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Treverton Park6 min walk
- Farlinger Ravine8 min walk
- Eglinton Ravine Park9 min walk
Schools within 1 km
- A PLUS ACADEMY OF ADVANCEMENT Private 2 min walk
- SALAHEDDIN ISLAMIC SCHOOL Private 2 min walk
- ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
- CORVETTE JR PUBLIC SCHOOL English Public 11 min walk
- ST JOAN OF ARC CATHOLIC ACADEMY English Separate 13 min walk
- S/E YEAR ROUND ALTERNATIVE & SCARBOROUGH CENTRE English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kennedy Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,000 | $84,500 |
| Households that own their home | 52% | 54% |
| Population (2021) | 17,110 | 16,813 |
| Homes built in 1960 or before | 34% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kennedy Park | City median |
|---|---|---|
| Assault | 1521.5 | 636.3 |
| Robbery | 121.5 | 69.5 |
| Homicide | 5.3 | 5.3 |
| Shootings | 15.8 | 10.5 |
| Auto theft | 211.3 | 192.6 |
| Theft over $5,000 | 84.5 | 46.1 |
| Break and enter | 158.5 | 172.8 |
| Theft from vehicles | 401.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.