HousePrecheckCheck an address

2439 Eglinton Ave EToronto · zoning, lot size and permit records

Also 2439 Eglinton Ave E, 70 Transway Cres

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x572)≈ 116.5 × 167.4 m10,871 m²on Transway Crescorner, also on Eglinton Ave E

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 233743 (Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • Major Transit Station Area: Kennedy (Subway)The City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 116.5 m frontage≈ 167.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 22 200054 (Construction of a new Ventilation Fan Plant west of Kennedy Station as part of the Scar..., 2023, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 233743 (Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

20 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 233743Permit Issued

    Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy TTC Station.

    Sep 25, 2026 · 2439 EGLINTON AVE E
  • Building permit24 123307Closed

    FS - Commercial Kitchen Exhaust Exitinguishing Shop Drawings - HVAC Permit Application for only the GO area at ECLRT Kennedy Station

    Jun 17, 2024 · 2439 EGLINTON AVE E
  • Building permit24 124440Closed

    Plumbing Permit Application for only the GO area at ECLRT Kennedy Station

    Apr 2, 2024 · 2439 EGLINTON AVE E
  • Building permit24 111941Closed

    Installation of faregates to Kennedy Station for ECLRT

    Feb 15, 2024 · 2439 EGLINTON AVE E
  • Building permit24 102521Cancelled

    Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations

    Jan 8, 2024 · 2439 EGLINTON AVE E
  • Building permit19 121442Closednew building

    Revision -1 - addition of platform edge bollardsConstruction Pharmacy side platform stop with 6 canopies for the future Eglinton CLRT Line along Eglinton Avenue East.

    Sep 11, 2023 · 2439 EGLINTON AVE E
  • Building permit23 193687Approved

    Protection of Standpipe Systems at all Stations

    Aug 25, 2023 · 2439 EGLINTON AVE E
  • Building permit17 156422Closednew building

    addition of platform edge bollards. (Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647)Revision 01 - sprinkler, handrail clearance, safety barrier handrail and guardrail, see attached list. Include Alternative Solution 19-259678Construction of Kennedy Station of the Eglinton Crosstown LRT - (Includes Early Works)

    Apr 5, 2023 · 2439 EGLINTON AVE E
Show 12 older records
  • Building permit22 200054Inspectionnew building

    Construction of a new Ventilation Fan Plant west of Kennedy Station as part of the Scarborough Subway Extension

    Jan 19, 2023 · 2439 EGLINTON AVE E
  • Building permit22 200930Approved

    Provide edge installation for bollard barriers

    Sep 8, 2022 · 2439 EGLINTON AVE E
  • Building permit19 199711Approved

    Elevator shaft construction requirements

    Aug 2, 2019 · 2439 EGLINTON AVE E
  • Zoning review18 226971 ZPRClosed
    Sep 17, 2018 · 2439 EGLINTON AVE E
  • Building permit17 210499Closed

    Temporary Site Services from the city mains to the trailers for the Eglinton LRT at Kennedy Station

    Sep 20, 2017 · 2439 EGLINTON AVE E
  • Building permit17 201386Cancelled

    Temporary prefabricated washroom trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 4"

    Jul 19, 2017 · 2439 EGLINTON AVE E
  • Building permit17 201370Cancelled

    Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 3"

    Jul 19, 2017 · 2439 EGLINTON AVE E
  • Building permit17 201285Cancelled

    Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer 2"

    Jul 19, 2017 · 2439 EGLINTON AVE E
  • Building permit17 201216Cancelled

    Temporary prefabricated office trailer for Metrolinx Eglinton Crosstown at Kennedy Station "Trailer1"

    Jul 19, 2017 · 2439 EGLINTON AVE E
  • Building permit17 157639Closed

    This Folder was closed by the system. PP child folders cannot be created using the 'Copy' button.The n_ParentRSN was: 4157759

    May 10, 2017 · 2439 EGLINTON AVE E
  • Building permit16 251317Closeddemolition

    Demolish existing Canada Post office (1672.25m2)

    Dec 5, 2016 · 2439 EGLINTON AVE E
  • Development application13 204146 ESC 35 SAFinal Approval Completed

    Application by METROLINX re: implementation of the Eglinton Cosstown LRT eastern terminus at Kennedy Station.

    Jul 15, 2013 · 2439 EGLINTON AVE E · City file

Check before you build

  • Site-specific exception 900.11.10(572)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(572)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses

  2. Rule B

    The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area

  3. Rule C

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue

  4. Rule D

    The minimum building setback is 7.5 metres from a rear lot line

  5. Rule E

    The requirements of (B), (C) and (D) above, do not apply to a transportation use

  6. Rule F

    Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)

  7. Older by-law A

    Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses

  8. Older by-law B

    The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area

  9. Older by-law C

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue

  10. Older by-law D

    The minimum building setback is 7.5 metres from a rear lot line

  11. Older by-law E

    The requirements of (B), (C) and (D) above, do not apply to a transportation use

  12. Older by-law F

    Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
10,871 m²
Frontage
116.5 mestimated, irregular lot
Depth
167.4 mestimated, irregular lot
Street
Transway Cres
Corner lot
Yes, also on Eglinton Ave E167.4 m along it
Public lane
None
House footprint
874 m²
Back yard
128.8 mhouse to rear lot line
Side yards
0.1 m and 89.6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Kennedy (Subway). The lot is inside the Kennedy (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 647). Source
  • Zone CR 0.4 (c0.4; r0.0) SS3 (x572) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Revision 01 - Revision to confirm the absence of a sprinkler system within the existing restaurant unit.-----------------------------------------------------------Proposed interior renovations to an existing dine-in restaurant use.

    2391 EGLINTON AVE E · Nov 13, 2026 · 284 m away
  • Building permit

    Proposal for a concrete retaining wall.

    807 KENNEDY RD · Oct 28, 2026 · 269 m away
  • Building permit

    Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy TTC Station.

    2439 EGLINTON AVE E · Sep 25, 2026 · 51 m away
  • Zoning review

    Closed

    2425 EGLINTON AVE E · Aug 31, 2026 · 140 m away
  • Building permit

    Revision 01: Revision to permit, sprinkler work permitProposal for interior alterations/additions to create five units (basement and ground floor).

    807 KENNEDY RD · Aug 6, 2026 · 269 m away
  • Building permit

    1 ground sign with electronic redograph copy*****St. MARIA GORETTI CATHOLICELEMENTARY SCHOOL******

    21 KENMARK BLVD · Jun 26, 2026 · 265 m away
  • Building permit

    Conditional Permit - Part Permit - Construct a new forty (40) storey apartment building containing 417 of non-profit market co-op and affordable co-op units, with a two storey podium

    2444 EGLINTON AVE E · Jun 19, 2026 · 189 m away
  • Building permit

    1 ground sign with electronic redograph copy**TORONTO CATHOLIC DISTRICT SCHOOL BOARD**

    21 KENMARK BLVD · Apr 17, 2026 · 265 m away
  • Building permitdemolition

    Demolition of Existing 1 storey industrial building with 1 basement level (re: two new apartment buildings containing non-profit market co-op and affordable co-op units.)

    2444 EGLINTON AVE E · Feb 25, 2026 · 189 m away
  • Zoning review

    Closed

    723 KENNEDY RD · Feb 24, 2026 · 238 m away

Neighbourhood: Kennedy Park

About the area around the lot, not the lot itself.

Nearest station
Kennedy Station2 min walk
Nearest TTC stop
Kennedy Station - Westbound Platform1 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 2 min walk
Nearest traffic count
26,666 vehicles in 8 hEglinton Ave E / Hydro Corridor, 80 m away, Jun 20, 2001
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Treverton Park6 min walk
Farlinger Ravine8 min walk
Eglinton Ravine Park9 min walk

Schools within 1 km

  • A PLUS ACADEMY OF ADVANCEMENT Private 2 min walk
  • SALAHEDDIN ISLAMIC SCHOOL Private 2 min walk
  • ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • CORVETTE JR PUBLIC SCHOOL English Public 11 min walk
  • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 13 min walk
  • S/E YEAR ROUND ALTERNATIVE & SCARBOROUGH CENTRE English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKennedy ParkMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home52%54%
Population (2021)17,11016,813
Homes built in 1960 or before34%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKennedy ParkCity median
Assault1521.5636.3
Robbery121.569.5
Homicide5.35.3
Shootings15.810.5
Auto theft211.3192.6
Theft over $5,00084.546.1
Break and enter158.5172.8
Theft from vehicles401.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.