HousePrecheckCheck an address

2400 Queen St EToronto · zoning, lot size and permit records

22.6 × 42.5 m882 m²on Queen St Ecorner, also on Victoria Park Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 32 rental units, built 1920More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 91 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
22.6 m frontage42.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Rental building evaluation: 91 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 32 units, built 1920).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit18 132632Closed

    Proposed installation of a new back flow prevention device within an existing apartment building.

    Apr 19, 2018 · 2400 QUEEN ST E
  • Building permit13 175176Closed

    Replace fire alarm panel

    May 30, 2013 · 2400 QUEEN ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
882 m²
Frontage
22.6 m
Depth
42.5 m
Street
Queen St E
Corner lot
Yes, also on Victoria Park Ave42.5 m along it
Public lane
None
House footprint
579 m²roof up to 16.1 m
Back yard
1.1 mhouse to rear lot line
Side yards
0.1 m and 1.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: oak, red (80 cm), maple, silver (67 cm), maple, norway (67 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%18 of 20 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey dwelling by constructing a rear yard one-storey addition.

    10 FALLINGBROOK RD · Jun 3, 2026 · 289 m away
  • Minor varianceApproved

    To alter the existing two-storey dwelling by constructing a rear yard one-storey addition.

    3012 QUEEN ST E · Jun 3, 2026 · 266 m away
  • Minor varianceApproved

    To permit a front (south) yard parking pad (located on a private driveway that does not lead directly to a garage) and construct a driveway, abutting Balmy Avenue. Also, to construct a new front walkway.

    20 BALMY AVE · Mar 18, 2026 · 368 m away
  • Minor varianceApproved

    To alter the existing four-storey detached dwelling by constructing a rear third storey and a fourth storey addition, a rear second storey covered deck with stairs, and a side (south) carport with two parking spaces.

    30 KINGSWOOD RD · Mar 11, 2026 · 303 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a new partial front addition (entry) and a front second-storey addition. The existing front second storey balcony will be demolished.

    93 SILVER BIRCH AVE · Feb 4, 2026 · 428 m away

Latest activity nearby

  • Building permit

    REPLACE ROOF DAMAGED BY FALLEN TREE

    128 NEVILLE PARK BLVD · Nov 5, 2026 · 243 m away
  • Building permit

    Proposal for a new exterior door to existing residential use.

    2493 QUEEN ST E · Nov 4, 2026 · 178 m away
  • Building permit

    Proposal for a one storey rear addition.

    10 FALLINGBROOK RD · Nov 3, 2026 · 289 m away
  • Building permit

    1 wall sign**PAWS IN THE BATH**

    2491 QUEEN ST E · Oct 26, 2026 · 185 m away
  • Building permit

    Proposal for underpinning, reinforce existing walls and add new foundations, walls, floors and roof to renovate and enlarge an existing single family home, with an enlarged basement connection to an existing single car garage.

    52 BLANTYRE AVE · Oct 21, 2026 · 239 m away
  • Zoning review

    Notice Sent

    2505 QUEEN ST E · Oct 8, 2026 · 147 m away
  • Building permit

    Proposed canopy installation over existing deck.

    8 WINDSOR AVE · Sep 22, 2026 · 297 m away
  • Building permit

    Proposed demolition of carports and resurfacing with asphalt

    2402 QUEEN ST E · Jul 23, 2026 · 19 m away
  • Building permit

    Revision 02: Roof structure replacement, basement slab insulation and replacement, enlarged openings, interior alterations. Ground floor layout and roofline have been modified slightly from initial application.REV 01: Foundation repairs. Progressive replacement of damaged foundation walls, reinforcement with helical pilesProposal for roof structure replacement, basement slab insulation and replacement, mechanical system replacement, enlarged openings, interior alterations

    5 ROCKAWAY CRES · Jul 16, 2026 · 267 m away
  • Building permit

    Proposal for a new rear window and light well, and interior alterations in the basement

    54 BLANTYRE AVE · Jul 6, 2026 · 246 m away

Neighbourhood: Birchcliffe-Cliffside

About the area around the lot, not the lot itself.

Nearest station
Victoria Park Station37 min walk
Nearest TTC stop
Queen St East at Neville Park Blvd2 min walk
Nearest cycling route
Queen St ESigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
4,227 vehicles in 8 hQueen St E / Victoria Park Ave, 40 m away, Dec 14, 2021
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Trca Lands ( 37)5 min walk
Trca Lands ( 35)5 min walk
Balmy Beach Park6 min walk

Schools within 1 km

  • THE COLE ACADEMY Private 8 min walk
  • THE CLAREMONT SCHOOL Private 8 min walk
  • COURCELETTE PUBLIC SCHOOL English Public 9 min walk
  • NEIL MCNEIL CATHOLIC HIGH SCHOOL English Separate 9 min walk
  • BALMY BEACH COMMUNITY SCHOOL English Public 13 min walk
  • ST DENIS CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBirchcliffe-CliffsideMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home66%54%
Population (2021)22,70016,813
Homes built in 1960 or before57%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBirchcliffe-CliffsideCity median
Assault648.5636.3
Robbery73.369.5
Auto theft266.4192.6
Theft over $5,00034.746.1
Break and enter181.4172.8
Theft from vehicles277.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.