HousePrecheckCheck an address

240 Shuter StToronto · zoning, lot size and permit records

Also 238A Shuter St, 238 Shuter St, 240A Shuter St, 242A Shuter St, 242 Shuter St and 2 more

Residential · R (d1.0) (x984)≈ 26.6 × 40.5 m855 m²on Milan Stcorner, also on Shuter St

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.1 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 6 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N10 m
≈ 26.6 m frontage≈ 40.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. B123/01TO (This application includes Nos. 238 to 244 Shuter Street. The consent of the Committee o..., 2001); A643/01TO (This application includes Nos. 238 to 244 Shuter Street. The application involves maint..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 116953 WST 00 IRClosed

    Waste

    Feb 13, 2026 · 244 SHUTER ST
  • Consent (lot split)B123/01TOApproved

    This application includes Nos. 238 to 244 Shuter Street. The consent of the Committee of Adjustment is requested to sever the property into two parcels of land so that each parcel will contain four stacked townhouses, including parking for each townhouse on its respective lot. This application also includes the granting of easements and/or rights-of-way, as described in a plan filed with the application.

    Dec 5, 2001 · 240-244 SHUTER ST
  • Minor varianceA643/01TOApproved

    This application includes Nos. 238 to 244 Shuter Street. The application involves maintaining four stacked townhouses on the eastern portion of this property and four stacked townhouses on the western portion of this property, including the required parking for each townhouse on its own parcel. These townhouses are identified as Lots 1 and Lot 2.

    Dec 5, 2001 · 240-244 SHUTER ST
  • Zoning review01 142922 000Closed
    May 31, 2001 · 240-244 SHUTER ST

Check before you build

  • Site-specific exception 900.2.10(984)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(984)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86.

  2. Rule B

    City of Toronto by-law 1098-2002.

  3. Older by-law A

    The lands must comply with exception 900.2.10(4). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 66 of former City of Toronto By-law 438-86.

  4. Older by-law B

    City of Toronto by-law 1098-2002.

2 parts for other addresses
  • C On 102 Shuter Street and 220 George Street, City of Toronto by-law 68-2014(OMB).
  • C On 102 Shuter Street and 220 George Street, City of Toronto by-law 68-2014(OMB).
By-law 569-2013, Chapter 900

Lot facts

Area
855 m²
Frontage
26.6 mestimated, irregular lot
Depth
40.5 mestimated, irregular lot
Street
Milan St
Corner lot
Yes, also on Shuter St40.5 m along it
Public lane
None
House footprint
213 m²roof up to 12.4 m
Back yard
10.8 mhouse to rear lot line
Side yards
5.8 m and 12 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x984) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
95%37 of 39 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
4
Development applications
18

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 39 variance decisions: more than at 74% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.

    320 ONTARIO ST · May 28, 2025 · 390 m away
  • Minor varianceApproved

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    238 BERKELEY ST · Jan 24, 2024 · 172 m away
  • Minor varianceApproved

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    238 BERKELEY ST · Jan 24, 2024 · 172 m away
  • Minor varianceApproved

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    238 BERKELEY ST · Jan 24, 2024 · 172 m away
  • Minor varianceApproved

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    238 BERKELEY ST · Jan 24, 2024 · 172 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two lots (Building B and Building C) and to create new reciprocal stratified easements/rights-of-way.

    90 ONTARIO ST · Nov 4, 2027 · 263 m away
  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for the 10-storey (39.95 m, including the mechanical penthouse) approved mixed-use building with a two-level underground parking garage, by increasing the building height to 16-storeys (58.4 m, including the mechanical penthouse), resulting in increased residential gross floor area, and modified setbacks. There will be a total of 32 vehicular parking spaces, including three obstructed resident parking spaces. There will be a total of 150 purpose-built rental residential dwelling units on this lot. A related Site Plan Control application (File Number 21 227303 STE 13 SA) is currently under review. This application is necessitated to further increase the building height (14-storeys and 51.65 m), and residential gross floor area approved in Minor Variance Decision A0395/24TEY.

    401 DUNDAS ST E · Nov 25, 2026 · 239 m away
  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 139 m away
  • Zoning review

    Under Review

    339 QUEEN ST E · Nov 6, 2026 · 254 m away
  • Building permit

    Proposal to install mag lock.

    275 QUEEN ST E · Nov 5, 2026 · 211 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 288 m away
  • Building permit

    Proposal to renovate the existing ground floor sprinkler system for Shoppers Drug Mart tenant fit out.

    275 QUEEN ST E · Oct 19, 2026 · 211 m away
  • Building permit

    REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.

    154 SHUTER ST · Oct 15, 2026 · 290 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 158 m away
  • Zoning review

    Closed

    275 QUEEN ST E · Oct 7, 2026 · 211 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station17 min walk
Nearest TTC stop
Queen St East at Ontario St3 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
3,536 vehicles in 8 hOntario St / Shuter St, 40 m away, Jan 25, 2020
Serious collisions within 500 m
142021–2026, killed or seriously injured: 3 fatal, 8 with pedestrians, 2 with cyclists
Parks
Ontario Street Parkette2 min walk
Moss Park4 min walk
40 Power St Park7 min walk

Schools within 1 km

  • LIBERTY PREP SCHOOL Private 4 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 7 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 8 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 9 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.