HousePrecheckCheck an address

240 Jarvis StToronto · zoning, lot size and permit records

Also 133 Mutual St

≈ 39.2 × 74.2 m2,460 m²on Jarvis Stcorner, also on Gould St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 20 225715 (RELOCATION OF THE EXISTING FIRE PUMP TEST HEADER, 2021, status Inspection); 17 259810 (Proposal for interior alterations to existing residential suite on the ground floor to..., 2017, status Inspection); 17 184048 (Small sprinkler alterations as a backflow preventor is being installed. These minor cha..., 2017, status Inspection); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
≈ 39.2 m frontage≈ 74.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2017

    Needs a closer look

    Still open in the City's records: 20 225715 (RELOCATION OF THE EXISTING FIRE PUMP TEST HEADER, 2021, status Inspection); 17 259810 (Proposal for interior alterations to existing residential suite on the ground floor to..., 2017, status Inspection); 17 184048 (Small sprinkler alterations as a backflow preventor is being installed. These minor cha..., 2017, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

26 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 168394 GRA 00 IRNotice Issued

    Graffiti

    May 27, 2026 · 240 JARVIS ST
  • Building permit24 166463Closed

    Erect and display one (1) first party wall signs, displaying static copy and illuminated, erected at the uppermost storey of the ILC Building. Sign Variance Approved (23 143989 ZSV 00 ZV)Dimensions:Wall sign: 11.99 m2 at a height of 31.91m.**Toronto Metropolitan University**

    Jun 20, 2024 · 240 JARVIS ST
  • Building permit23 129895Closed

    Proposal to constuct parking garage repairs.

    May 16, 2023 · 240 JARVIS ST
  • Zoning review23 143989 ZSVClosed
    May 10, 2023 · 240 JARVIS ST
  • Development application22 242103 STE 13 OZClosed

    This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.

    Dec 23, 2022 · 240 JARVIS ST · City file
  • Building permit22 142688Closed

    Interior alterations to existing space and new security gate within existing opening - Ryerson University

    Jul 8, 2022 · 240 JARVIS ST
  • Building permit21 157126Closed

    Proposal for Parking Garage Ramp Repairs for Student Residence.

    Jun 18, 2021 · 240 JARVIS ST
  • Building permit20 225715Inspection

    RELOCATION OF THE EXISTING FIRE PUMP TEST HEADER

    Jan 6, 2021 · 240 JARVIS ST
Show 18 older records
  • Building permit19 141559Closed

    Proposal to replace three rooftop units.

    May 15, 2019 · 240 JARVIS ST
  • Building permit18 253795Closed

    Proposal to reinstate fire rated enclosure to existing laundry chute at second floor and create fire-rated conduit penetrations at existing ground and second floor concrete slabs.

    Nov 29, 2018 · 240 JARVIS ST
  • Building permit17 259810Inspection

    Proposal for interior alterations to existing residential suite on the ground floor to make barrier free accessible.

    Nov 22, 2017 · 240 JARVIS ST
  • Building permit17 184048Inspection

    Small sprinkler alterations as a backflow preventor is being installed. These minor changes are to insure that the sprinkler system functions properly after the backflow is installed.

    Jul 25, 2017 · 240 JARVIS ST
  • Building permit17 113437Permit Issued

    Proposal to install a premises isolation backflow preventor on the existing 6" fire line at Ryerson International Living Learning Centre.

    May 19, 2017 · 240 JARVIS ST
  • Building permit17 128719Closed

    Proposed interior alterations to the washrooms in the student residence on the second floor

    Mar 28, 2017 · 240 JARVIS ST
  • Zoning review15 205557 ZZCClosed
    Aug 12, 2015 · 240 JARVIS ST
  • Building permit15 176079Closed

    Interior alterations due to renovation of 2nd floor staff appartment (Rm 218) and renovations of students rooms; 306, 329, 401 and 426.

    Jul 15, 2015 · 240 JARVIS ST
  • Building permit13 194279Cancelled

    Proposal to alter exit of existing cafeteria space (Maggy's Eatery - Ryerson University)

    Jun 25, 2013 · 240 JARVIS ST
  • Building permit12 151332Closed

    Revision to permit for signage within restaurant per inspector.

    Feb 4, 2013 · 240 JARVIS ST
  • Building permit12 262875Closed

    Proposal to install one electromagnetic lock in IILC Ryerson Cafeteria.

    Oct 24, 2012 · 240 JARVIS ST
  • Building permit11 258721Closed

    Proposal to install 2 backflow prevention devices in an existing commercial building - International Learning Centre.

    Aug 23, 2011 · 240 JARVIS ST
  • Building permit10 205254Closed

    Minor interior alterations to 2 suites in existing student residence/hotel building.

    Jul 5, 2010 · 240 JARVIS ST
  • Zoning review06 190585 ZSVClosed
    Nov 10, 2006 · 240 JARVIS ST
  • Zoning review06 181582 ZPRClosed
    Oct 4, 2006 · 240 JARVIS ST
  • Building permit02 107655Closed

    alter plans to fire alarm upgrade.

    Apr 24, 2003 · 240 JARVIS ST
  • Zoning review97 026465 LTOClosed
    Jun 13, 1997 · 240 JARVIS ST
  • Zoning review88 030143 LTOClosed
    Feb 18, 1988 · 240 JARVIS ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,460 m²
Frontage
39.2 mestimated, irregular lot
Depth
74.2 mestimated, irregular lot
Street
Jarvis St
Corner lot
Yes, also on Gould St74.2 m along it
Public lane
None
House footprint
1,464 m²
Back yard
11.7 mhouse to rear lot line
Side yards
0 m and 0.9 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ginkgo (22 cm), maple (20 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%20 of 21 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
6
Development applications
28

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    185 GERRARD ST E · Oct 14, 2026 · 322 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 219 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 432 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    97 GRANBY ST · Oct 15, 2025 · 357 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 374 m away

Latest activity nearby

  • Zoning review

    Not Started

    319 GEORGE ST · Nov 26, 2026 · 173 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 62 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 262 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 286 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 286 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 287 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 287 m away
  • Building permit

    Proposal to construct pedestrian ramp.

    117 PEMBROKE ST · Oct 27, 2026 · 291 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 238 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Oct 2, 2026 · 267 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station8 min walk
Nearest TTC stop
Dundas St East at Jarvis St3 min walk
Nearest cycling route
Gerrard St ECycle Track, 3 min walk
Nearest traffic count
14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 40 m away, Jun 17, 2010
Serious collisions within 500 m
212021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 4 with cyclists
Parks
Allan Gardens4 min walk
Arena Gardens5 min walk
Toronto Metropolitan University Square5 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 6 min walk
  • TMU - HEASLIP HOUSE University 6 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.