HousePrecheckCheck an address

24 Eugene StToronto · zoning, lot size and permit records

Employment · EL 1.0 (x2)12.1 × 47.6 m552 m²on Eugene St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N10 m
12.1 m frontage47.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Site-specific exception 900.21.10(2)

      Needs a closer look

      2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.21.10(2)Applies

    These parts of the exception apply to this lot's address.

    1. Rule A

      In addition to the uses permitted in Article 60. 10. 20, a vehicle repair shop and vehicle fuel station are also permitted

    2. Rule B

      The minimum building setback is 0.91 metres from the north lot line and 1.34 metres from the south lot line if no less than 5 parking spaces are provided. Prevailing By-laws and Prevailing Sections: (None Apply)

    3. Older by-law A

      In addition to the uses permitted in Article 60. 10. 20, a vehicle repair shop and vehicle fuel station are also permitted

    4. Older by-law B

      The minimum building setback is 0.91 metres from the north lot line and 1.34 metres from the south lot line if no less than 5 parking spaces are provided. Prevailing By-laws and Prevailing Sections: (None Apply)

    By-law 569-2013, Chapter 900

    Lot facts

    Area
    552 m²
    Frontage
    12.1 m
    Depth
    47.6 m
    Street
    Eugene St
    Corner lot
    No
    Public lane
    None
    House footprint
    93 m²roof up to 5.3 m
    Back yard
    26.8 mhouse to rear lot line
    Side yards
    0.8 m and 2.4 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Site and Area Specific Policy 057. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
    • Zone EL 1.0 (x2) (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

    Around this lot

    Minor variances approved
    100%5 of 5 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    3
    Development applications
    0

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To demolish the front portion of the existing warehouse/industrial building in conjunction with alterations to the remaining portion of the building.

      42 EUGENE ST · Jun 18, 2026 · 110 m away
    • Minor varianceApproved

      To construct a second storey addition over the existing dwelling, in conjunction with a new rear deck. The applicant is also proposing other interior and exterior alterations including a proposed secondary suite.

      26 EUGENE ST · Apr 28, 2021 · 14 m away
    • Minor varianceApproved

      To construct a new two-storey detached garage within the rear yard of the subject property, in conjunction with reconstruction of the front porch. The existing detached garage would be demolished.

      38 EUGENE ST · Jun 11, 2015 · 85 m away

    Latest activity nearby

    • Building permitdemolition

      Demolition of existing detached residential dwelling and associated accessory structures. No replacement building. Future redevelopment of the property will be subject to separate Committee of Adjustment and Building Permit applications

      35 MARCIA AVE · Nov 20, 2026 · 259 m away
    • Building permit

      Proposal to demo existing garage to replace it with a new garage.

      972 CALEDONIA RD · Nov 17, 2026 · 225 m away
    • Minor variancePending

      Accepted

      37 MARCIA AVE · Nov 12, 2026 · 250 m away
    • Zoning review

      Not Started

      1 HAFIS RD · Nov 9, 2026 · 274 m away
    • Minor variancePending

      To construct a three-storey apartment building containing six dwelling units.

      35 MARCIA AVE · Oct 30, 2026 · 259 m away
    • Zoning review

      Application On Hold

      84 COLVILLE RD · Oct 7, 2026 · 196 m away
    • Building permitdemolition

      Demolition of existing detached residential dwelling and associated accessory structures. No replacement building permit has been issued at this time. Future redevelopment of the property will be subject to separate Committee of Adjustment and Building Permit applications

      37 MARCIA AVE · Sep 29, 2026 · 250 m away
    • Zoning review

      Notice Sent

      37 MARCIA AVE · Sep 28, 2026 · 250 m away
    • Zoning review

      Notice Sent

      35 MARCIA AVE · Sep 25, 2026 · 259 m away
    • Zoning review

      Cancelled

      35 MARCIA AVE · Sep 25, 2026 · 259 m away

    Neighbourhood: Yorkdale-Glen Park

    About the area around the lot, not the lot itself.

    Nearest station
    Caledonia Station29 min walk
    Nearest TTC stop
    Benton Rd at Colville Rd3 min walk
    Nearest traffic count
    4,332 vehicles in 8 hColville Rd / Sheffield St, 220 m away, Oct 9, 2002
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Joyce Park1 min walk
    Delo Park6 min walk
    Glen Park Parkette7 min walk

    Schools within 1 km

    • JOYCE PUBLIC SCHOOL English Public 7 min walk
    • REGINA MUNDI CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
    • DANTE ALIGHIERI ACADEMY - CLOSED TIL 2026 English Separate 14 min walk
    • GEORGE ANDERSON PUBLIC SCHOOL English Public 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYorkdale-Glen ParkMedian neighbourhood
    Median household income (2020)$79,000$84,500
    Households that own their home54%54%
    Population (2021)16,62516,813
    Homes built in 1960 or before27%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYorkdale-Glen ParkCity median
    Assault1212.6636.3
    Robbery146.869.5
    Homicide4.75.3
    Shootings28.410.5
    Auto theft492.6192.6
    Theft over $5,000274.746.1
    Break and enter341.1172.8
    Theft from vehicles360188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.