HousePrecheckCheck an address

2398 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2432)30.5 × 45.7 m1,334 m²on Yonge Stcorner, also on Montgomery Ave

Not a home

The Anne Johnston Health Station

The City of Toronto's real estate inventory lists The Anne Johnston Health Station here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelRecent records on this lot: 26 248014 (Proposal for interior alterations to lower level of Vibrant Community Health Space for..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 56 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N20 m
30.5 m frontage45.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 14 252180 (OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDI..., 2014, status Inspection); 13 118751 (New fire rated door and frame in fire rated wall, 2013, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 248014 (Proposal for interior alterations to lower level of Vibrant Community Health Space for..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 248014Permit Issued

    Proposal for interior alterations to lower level of Vibrant Community Health Space for a clinic.

    Oct 29, 2026 · 2398 YONGE ST
  • Building permit25 230833Closed

    3 wall signs**THE HEALTH STATION**

    Oct 7, 2025 · 2398 YONGE ST
  • Building permit22 126817Closed

    Revision 01 - Revision to Permit 22 -126817 BLD 00 BA to include:- Removed scope of work from interior vestibule door 125b.- Removed door into the break room.- Revised glazing for reception in the basement.- Revised location for barrier-free push button and push to lock button.- Removed all work associated with Door 125B.---------------------------------------------------------------------Proposed interior alterations and exterior ramp alterations to complete accessibility upgrades in accordance with provincial and city requirements to an existing health centre.

    Jan 31, 2025 · 2398 YONGE ST
  • Building permit14 252180Inspection

    OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDING - YONGE-EGLINTON HEALTH CARE CENTRE

    Nov 27, 2014 · 2398 YONGE ST
  • Building permit13 118751Revision Issued

    New fire rated door and frame in fire rated wall.

    Dec 4, 2013 · 2398 YONGE ST
  • Building permit11 278223Closed

    Anne Johston Health Station 30x40 - Not Certified Tent - Sept 22, 2011 only for 4hr.

    Sep 21, 2011 · 2398 YONGE ST
  • Building permit99 102682Closed - Dormant

    Construct handicapped ramp at south elevation. Raise lobby area for handicap accessibility.

    Dec 21, 1999 · 2398 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2432)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2432)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  5. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  6. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  7. Older by-law C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  8. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,334 m²
Frontage
30.5 m
Depth
45.7 m
Street
Yonge St
Corner lot
Yes, also on Montgomery Ave45.7 m along it
Public lane
None
House footprint
493 m²
Back yard
22.6 mhouse to rear lot line
Side yards
0 m and 3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
7house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2432) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%18 of 18 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
35

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing building by adding a rear second storey addition.

    2561 YONGE ST · Oct 23, 2025 · 453 m away
  • Minor varianceApproved

    To construct 1 storey slab on grade rear addition to an existing ground floor retail unit

    2551 YONGE ST · Jul 4, 2024 · 403 m away
  • Minor varianceApproved

    To permit one additional residential floor (resulting in an overall height of 15-storeys) and associated variances to height, density, parking and amenity space, to the approved mixed-use building that is currently under construction. Related planning applications: 18 186858 NNY 16 OZ & 20 218454 NNY 08 SA. Please note, this application was previously deferred Thursday, April 26, 2024.

    2490-2504 YONGE ST · Jun 20, 2024 · 248 m away
  • Minor varianceApproved

    To remove the on-site office replacement per site-specific By-law 1236-2022(OLT) and associated parking and loading requirements. Related Planning applications; 22 190798 STE 12 OZ.

    50-60 EGLINTON AVE W · Oct 26, 2023 · 365 m away
  • Minor varianceApproved

    To conduct interior alterations to the existing structure.

    2576 YONGE ST · Apr 14, 2022 · 489 m away

Latest activity nearby

  • Building permit

    Install a Electro Magnetic Locking Device on PH Level (17th floor)

    55 ERSKINE AVE · Nov 24, 2026 · 277 m away
  • Zoning review

    Closed

    2350 YONGE ST · Nov 23, 2026 · 145 m away
  • Building permit

    REV 01: Install 1 maglocks thought out buiidling as per below.1 pc - Level P1Proposal to install 8 maglocks in total. Level 6 (3pc), Level 8 (1pc), Level 11 (2pc), Level 15 (2pc).

    2500 YONGE ST · Nov 10, 2026 · 278 m away
  • Building permit

    Proposed interior alterations to an existing restaurant, including modifications to the ground floor washroom and kitchen layout.

    2472 YONGE ST · Nov 9, 2026 · 186 m away
  • Building permit

    Proposal to install a maglock in an existing retail store - LCBO #C019

    2300 YONGE ST · Nov 5, 2026 · 287 m away
  • Building permit

    Proposal for the addition of three (3) magnetic locks

    2400 YONGE ST · Nov 5, 2026 · 31 m away
  • Building permit

    Overhanging Structure Sign*****Royal Bank *****

    2300 YONGE ST · Nov 4, 2026 · 287 m away
  • Zoning review

    Not Started

    34 MONTGOMERY AVE · Oct 29, 2026 · 45 m away
  • Consent (lot split)Approved

    To obtain consent to sever the existing property into two residential lots. File numbers B0015/26NY, A0262/26NY. and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 204 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 204 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station7 min walk
Nearest TTC stop
Yonge St at Montgomery Ave1 min walk
Nearest cycling route
Montgomery AveSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
19,240 vehicles in 14 hYonge St / Broadway Ave / Montgomery Ave, 40 m away, Oct 6, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Montgomery Square Park1 min walk
20 Castlefield Ave Park4 min walk
60 Broadway Ave Park5 min walk

Schools within 1 km

  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 2 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 4 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 4 min walk
  • CAESAR INTERNATIONAL ACADEMY Private 5 min walk
  • ST CLEMENTS SCHOOL Private 5 min walk
  • EGLINTON LINC AND ESL CENTRE English Separate 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.