HousePrecheckCheck an address

239 Burrows Hall BlvdToronto · zoning, lot size and permit records

Open space · OR≈ 138.3 × 203.9 m21,590 m²on Burrows Hall Blvdcorner, also on Purvis Cres

Not a home

Burrows Hall Park

The City of Toronto's real estate inventory lists Burrows Hall Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
N50 m
≈ 138.3 m frontage≈ 203.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (15% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (11% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (40% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
21,590 m²
Frontage
138.3 mestimated, irregular lot
Depth
203.9 mestimated, irregular lot
Street
Burrows Hall Blvd
Corner lot
Yes, also on Purvis Cres203.9 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: oak, swamp white (8 cm), oak, white (8 cm), oak, pin (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitsecondary suite

    Proposal for a secondary suite

    113 PURVIS CRES · Sep 29, 2026 · 290 m away
  • Zoning review

    Closed

    465 MILNER AVE · Sep 16, 2026 · 221 m away
  • Building permit

    Proposal for interior alterations to existing warehouse to add a walk-in freezer, and roof top mechanical equipment w structural reinforcement

    465 MILNER AVE · Jun 24, 2026 · 221 m away
  • Building permit

    Proposed interior alterations.

    9 LAPSLEY RD · Jun 4, 2026 · 276 m away
  • Zoning review

    Closed

    15 LAPSLEY RD · May 19, 2026 · 278 m away
  • Zoning review

    Closed

    9 LAPSLEY RD · Dec 31, 2025 · 276 m away
  • Building permit

    Proposed construction of 7.3m x 7.3m on grade wooden patio in front of restaurant

    9 LAPSLEY RD · Apr 17, 2025 · 276 m away
  • Building permit

    5 illuminated wall signs displaying static copy. 2 of the signs are located on the West Elevation, 2 on the North elevation and 1 on the East elevation. **TD BANK**

    9 LAPSLEY RD · Apr 15, 2025 · 276 m away
  • Development application

    Draft Plan of Condominium to convert 4 existing multiple unit employment buildings - currently rented to industrial/ commercial tenants - into condominium ownership. The exisiting development contains four (4), one (1) storey, multi-unit commercial/ industrial buildings constructed circa 1979. Each building will have 12 condominium units for a total of 48 units. The site contains surface parking with 326 spaces, including 10 accessible parking spaces.

    465 MILNER AVE · Sep 10, 2024 · 229 m away · City file
  • Building permit

    INTERIOR RENOVATION / ALTERATION OF AN EX. STORE TO A PIZZA PIZZA RESTAURANT

    23 LAPSLEY RD · Jun 25, 2024 · 288 m away

Neighbourhood: Malvern East

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station46 min walk
Nearest TTC stop
Milner Ave at Novopharm Crt4 min walk
Nearest traffic count
6,360 vehicles in 8 hMilner Ave: Dailing Gt - Burrows Hall Blvd, 120 m away, May 20, 2009
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Burrows Hall Park1 min walk
Trca Lands ( 90)6 min walk
Cynthia Lai Park7 min walk

Schools within 1 km

  • BURROWS HALL JR PUBLIC SCHOOL English Public 2 min walk
  • VEDIC ROOTS Private 7 min walk
  • ST BARNABAS CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • MALVERN JR PUBLIC SCHOOL English Public 12 min walk
  • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern EastMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home70%54%
Population (2021)26,09516,813
Homes built in 1960 or before4%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern EastCity median
Assault505.9636.3
Robbery80.869.5
Auto theft224.8192.6
Theft over $5,00035.146.1
Break and enter80.8172.8
Theft from vehicles186.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.