HousePrecheckCheck an address

2384 Yonge StToronto · zoning, lot size and permit records

≈ 16.4 × 39.4 m264 m²on Helendale Avecorner, also on Yonge St

Not a home

Montgomery Square Park

The City of Toronto's real estate inventory lists Montgomery Square Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 14 230551 (Instalation of 2 concrete block elevator cores and new foundtions to stabalize two stor..., 2014, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 56 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
≈ 16.4 m frontage≈ 39.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 230551 (Instalation of 2 concrete block elevator cores and new foundtions to stabalize two stor..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. B0059/17NY (To obtain consent to sever the property into two lots and to create various easements/r..., 2018); A0855/17NY (To construct a new 27-storey apartment building. Related Committee of Adjustment files..., 2018).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit14 241284Closed

    Revision to base permit (14 241284) to allow for a rooftop addition to the heritage building, extended second floor space and mechanical mezzanine space. HVAC - Adaptive reuse of exisiting heritage building for commerical use new 27 storey apartment building behind with 4 levels parking.

    Oct 17, 2018 · 2384 YONGE ST
  • Zoning review18 214156 ZPRClosed
    Aug 23, 2018 · 2384 YONGE ST
  • Building permit18 129749Closed

    Interior fit out of tenant unit, commercial kitchen fit out (market+restaurant)

    Aug 9, 2018 · 2384 YONGE ST
  • Consent (lot split)B0059/17NYApproved

    To obtain consent to sever the property into two lots and to create various easements/rights-of-way.

    Feb 28, 2018 · 2384 YONGE ST
  • Minor varianceA0855/17NYApproved

    To construct a new 27-storey apartment building. Related Committee of Adjustment files B0059/17NY and A0855/17NY will be heard jointly.

    Feb 28, 2018 · 2384 YONGE ST
  • Building permit14 241335Closed

    Part Permit - Adaptive reuse of exisiting heritage building for commerical use new 27 storey apartment building behind with 4 levels parking.

    Jun 9, 2017 · 2384 YONGE ST
  • Building permit14 230505Closeddemolition

    Demolition of rear portion of building to allow for redevelopment of site 650m2

    Jan 7, 2015 · 2384 YONGE ST
  • Building permit14 230551Inspection

    Instalation of 2 concrete block elevator cores and new foundtions to stabalize two storey east structure, underpinning and interior demo prior to demolition of entire one storey west portion.

    Dec 1, 2014 · 2384 YONGE ST
Show 4 older records
  • Zoning review14 168231 PSPClosed
    Aug 21, 2014 · 2384 YONGE ST
  • Development application14 164280 NNY 16 SAClosed

    27-storey mixed building consisting of 233 residential units and 1441 square metres of commercial area on the first two floors.

    May 29, 2014 · 2384 YONGE ST
  • Development application13 127993 NNY 16 OZClosed

    The application proposes an official plan amendment and zoning by-law amendment to permit a 26-storey mixed use residential and commercial building with 234 dwelling units and 1,715 square metres of commercial/retail gross floor area. The proposal includes the retention of a portion of the post office building on the site.

    Mar 4, 2013 · 2384 YONGE ST
  • Building permit97 014765Closed

    MAKE INTERIOR ALTERATIONS ON 2ND FLOOR FOR COMMERCIAL SCHOOL. BP

    Apr 14, 1997 · 2384 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
264 m²
Frontage
16.4 mestimated, irregular lot
Depth
39.4 mestimated, irregular lot
Street
Helendale Ave
Corner lot
Yes, also on Yonge St39.4 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%17 of 17 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    35

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

      74 ROSELAWN AVE · Oct 29, 2026 · 252 m away
    • Minor varianceApproved

      To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

      74 ROSELAWN AVE · Oct 29, 2026 · 252 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, in conjunction with changes to the front yard landscaping and driveway.

      150 ROSELAWN AVE · Jul 9, 2026 · 394 m away
    • Minor varianceRefused

      To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, in conjunction with changes to the front yard landscaping and driveway. Please note, this application was previously deferred on February 19, 2026 , to allow the applicant to consult with Transportation Review.

      150 ROSELAWN AVE · May 7, 2026 · 394 m away
    • Minor varianceApproved

      To alter the existing driveway, resulting in a reduction in soft landscaping.

      102 CASTLEFIELD AVE · Apr 30, 2026 · 475 m away

    Latest activity nearby

    • Building permit

      Install a Electro Magnetic Locking Device on PH Level (17th floor)

      55 ERSKINE AVE · Nov 24, 2026 · 292 m away
    • Zoning review

      Closed

      2350 YONGE ST · Nov 23, 2026 · 93 m away
    • Building permit

      Proposed interior alterations to an existing restaurant, including modifications to the ground floor washroom and kitchen layout.

      2472 YONGE ST · Nov 9, 2026 · 237 m away
    • Building permit

      Proposal to install a maglock in an existing retail store - LCBO #C019

      2300 YONGE ST · Nov 5, 2026 · 238 m away
    • Building permit

      Proposal for the addition of three (3) magnetic locks

      2400 YONGE ST · Nov 5, 2026 · 85 m away
    • Building permit

      Overhanging Structure Sign*****Royal Bank *****

      2300 YONGE ST · Nov 4, 2026 · 238 m away
    • Zoning review

      Closed

      20 EGLINTON AVE E · Nov 3, 2026 · 253 m away
    • Consent (lot split)Approved

      To obtain consent to sever the existing property into two residential lots. File numbers B0015/26NY, A0262/26NY. and A0263/26NY will be jointly considered.

      74 ROSELAWN AVE · Oct 29, 2026 · 252 m away
    • Minor varianceApproved

      To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

      74 ROSELAWN AVE · Oct 29, 2026 · 252 m away
    • Minor varianceApproved

      To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

      74 ROSELAWN AVE · Oct 29, 2026 · 252 m away

    Neighbourhood: Yonge-Eglinton

    About the area around the lot, not the lot itself.

    Nearest station
    Eglinton Station7 min walk
    Nearest TTC stop
    Yonge St at Broadway Ave1 min walk
    Nearest cycling route
    Montgomery AveSigned Route (No Pavement Markings), 1 min walk
    Nearest traffic count
    14,520 vehicles in 14 hYonge St / Helendale Ave, 30 m away, Oct 6, 2026
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
    Parks
    Montgomery Square Park1 min walk
    60 Broadway Ave Park5 min walk
    20 Castlefield Ave Park5 min walk

    Schools within 1 km

    • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 2 min walk
    • NORTH TORONTO COLLEGIATE INSTITUTE English Public 3 min walk
    • CAESAR INTERNATIONAL ACADEMY Private 4 min walk
    • JOHN FISHER JR PUBLIC SCHOOL English Public 5 min walk
    • EGLINTON LINC AND ESL CENTRE English Separate 5 min walk
    • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 6 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-EglintonMedian neighbourhood
    Median household income (2020)$94,000$84,500
    Households that own their home37%54%
    Population (2021)12,41016,813
    Homes built in 1960 or before47%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-EglintonCity median
    Assault713.8636.3
    Robbery95.269.5
    Auto theft115.6192.6
    Theft over $5,00010246.1
    Break and enter136172.8
    Theft from vehicles54.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.