HousePrecheckCheck an address

2352 St Clair Ave WToronto · zoning, lot size and permit records

Also 10 Oscar Romero Pl, 11 Oscar Romero Pl, 12 Oscar Romero Pl, 13 Oscar Romero Pl, 14 Oscar Romero Pl and 49 more

Residential · R (d0.6)41.8 × 178.6 m7,270 m²on St Clair Ave Wcorner, also on Blakley Avebacks onto Ln N St Clair E Britannia

Not a single house

Several homes on one parcel

55 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 55 homes on one parcel of 0.7 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelStill open in the City's records: 10 174096 (Installation of (1) backflow prevention device into existing building, 2010, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N50 m
41.8 m frontage178.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2010

    Needs a closer look

    Still open in the City's records: 10 174096 (Installation of (1) backflow prevention device into existing building, 2010, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit15 132867Closed

    Revision#1: changes to drawing.Interior alterations to ground floor of existing residential building. Change kitchen intowater meter room at the ground floor.

    Oct 2, 2015 · 1 OSCAR ROMERO PL
  • Building permit10 174096Inspection

    Installation of (1) backflow prevention device into existing building.

    Jun 8, 2010 · 2352 ST CLAIR AVE W
  • Building permit09 132169Closed

    Repair fire damage to single family townhouse/rowhouse

    May 15, 2009 · 7 OSCAR ROMERO PL
  • Building permit09 132152Closed

    Repair fire damaage to a single family townhouse/rowhouse

    May 15, 2009 · 9 OSCAR ROMERO PL
  • Zoning review90 028260 LTOClosed
    Mar 19, 1990 · 1 OSCAR ROMERO PL

Lot facts

Area
7,270 m²
Frontage
41.8 m
Depth
178.6 m
Street
St Clair Ave W
Corner lot
Yes, also on Blakley Ave178.6 m along it
Public lane
Ln N St Clair E Britannia, 66.7 m along it
House footprint
1,379 m²roof up to 12.1 m
Back yard
18.4 mhouse to rear lot line
Side yards
3.3 m and 28 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone R (d0.6) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 13 City trees in front of this lot. The City's street tree inventory lists 13 trees at this address: honey locust (45 cm), honey locust (44 cm), honey locust (33 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%15 of 16 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
9

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second storey addition above the existing detached garage. The altered garage will be converted into a garden suite.

    20 BLAKLEY AVE · May 28, 2026 · 168 m away
  • Minor varianceApproved

    To construct a new multiplex containing 4 dwelling units and to convert the existing garage into a laneway suite.

    317 RYDING AVE · Feb 12, 2026 · 289 m away
  • Minor varianceApproved

    To convert the existing two-and-one-half-storey, two-unit, semi-detached dwelling into a triplex dwelling by constructing a new third dwelling unit in the basement, a third storey dormer addition and a rear deck on the roof of the second storey below. Also, to convert the existing one-storey detached garage into a new garden suite in the rear yard of the triplex. There will be a total of four dwelling units on the lot.

    156 MARIA ST · Dec 13, 2023 · 487 m away
  • Minor varianceApproved

    To construct a semi-detached garage in the rear yard.

    268 RYDING AVE · Apr 27, 2023 · 198 m away
  • Minor varianceApproved

    To construct a semi-detached garage in the rear yard.

    266 RYDING AVE · Apr 27, 2023 · 205 m away

Latest activity nearby

  • Building permit

    Install inside Backwater valve, no sump pump.

    11 BRITANNIA AVE · Nov 12, 2026 · 75 m away
  • Building permit

    Backwater valve installation on sanitary drain pipe

    29 HAGAR AVE · Nov 4, 2026 · 154 m away
  • Zoning review

    Closed

    2365 ST CLAIR AVE W · Sep 24, 2026 · 132 m away
  • Building permitgarden suite

    Proposed rear garden suite on existing garage.

    20 BLAKLEY AVE · Sep 17, 2026 · 168 m away
  • Zoning review

    Closed

    821 RUNNYMEDE RD · Sep 3, 2026 · 243 m away
  • Building permit

    Revision 04- Remove proposed R12 insulation note on bsmt plan (A2) and section (A4)Revision 03- Adding front porch.Proposal for interior alterations to an existing SFD-detached dwelling.

    39 BLAKLEY AVE · Aug 26, 2026 · 254 m away
  • Building permit

    proposed detached garage

    75 HAGAR AVE · Jul 31, 2026 · 243 m away
  • Zoning review

    Closed

    100 SYMES RD · Jul 23, 2026 · 272 m away
  • Zoning review

    Closed

    2375 ST CLAIR AVE W · Jul 22, 2026 · 143 m away
  • Zoning review

    Closed

    2335 ST CLAIR AVE W · Jul 14, 2026 · 123 m away

Neighbourhood: Junction Area

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station34 min walk
Nearest TTC stop
St Clair Ave West at Britannia Ave2 min walk
Nearest cycling route
Ryding AveBike Lane - Contraflow, 4 min walk
Nearest traffic count
11,313 vehicles in 8 hSt Clair Ave W / Oscar Romero Pl, 100 m away, Sep 7, 1993
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Henrietta Park1 min walk
Symes - Viella Parkette3 min walk
Runnymede Park4 min walk

Schools within 1 km

  • IQRA NEJASHI ISLAMIC SCHOOL Private 8 min walk
  • HARWOOD PUBLIC SCHOOL English Public 10 min walk
  • ROCKCLIFFE MDL SCHOOL English Public 13 min walk
  • GEORGE SYME COMMUNITY SCHOOL English Public 14 min walk
  • KING GEORGE JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction AreaMedian neighbourhood
Median household income (2020)$96,000$84,500
Households that own their home58%54%
Population (2021)14,01016,813
Homes built in 1960 or before55%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction AreaCity median
Assault908.1636.3
Robbery74.669.5
Shootings6.210.5
Auto theft236.4192.6
Theft over $5,00087.146.1
Break and enter304.8172.8
Theft from vehicles578.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.