Work or applications in progress
Good to knowRecent records on this lot: 26 274547 (Demolition and decommissioning of an existing pedestrian tunnel access structure, inclu..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications4 development applications open within 300 m
Good to know4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Building permit26 274547Application On Hold
Demolition and decommissioning of an existing pedestrian tunnel access structure, including removal of the existing stair and elevator access components and construction of a new reinforced concrete roof slab and associated site restoration
Nov 24, 2026 · 235 THE ESPLANADE - By-law investigation26 109766 SNI 00 IRClosed
Snow and Ice
Jan 27, 2026 · 235 THE ESPLANADE
Check before you build
Site-specific exception 900.40.10(190)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of Toronto by-laws 515-76; 576-76; 677-76; 24-77; 614-77; 391-78; 478-78; 664-78; 812-78; 889-78; 198-79; 373-79; 615-79; 884-79; 61-80; 879-80; 116-82; 145-83; 92-85; and 514-86.
Lot facts
- Area
- 5,337 m²
- Frontage
- 26.3 m
- Depth
- 202.7 m
- Street
- Aitken Pl
- Corner lot
- Yes, also on The Esplanade202.7 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone O (x190) (Open Space). Chapter 90, section 90.10 of the by-law. Source
- 52 City trees in front of this lot. The City's street tree inventory lists 52 trees at this address: ash, green (45 cm), ash, green (44 cm), ash, green (42 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 12
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Demolition and decommissioning of an existing pedestrian tunnel access structure, including removal of the existing stair and elevator access components and construction of a new reinforced concrete roof slab and associated site restoration
235 THE ESPLANADE · Nov 24, 2026 · 47 m away - Zoning review
Cancelled
180 FRONT ST E · Nov 5, 2026 · 268 m away - Zoning review
Closed
178 FRONT ST E · Nov 5, 2026 · 266 m away - Building permit
Demolition of existing finishes, drywall, and some framing, and existing millwork, existing plumbing fixtures (drains to remain,) and equipment (excluding existing mechanical units.) Construct new partitions, with room size changes at 2nd level. Plumbing connection will be a re/re connection. No structural changes to the building. Add of new finishes, equipment, and fixtures.
222 THE ESPLANADE · Oct 30, 2026 · 85 m away - Zoning review
Closed
17 PRINCESS ST · Oct 15, 2026 · 135 m away - Zoning review
Closed
33 HAHN PL · Sep 16, 2026 · 147 m away - Zoning review
Notice Sent
219 FRONT ST E · Aug 25, 2026 · 165 m away - Building permit
Proposal for garage repairs.
65 SCADDING AVE · Jul 16, 2026 · 83 m away - Consent (lot split)Approved
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
31 PARLIAMENT ST · Jul 15, 2026 · 272 m away - Building permit
Proposal to install backwater valve
43 LONGBOAT AVE · Jul 8, 2026 · 154 m away
Neighbourhood: St Lawrence-East Bayfront-The Islands
About the area around the lot, not the lot itself.
- Nearest station
- King Station17 min walk
- Nearest TTC stop
- The Esplanade at Princess St1 min walk
- Nearest cycling route
- The EsplanadeBi-Directional Cycle Track, 1 min walk
- Nearest traffic count
- 1,011 vehicles in 8 hThe Esplanade / Hahn Pl / Berkeley St, 110 m away, Mar 24, 2022
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- David Crombie Park1 min walk
- Parliament Square Park2 min walk
- Princess Street Park2 min walk
Schools within 1 km
- MARKET LANE JR & SR PUBLIC SCHOOL English Public 1 min walk
- VOICE INTEGRATIVE PRIVATE SCHOOL Private 6 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 8 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk
- GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | St Lawrence-East Bayfront-The Islands | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 31,285 | 16,813 |
| Homes built in 1960 or before | 3% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | St Lawrence-East Bayfront-The Islands | City median |
|---|---|---|
| Assault | 1059.7 | 636.3 |
| Robbery | 96.3 | 69.5 |
| Shootings | 4.5 | 10.5 |
| Auto theft | 24.6 | 192.6 |
| Theft over $5,000 | 78.4 | 46.1 |
| Break and enter | 163.5 | 172.8 |
| Theft from vehicles | 163.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.