Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 235 Queen St E
235 Queen St E is on a 13.6 m by 24.6 m lot on Queen St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(333), changes some of the usual rules for this address. The lot also fronts Sherbourne St.
The City has 20 records on this lot since 1994. That is more than at 99% of Toronto houses. In 2014, a building permit was filed: "Revision- connect new 2" sanitary into existing drain stack replace piping within existing restaurant". Status: closed. In 2014, a building permit was filed: "Proposal to increase the occupancy and construct an outdoor patio to an existing ground floor restaurant - black irish whiskey bar existing - 30 seats, group…". Status: closed. In 2008, a building permit was filed: "Proposal to install new kitchen exhaust for new restaurant of 28 seats, "popeye's". in relation to building permit 08-200293". Status: closed. Nothing on file is open right now.
Within 300 m, 15 development applications are open (the tallest up to 43 storeys). Queen station is a 13-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(333)Moderate
- 15 development applications open within 300 mLowFree check
- Priority retail street: Queen Street East, Sherbourne StreetLow
- 1 City tree in front of this lotLowFree check
- King-Parliament Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
20 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-09-03 | By-law investigation26 245560 WST 00 IV | Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to: Metal barrels, clothing items, f | Closed | |
| 2026-09-03 | By-law investigation26 232242 WST 00 IR | Waste | Closed | |
| 2026-08-11 | By-law investigation26 218088 WST 00 IR | Waste | Closed | |
| 2026-05-29 | By-law investigation26 177192 GRA 00 IV | Notice Issued Graffiti | Closed | |
| 2026-05-29 | By-law investigation26 174034 GRA 00 IR | Graffiti | Closed | |
| 2025-10-14 | By-law investigation25 239622 WST 00 IR | Waste | Closed | |
| 2023-09-13 | Zoning review23 201492 LTO | No description on file | Closed | |
| 2019-06-27 | Zoning review19 179308 LTO | No description on file | Closed | |
| 2014-05-28 | Building permit14 116225 | Revision- connect new 2" sanitary into existing drain stack replace piping within existing restaurant | Closed | |
| 2014-05-13 | Building permit14 141564 | Proposal to increase the occupancy and construct an outdoor patio to an existing ground floor restaurant - Black Irish Whiskey Bar Existing - 30 seats, Group E, no patio. Proposed - 80 seats, Group A2, 42 seats private patio | Closed | |
| 2011-09-15 | Building permit11 264100 | Alterations to add new door on North wall, facing Queen street, In existing restaurant, "Popeye's". | Cancelled | |
| 2008-09-26 | Building permit08 200300 | Proposal to install new kitchen exhaust for new restaurant of 28 seats, "Popeye's". In relation to building permit 08-200293. | Closed | |
| 2008-09-25 | Building permit08 200293 | Proposal for interior alterations to convert existing restaurant with more than 30 seats to a restaurant with 28 seats for Popeye's Restaurant (200sm). | Closed | |
| 2007-04-12 | Zoning review07 150323 LTO | No description on file | Closed | |
| 2001-09-18 | Building permit01 171200 | make interior alterations to construct designated smoking room under chapter 709 of the municipal code. see health approval. | Closed | |
| 1997-03-20 | Building permit97 013847 | CHANGE USE ON 2ND FLOOR FROM OFFICE TO BILLIARD EDC | Closed | |
| 1996-11-14 | Zoning review96 025682 LTO | No description on file | Closed | |
| 1995-11-17 | Zoning review95 025845 LTO | No description on file | Closed | |
| 1995-05-11 | Building permit94 021071 | ALTER PLANS AS APPROVED UNDER FILE 362465 BY MAKING FURTHER ALTERATIONS AND CONSTRUCTING A FLOOR CREATING A SECOND FLOOR LEVEL FOR OFFICE PURPOSES. ALSO ALTER ELEVATIONS /LM | Closed | |
| 1994-12-15 | Zoning review94 025724 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(333)
- Priority retail street: Queen Street East, Sherbourne Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(333)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Queen Street East, Sherbourne Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(333)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.5 (c2.0; r4.0) SS2 (x333)
- Height limit
- 25 m
- Corner lot
- Yes, also on Sherbourne St
- Public lane
- None
- House footprint
- 192 m²
- Back yard
- 8.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 15 development applications open within 300 m, up to 43 storeys
- In the Corktown station area
- 2 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
15 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen StationNearest station13 min walk
- Sherbourne St at Queen St EastNearest TTC stop1 min walk
- Sherbourne StNearest cycling route1 min walk
- Ecole Elementaire Gabrielle RoySchool6 min walk
- Liberty Prep SchoolSchool6 min walk
- George Brown College - St James CampusSchool6 min walk
- St Paul Catholic Elementary SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist