HousePrecheckCheck an address

2346 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2433)19.7 × 40.5 m770 m²on Yonge Stcorner, also on Orchard View Blvd

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 24 245867 NNY 08 SA (Site Plan Control Application proposing a 56-storey mixed-use building containing 407 r..., 2024); 24 146664 NNY 08 OZ (Application for a 56-storey mixed-use building containing 407 residential units and 272..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 31 development applications open within 300 m, up to 65 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N10 m
19.7 m frontage40.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2007

    Needs a closer look

    Still open in the City's records: 07 278231 (RBC - second floor interior renovations to existing bank, 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 245867 NNY 08 SA (Site Plan Control Application proposing a 56-storey mixed-use building containing 407 r..., 2024); 24 146664 NNY 08 OZ (Application for a 56-storey mixed-use building containing 407 residential units and 272..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A012/02M (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 31 development applications open within 300 m

    Good to know

    31 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

20 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review24 245867 PSPClosed
    Apr 7, 2025 · 2346 YONGE ST
  • Development application24 245867 NNY 08 SAUnder Review

    Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.

    Dec 2, 2024 · 2346 YONGE ST · City file
  • Zoning review24 146664 POZClosed
    Sep 6, 2024 · 2346 YONGE ST
  • Development application24 146664 NNY 08 OZOMB Appeal

    Application for a 56-storey mixed-use building containing 407 residential units and 272.2 square-meters of commercial space at-grade. The building will feature a 3-storey podium with outdoor amenity space above, and a 53-storey tower. It will contain a combined Gross Floor Area (GFA) of 36,656.0 square-meters, and overall density of 29.5 FSI

    May 10, 2024 · 2346 YONGE ST · City file
  • Building permit23 109642Closed

    REVISION: revise wall signs' locations, dimensions and add a wall sign on the premises. No changes to the projecting sign on the east elevation (refer to original permit).Proposal contains three wall signs, illuminated, displaying static copy, with the following details:Sign #1 - one face measuring 2.57m vertically by 1.98m horizontally, at the height of 10.80m at the 2nd storey on the southeast elevation;Signs #2A - one face measuring 0.48m vertically by 3.73m horizontally at the height of 5.41m at the 1st storey on the south elevation;Signs #2B - one face measuring 0.48m vertically by 3.73m horizontally at the height of 5.41m at the 1st storey on the east elevation.****RBC****

    Nov 28, 2023 · 2346 YONGE ST
  • Building permit22 180832Closed

    Rev 01: scope of work reduced, foundation work removed, height of vestibule revised, reduction of demolition and new work scope

    Jun 26, 2023 · 2346 YONGE ST
  • Zoning review22 225478 ZPRClosed
    Nov 3, 2022 · 2346 YONGE ST
  • Building permit21 251756Closed

    THIS PROJECT CONSISTS OF DESIGNING AND MODIFYING AN OVERHEAD WET SPRINKLER SYSTEM TO ACCOMMODATE NEWARCHITECTURAL FEATURES IN AN EXISTING BUILDING.

    Jan 28, 2022 · 2346 YONGE ST
Show 12 older records
  • Zoning review21 238097 ZPRClosed
    Nov 15, 2021 · 2346 YONGE ST
  • Building permit21 199811Closed

    Proposal for interior alterations for tennant fit out RBC - existing

    Oct 28, 2021 · 2346 YONGE ST
  • Building permit16 125025Closed

    HVAC - INTERIOR ALTERATIONS TO AN EXISTING ROYAL BANK BRANCH: BUILD A NEW VAULT, ALTER OFFICES AND PROVIDE STRUCTURAL, ELECTRICAL AND MECHANICAL COMPONENTS TO SUIT. (55.70m2)

    Apr 8, 2016 · 2346 YONGE ST
  • Building permit07 278231Inspection

    RBC - second floor interior renovations to existing bank

    Nov 27, 2007 · 2346 YONGE ST
  • Building permit07 252990Closed

    RBC - Renovations

    Aug 28, 2007 · 2346 YONGE ST
  • Building permit06 152067Closed - Dormant

    Construct interior alterations to existing ground and second floors of a bank.

    Jul 6, 2006 · 2346 YONGE ST
  • Minor varianceA012/02MApproved

    This is an application under Section 45 of the Planning Act, for variance from the provisions of the Toronto Zoning By-law 438-86, as amended, to permit the existing commercial parking lot to remain as constructed.

    Jan 31, 2002 · 2346 YONGE ST
  • Zoning review01 137912 000Closed
    May 16, 2001 · 2346 YONGE ST
  • Zoning review01 012267 LTOClosed
    Feb 20, 2001 · 2346 YONGE ST
  • Zoning review00 013015 LTOClosed
    Sep 27, 2000 · 2346 YONGE ST
  • Zoning review00 012058 LTOClosed
    Jan 12, 2000 · 2346 YONGE ST
  • Zoning review92 025452 LTOClosed
    Apr 30, 1992 · 2346 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2433)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2433)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  5. Rule E

    On 2346 Yonge St., former City of Toronto by-law 422-90.

  6. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  7. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  8. Older by-law C

    Section 12(2) 269 of former City of Toronto By-law 438-86

  9. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  10. Older by-law E

    On 2346 Yonge St., former City of Toronto by-law 422-90.

By-law 569-2013, Chapter 900

Lot facts

Area
770 m²
Frontage
19.7 m
Depth
40.5 m
Street
Yonge St
Corner lot
Yes, also on Orchard View Blvd40.5 m along it
Public lane
None
House footprint
757 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2433) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: linden, littleleaf (9 cm), honey locust (8 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%14 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
50

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).

    2161 YONGE ST · Aug 19, 2026 · 417 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.

    2161 YONGE ST · Aug 14, 2024 · 417 m away
  • Minor varianceApproved

    To permit one additional residential floor (resulting in an overall height of 15-storeys) and associated variances to height, density, parking and amenity space, to the approved mixed-use building that is currently under construction. Related planning applications: 18 186858 NNY 16 OZ & 20 218454 NNY 08 SA. Please note, this application was previously deferred Thursday, April 26, 2024.

    2490-2504 YONGE ST · Jun 20, 2024 · 406 m away
  • Minor varianceApproved

    To remove the on-site office replacement per site-specific By-law 1236-2022(OLT) and associated parking and loading requirements. Related Planning applications; 22 190798 STE 12 OZ.

    50-60 EGLINTON AVE W · Oct 26, 2023 · 229 m away
  • Minor varianceApproved

    To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.

    2161 YONGE ST · Aug 9, 2023 · 417 m away

Latest activity nearby

  • Zoning review

    Closed

    2350 YONGE ST · Nov 23, 2026 · 18 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    41 HENNING AVE · Nov 18, 2026 · 232 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    39 HENNING AVE · Nov 18, 2026 · 237 m away
  • Building permitdemolition

    TO DEMOLISH EXISTING TWO-STOREY RESIDENTIAL BUILDING FOR FUTURE CITY PARKLAND AS PER APPROVED SETTLEMENT. CITY FILE NO. 23 176474 NNY 08 OZ & 24 135591 NNY 0Z

    37 HENNING AVE · Nov 18, 2026 · 241 m away
  • Building permitdemolition

    DEMOLITION OF EXISTING TWO STOREY BRICK DWELLING. PROPOSED 40-STOREY RESIDENTIAL BUILDING WITH TWO LEVELS OF UNDERGROUND PARKING LEVELS. CITY FILE NO.: 23 176474 NNY 08 OZ & 24 135591 NNY 08 OZ

    35 HENNING AVE · Nov 18, 2026 · 242 m away
  • Building permitdemolition

    DEMOLITION OF EXISTING TWO STOREY BRICK DWELLING.PROPOSED 40-STOREY RESIDENTIAL BUILDING WITH TWO LEVELS OF UNDERGROUND PARKING LEVELS. CITY FILE NO.: 23 176474 NNY 08 OZ & 24 135591 NNY 08 OZ

    33 HENNING AVE · Nov 18, 2026 · 244 m away
  • Building permit

    Proposal to install a maglock in an existing retail store - LCBO #C019

    2300 YONGE ST · Nov 5, 2026 · 129 m away
  • Building permit

    Proposal for the addition of three (3) magnetic locks

    2400 YONGE ST · Nov 5, 2026 · 190 m away
  • Building permit

    Overhanging Structure Sign*****Royal Bank *****

    2300 YONGE ST · Nov 4, 2026 · 129 m away
  • Building permit

    Proposal for interior alterations to an office for a tenant fit up.

    90 EGLINTON AVE E · Nov 4, 2026 · 268 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station5 min walk
Nearest TTC stop
Yonge St at Orchard View Blvd1 min walk
Nearest cycling route
Montgomery AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
15,038 vehicles in 14 hYonge St / Roehampton Ave, 50 m away, Oct 6, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Montgomery Square Park1 min walk
60 Broadway Ave Park5 min walk
233 Duplex Ave Park6 min walk

Schools within 1 km

  • CAESAR INTERNATIONAL ACADEMY Private 3 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 4 min walk
  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 4 min walk
  • EGLINTON LINC AND ESL CENTRE English Separate 4 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.