HousePrecheckCheck an address

2335 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2407)16.7 × 45.6 m726 m²on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 28 development applications open within 300 m, up to 70 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 225460 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • Major Transit Station Area: EglintonThe City plans more homes around the station: good for transit, and more building over time.
N10 m
16.7 m frontage45.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 225460 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 148167 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 28 development applications open within 300 m

    Good to know

    28 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 70 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 225460 PRS 00 IRRescheduled

    Property Standards

    Aug 25, 2026 · 2335 YONGE ST
  • By-law investigation26 148167 PRS 00 IRClosed

    Property Standards

    Apr 22, 2026 · 2335 YONGE ST
  • Building permit20 199692Closed

    To erect and display two wall signs.****PAI****

    Jan 11, 2022 · 2335 YONGE ST
  • Building permit19 191891Closed

    Proposal for interior alterations to restaurant Greater Than 30 Seats - "SameSame"

    Aug 21, 2019 · 2335 YONGE ST
  • Zoning review19 191914 ZPRClosed
    Jul 19, 2019 · 2335 YONGE ST
  • Building permit17 216156Closed

    Replace existing fire alarm control panel and remote annunciator.

    Sep 11, 2017 · 2335 YONGE ST
  • Building permit16 197385Closed

    Proposal to install a 2 inch backflow prevention device.

    Aug 24, 2016 · 2335 YONGE ST
  • Zoning review15 145597 LPRClosed
    Apr 23, 2015 · 2335 YONGE ST
Show 11 older records
  • Zoning review08 159087 LPRClosed
    May 15, 2008 · 2335 YONGE ST
  • Zoning review06 115985 LTOClosed
    Mar 9, 2006 · 2335 YONGE ST
  • Building permit03 113574Closeddemolition

    to demolish the existing exterior storage room and stair below grade at the front of the building. Also construct new below grade store front.

    Mar 28, 2003 · 2335 YONGE ST
  • Zoning review02 170568 LTOClosed
    Sep 6, 2002 · 2335 YONGE ST
  • Building permit01 129925Closed

    Install and supply HVAC system. Cost incl: 01-116779

    Jun 19, 2001 · 2335 YONGE ST
  • Building permit01 116779Closed

    Construct exterior stair addition from 2nd floor to grade in existing restaurant building to increase the occupant load (450 seats on 2nd floor and 239 on 3rd. floor)

    Apr 24, 2001 · 2335 YONGE ST
  • Zoning review98 025680 LTOClosed
    Feb 16, 1998 · 2335 YONGE ST
  • Zoning review93 025134 LTOClosed
    May 21, 1993 · 2335 YONGE ST
  • Zoning review91 026785 LTOClosed
    Aug 8, 1991 · 2335 YONGE ST
  • Zoning review82 026595 LTOClosed
    Oct 29, 1982 · 2335 YONGE ST
  • Zoning review81 030107 LTOClosed
    Mar 27, 1981 · 2335 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2407)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2407)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  4. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86

  5. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
726 m²
Frontage
16.7 m
Depth
45.6 m
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
714 m²roof up to 48.1 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton. The lot is inside the Eglinton Major Transit Station Area approved by the Province (Site and Area Specific Policy 723). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2407) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
50

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).

    2161 YONGE ST · Aug 19, 2026 · 440 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.

    2161 YONGE ST · Aug 14, 2024 · 440 m away
  • Minor varianceApproved

    To permit one additional residential floor (resulting in an overall height of 15-storeys) and associated variances to height, density, parking and amenity space, to the approved mixed-use building that is currently under construction. Related planning applications: 18 186858 NNY 16 OZ & 20 218454 NNY 08 SA. Please note, this application was previously deferred Thursday, April 26, 2024.

    2490-2504 YONGE ST · Jun 20, 2024 · 385 m away
  • Minor varianceApproved

    To remove the on-site office replacement per site-specific By-law 1236-2022(OLT) and associated parking and loading requirements. Related Planning applications; 22 190798 STE 12 OZ.

    50-60 EGLINTON AVE W · Oct 26, 2023 · 294 m away
  • Minor varianceApproved

    To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.

    2161 YONGE ST · Aug 9, 2023 · 440 m away

Latest activity nearby

  • Zoning review

    Closed

    2350 YONGE ST · Nov 23, 2026 · 60 m away
  • Building permit

    Designing and installing a sprinkler modification system

    110 EGLINTON AVE E · Nov 10, 2026 · 260 m away
  • Building permit

    Proposal to install a maglock in an existing retail store - LCBO #C019

    2300 YONGE ST · Nov 5, 2026 · 177 m away
  • Building permit

    Proposal for the addition of three (3) magnetic locks

    2400 YONGE ST · Nov 5, 2026 · 181 m away
  • Building permit

    Overhanging Structure Sign*****Royal Bank *****

    2300 YONGE ST · Nov 4, 2026 · 177 m away
  • Building permit

    Proposal for interior alterations to an office for a tenant fit up.

    90 EGLINTON AVE E · Nov 4, 2026 · 224 m away
  • Zoning review

    Closed

    20 EGLINTON AVE E · Nov 3, 2026 · 161 m away
  • Building permit

    Proposal for interior alterations to lower level of Vibrant Community Health Space for a clinic.

    2398 YONGE ST · Oct 29, 2026 · 148 m away
  • Building permit

    Proposal for shell work at vacant Unit C013 Yonge Eglinton Centre.

    2300 YONGE ST · Oct 27, 2026 · 177 m away
  • Building permit

    Proposal for interior alteration - Office

    20 EGLINTON AVE W · Oct 23, 2026 · 230 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Eglinton Station6 min walk
Nearest TTC stop
Yonge St at Orchard View Blvd1 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
14,520 vehicles in 14 hYonge St / Helendale Ave, 70 m away, Oct 6, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Montgomery Square Park1 min walk
60 Broadway Ave Park4 min walk
20 Castlefield Ave Park6 min walk

Schools within 1 km

  • CAESAR INTERNATIONAL ACADEMY Private 3 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 3 min walk
  • EGLINTON LINC AND ESL CENTRE English Separate 4 min walk
  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 5 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.