HousePrecheckCheck an address

233 Cummer AveToronto · zoning, lot size and permit records

Institutional · IH (x8)155.5 × 225.6 m31,426 m²on Cummer Ave

Not a home

A hospital

The zoning by-law sets this parcel aside for a hospital. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A hospital nearbyAmbulances and sirens, traffic and parking at shift changes; care and jobs close by.
  • Permits or applications open on this parcelStill open in the City's records: 24 110738 (Proposal for interior renovations; roof restoration; replacement of exterior windows an..., 2024, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 3 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
155.5 m frontage225.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (1% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 110738 (Proposal for interior renovations; roof restoration; replacement of exterior windows an..., 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (12% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A181/03NY (This is an application under Section 45 (2) (a) of the Planning Act, to permit the cons..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 110738Inspection

    Proposal for interior renovations; roof restoration; replacement of exterior windows and doors; new canopy; new fire protection system; renovations to interior plumbing; new HVAC system.

    Jun 7, 2024 · 233 CUMMER AVE
  • Zoning review23 184136 ZAPClosed
    Aug 3, 2023 · 233 CUMMER AVE
  • Building permit13 168529Closed

    Installation of 44 new roof mounted, ballasted solar panels in compliance with microfit guidelines.

    May 21, 2013 · 233 CUMMER AVE
  • Building permit09 137938Closed

    Install one backflow preventer - Sisterhood of Saint John the Divine, convent

    May 22, 2009 · 233 CUMMER AVE
  • Building permit04 111355Closed

    Interior alterations to the ground and second floor of the Sisterhood of Saint John the Divine.

    Jun 21, 2004 · 233 CUMMER AVE
  • Building permit04 113841Closed

    16 fixtures

    May 6, 2004 · 233 CUMMER AVE
  • Minor varianceA181/03NYApproved

    This is an application under Section 45 (2) (a) of the Planning Act, to permit the construction of a two-storey addition to the existing Nuns' Residence . The development constitutes an extension and expansion of a legal non-conforming use to the St. John's Rehabilitation Centre and existing Nuns' Residence, which are not a permitted use in an R3 Zoning District.

    Sep 4, 2003 · 233 CUMMER AVE

Check before you build

  • Site-specific exception 900.31.10(8)

    Needs a closer look

    5 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.31.10(8)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum lot coverage must not exceed the lower of: (i) 35%; or (ii) that which existed on the date of the enactment of this By-law

  2. Rule B

    The maximum gross floor area is not exceed that which existed on the date of the enactment of this By-law

  3. Rule C

    The permitted maximum height for each part of each building or structure is not exceed that which existed for each part of each building or structure on the date of the enactment of this By-law

  4. Rule D

    The minimum required front yard , side yard and rear yard setback for each building and structure is not be less than that which existed for each part of each building on the date of the enactment of this By-law

  5. Rule E

    The minimum number of parking spaces required is not be reduced to less than the number of parking spaces that existed on the date of the enactment of this By-law.

By-law 569-2013, Chapter 900

Lot facts

Area
31,426 m²
Frontage
155.5 m
Depth
225.6 m
Street
Cummer Ave
Corner lot
No
Public lane
None
House footprint
3,122 m²roof up to 10.7 m
Back yard
47.4 mhouse to rear lot line
Side yards
29.8 m and 54.6 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone IH (x8) (Institutional Hospital). Chapter 80, section 80.20 of the by-law. Source
  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: poplar, eastern cottonwood (72 cm), serviceberry (10 cm), serviceberry (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for Exterior Renovations - Exterior parking, stairs, curbs and sloped walkway

    205 CUMMER AVE · Nov 2, 2026 · 142 m away
  • Building permit

    Proposal to construct a below grade entrance for existing single family dwelling.

    266 CUMMER AVE · Jul 13, 2026 · 144 m away
  • Building permit

    Proposed below grade entrance for the already finished personal use basement

    266 CUMMER AVE · Jun 30, 2026 · 144 m away
  • Building permit

    Proposal to install Back Water Valve

    301 CUMMER AVE · Mar 27, 2026 · 260 m away
  • Building permit

    Proposal for alterations to exterior parking, stairs, curbs and sloped walkways

    205 CUMMER AVE · Mar 26, 2026 · 142 m away
  • Building permit

    Alternative solution proposed for a dead-end corridor in a building of residential occupancy with a length exceeding the maximum permitted length of 6m as required by the 2012 BC, Sentence 3.3.1.9.(9). The full description and explanation is outlined in the accompanying report as referenced, VT 175 Cummer dead end.

    175 CUMMER AVE · Feb 10, 2026 · 242 m away
  • Zoning review

    Application On Hold

    205 CUMMER AVE · May 30, 2025 · 142 m away
  • Building permit

    Proposal For Long-Term Care Home Exterior Renovations, Exterior Parking, Stairs (Handrail/guard), Curbs and Sloped Walkway.

    205 CUMMER AVE · Apr 15, 2025 · 142 m away
  • Building permit

    Proposed installation of new sprinkler zone in the 5th floor elevator machine room

    205 CUMMER AVE · Mar 26, 2025 · 142 m away
  • Building permit

    Conditional Permit - Part Permit - Proposal for a 3-storey apartment building with 59 bachelor units (supportive/affordable housing) and staff offices, kitchen, dining, lounge, and laundry rooms at 175 Cummer Avenue. This is part of Phase 2 of the City of Toronto's Modular Housing Initiative.

    175 CUMMER AVE · Mar 24, 2025 · 242 m away

Neighbourhood: Newtonbrook East

About the area around the lot, not the lot itself.

Nearest station
Finch Station19 min walk
Nearest TTC stop
285 Cummer Ave - St John's Rehab Hospital2 min walk
Nearest cycling route
Newtonbrook Park TrlMulti-Use Trail - Connector, 3 min walk
Nearest traffic count
4,192 vehicles in 8 hCummer Ave: Becky Cheung Crt - Willow Heights Crt, 100 m away, Dec 14, 2021
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Newtonbrook Park2 min walk
Wedgewood Park - North York3 min walk
Maxome Park7 min walk

Schools within 1 km

  • CUMMER VALLEY MDL SCHOOL English Public 6 min walk
  • AVONDALE SECONDARY ALTERNATIVE SCHOOL English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNewtonbrook EastMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home62%54%
Population (2021)15,34516,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNewtonbrook EastCity median
Assault554636.3
Robbery60.369.5
Auto theft252.3192.6
Theft over $5,00049.446.1
Break and enter170172.8
Theft from vehicles170188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.