HousePrecheckCheck an address

2318 Bathurst StToronto · zoning, lot size and permit records

Also 49 Old Park Rd

Open space · O≈ 38.0 × 504.2 m10,109 m²on Bathurst St

Not a home

Portion Of Kay Gardner Beltline Park

The City of Toronto's real estate inventory lists Portion Of Kay Gardner Beltline Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Forest HillThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 38.0 m frontage≈ 504.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (23% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
10,109 m²
Frontage
38 mestimated, irregular lot
Depth
504.2 mestimated, irregular lot
Street
Bathurst St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Forest Hill. The lot is inside the Forest Hill Major Transit Station Area approved by the Province (Site and Area Specific Policy 677). Source
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
97%32 of 33 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Application Acceptable

    205 OLD FOREST HILL RD · Nov 25, 2026 · 261 m away
  • Building permit

    Proposed interior alterations and addition (66.78 m²) to an existing two-storey single-family dwelling.

    54 RIDGE HILL DR · Nov 20, 2026 · 205 m away
  • Building permit

    Interior alterations to the first and second floors of an existing two-storey single family dwelling, basement underpinning, new steel beam, steel post and pad footing, new basement window with window well, and associated plumbing.

    34 FOREST RIDGE DR · Nov 4, 2026 · 177 m away
  • Building permit

    Proposal for structural restoration of the rear portion of the dwelling following fire damage, returning the affected area to its pre-loss condition

    23 OLD PARK RD · Oct 28, 2026 · 290 m away
  • Building permitdemolition

    Proposal for a single family dwelling & demolition of the existing dwelling

    192 OLD FOREST HILL RD · Jul 9, 2026 · 274 m away
  • Building permitnew building, new house

    Proposal for a single family dwelling & demolition of the existing dwelling

    192 OLD FOREST HILL RD · Jul 9, 2026 · 274 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a rear deck (patio).

    192 OLD FOREST HILL RD · Apr 30, 2026 · 274 m away
  • Building permit

    Proposal to alter the existing deck at rear.

    27 RIDELLE AVE · Apr 23, 2026 · 246 m away
  • Building permit

    Proposed underpinning beneath three foundation walls of the existing garage.

    14 LAWNHURST BLVD · Mar 20, 2026 · 192 m away
  • Zoning review

    Closed

    192 OLD FOREST HILL RD · Jan 21, 2026 · 274 m away

Neighbourhood: Forest Hill North

About the area around the lot, not the lot itself.

Nearest station
Forest Hill Station9 min walk
Nearest TTC stop
Bathurst St at Elm Ridge Dr5 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
3,524 vehicles in 8 hManitou Blvd / Elm Ridge Dr, 200 m away, Jun 29, 2006
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Nicol Macnicol Parkette3 min walk
Wembley Parkette6 min walk

Schools within 1 km

  • WEST PREPARATORY JR PUBLIC SCHOOL English Public 5 min walk
  • ALIVE MONTESSORI AND PRIVATE SCHOOL Private 7 min walk
  • THE VILLAGE SHUL SYNAGOGUE & SUPPLMENTARY SCHOOL Private 8 min walk
  • EITZ CHAIM SCHOOL (BATHURST) Private 11 min walk
  • TORAH EMETH JEWISH CENTRE & EITZ CHAIM HEBREW SCHOOL Private 11 min walk
  • FOREST HILL COLLEGIATE INSTITUTE English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureForest Hill NorthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home35%54%
Population (2021)12,29016,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleForest Hill NorthCity median
Assault412.3636.3
Robbery7.269.5
Auto theft72.3192.6
Theft over $5,00050.646.1
Break and enter159.1172.8
Theft from vehicles79.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.