Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Natural Heritage System (11% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 213727 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 234839 (Installation of temporary tenting for Power Ball 2026 - ONE - 30'x60 -TENT (CERT#25 135..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- Building permit26 234839Inspection
Installation of temporary tenting for Power Ball 2026 - ONE - 30'x60 -TENT (CERT#25 135938 000 00) Anchored with water barrels. Install is Sept 15th. Event is Sept 17th. Removal is Sept 21st.
Sep 11, 2026 · 231 QUEENS QUAY W - By-law investigation26 213727 PRS 00 IRClosed
Property Standards
Aug 4, 2026 · 231 QUEENS QUAY W - Building permit07 219572Closed
Proposed 3 Certified Tents for Outdoor Event from May 29, 2007 to June 16, 2007. Certified No: 05- 194 268 05- 194225 05- 194 221
May 31, 2007 · 231 QUEENS QUAY W
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,539 m²
- Frontage
- 40 mestimated, irregular lot
- Depth
- 74.7 mestimated, irregular lot
- Street
- Queens Quay W
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,438 m²
- Back yard
- —house to rear lot line
- Buildings on the lot
- 8house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%2 of 2 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.
200 QUEENS QUAY W · Nov 12, 2025 · 230 m away - Minor varianceApproved
To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.
20 BAY ST · Jan 15, 2025 · 478 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.
200 QUEENS QUAY W · Dec 6, 2023 · 230 m away - Minor varianceApproved
To permit the permanent operation of an outdoor patio (including the canopy) on the ground floor of the existing 54-storey mixed-use building.
15 YORK ST · Dec 6, 2023 · 445 m away - Minor varianceApproved
To permit the increase of gaming machines within the existing entertainment complex building (The Rec Room).
255 BREMNER BLVD · Nov 22, 2023 · 457 m away
Latest activity nearby
- Building permit
Truss structure for outdoor lighting and sound equipment. - Install November 17, 2026 and Dismantle March 1, 2027
235 QUEENS QUAY W · Nov 18, 2026 · 126 m away - Building permit
Proposal for interior alterations to Cafe Bar Lobby, proposed hotel entrance awnings & refinishing existing cladding.
249 QUEENS QUAY W · Nov 17, 2026 · 299 m away - Building permit
Structural work required to support the roof AC unit replacement; Related to 26 243296
235 QUEENS QUAY W · Nov 2, 2026 · 126 m away - Building permit
Installation of two sets of doors within a public corridor
235 QUEENS QUAY W · Oct 7, 2026 · 126 m away - Building permit
Proposal for rooftop units replacement. - Harbourfront Centre Toronto
235 QUEENS QUAY W · Sep 30, 2026 · 126 m away - Building permit
Proposal to install a temporary tent & a tv support frame, tent has no walls and is anchored with concrete blocks, installed 18th to 21st sept, 2026
235 QUEENS QUAY W · Sep 21, 2026 · 126 m away - Building permit
Installation of temporary tenting for Power Ball 2026 - ONE - 30'x60 -TENT (CERT#25 135938 000 00) Anchored with water barrels. Install is Sept 15th. Event is Sept 17th. Removal is Sept 21st.
231 QUEENS QUAY W · Sep 11, 2026 · 30 m away - Building permit
1 Wall Sign****RABBA FINE FOODS****
250 A QUEENS QUAY W · Sep 11, 2026 · 275 m away - Minor variancePending
Application Withdrawn
200 QUEENS QUAY W · Aug 12, 2026 · 230 m away - Building permit
PROPOSED CONCRETE REPAIRS TO THE PARKING GARAGE FLOORS
249 QUEENS QUAY W · Jun 22, 2026 · 299 m away
Neighbourhood: Harbourfront-CityPlace
About the area around the lot, not the lot itself.
- Nearest station
- Queens Quay/Ferry Docks Station8 min walk
- Nearest TTC stop
- Queens Quay West at Harbourfront Centre2 min walk
- Nearest cycling route
- Martin Goodman / Waterfront TrlMulti-Use Trail - Boulevard, 2 min walk
- Nearest traffic count
- 7,181 vehicles in 8 hLower Simcoe St / Queens Quay W / Martin Goodman Trl, 130 m away, Apr 23, 2009
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 0 with cyclists
- Parks
- Toronto Waterfront Park1 min walk
- Rees Street Parkette4 min walk
- Harbour Square Park Lands4 min walk
Schools within 1 km
- JEAN LUMB PUBLIC SCHOOL English Public 16 min walk
- BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Harbourfront-CityPlace | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $90,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 28,135 | 16,813 |
| Homes built in 1960 or before | 0% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Harbourfront-CityPlace | City median |
|---|---|---|
| Assault | 883.3 | 636.3 |
| Robbery | 48.1 | 69.5 |
| Homicide | 2.8 | 5.3 |
| Shootings | 8.5 | 10.5 |
| Auto theft | 56.6 | 192.6 |
| Theft over $5,000 | 56.6 | 46.1 |
| Break and enter | 141.6 | 172.8 |
| Theft from vehicles | 121.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.