HousePrecheckCheck an address

230 Woolner AveToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (x146)50.3 × 117.7 m5,728 m²on Woolner Avecorner, also on Jane St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 9 storeys, 130 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
50.3 m frontage117.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 153843 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (9 storeys, 130 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 153843 PRS 00 IRClosed

    Property Standards

    May 1, 2026 · 230 WOOLNER AVE
  • Building permit15 132818Closed

    Proposal to install backflow prevention device.

    Apr 2, 2015 · 230 WOOLNER AVE
  • Building permit13 108220Closed

    Balcony repairs (120), Replacement of railing (818 linear meter).

    Mar 6, 2013 · 230 WOOLNER AVE
  • Building permit04 116521Closed

    Make interior alterations to the basement to convert from storage to 3 apartments.

    Jun 2, 2005 · 230 WOOLNER AVE

Check before you build

  • Site-specific exception 900.8.10(146)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(146)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 16(6) of the former City of York Zoning By-law No. 1-83.

By-law 569-2013, Chapter 900

Lot facts

Area
5,728 m²
Frontage
50.3 m
Depth
117.7 m
Street
Woolner Ave
Corner lot
Yes, also on Jane St117.7 m along it
Public lane
None
House footprint
1,408 m²roof up to 33.1 m
Back yard
26.6 mhouse to rear lot line
Side yards
14.2 m and 16.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone RAC (x146) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: elm, siberian (20 cm), honey locust (10 cm), elm (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    PROPOSED FRAME GARAGE

    50 FOXWELL ST · Nov 18, 2026 · 287 m away
  • Building permit

    Installation of backwater valve

    7 FLORENCE CRES · Nov 13, 2026 · 283 m away
  • Building permit

    PROPOSED FRAME GARAGE

    50 FOXWELL ST · Nov 3, 2026 · 287 m away
  • Building permitsecondary suite

    Proposal for a rear yard addition, rear deck and front porch extension, interior alterations, and 2nd floor addition and creation of a secondary suite.

    45 ELLINS AVE · Sep 28, 2026 · 293 m away
  • Building permitmultiplex

    Proposed two-storey additions, underpinning, and interior alterations to convert an existing two-storey detached dwelling from a single-family residence into three dwelling units.

    15 DUERN ST · Aug 27, 2026 · 246 m away
  • Building permit

    Install back water valve

    21 HANDEL ST · Aug 17, 2026 · 174 m away
  • Building permitgarden suite

    REVISION 01: Interior alterations and proposed dormers.Proposal to convert an existing 2 storey ancillary building to a garden suite.

    16 FOXWELL ST · May 11, 2026 · 158 m away
  • Building permitsecondary suite

    REVISION - for room layout change to second floor and Update to second floor and attic mechanical designProposal for second floor addition to existing 1 storey SFD, and convert to 2 units detached

    27 FOXWELL ST · Feb 20, 2026 · 214 m away
  • Building permit

    Proposal for replacement of two makeup air units and ten exhaust fans, complete with all associated electrical and structural work to support the new equipment.

    190 WOOLNER AVE · Feb 5, 2026 · 233 m away
  • Building permit

    Proposal to construct front porch and 2nd floor deck

    29 HANDEL ST · Dec 8, 2025 · 205 m away

Neighbourhood: Rockcliffe-Smythe

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station30 min walk
Nearest TTC stop
Jane St at Foxwell St1 min walk
Nearest cycling route
Black Creek TrlMulti-Use Trail, 4 min walk
Nearest traffic count
19,056 vehicles in 14 hJane St / Ellins Ave, 60 m away, Nov 12, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Woolner Park1 min walk
Marie Baldwin Park2 min walk
Black Creek Site West3 min walk

Schools within 1 km

  • GEORGE SYME COMMUNITY SCHOOL English Public 6 min walk
  • ROCKCLIFFE MDL SCHOOL English Public 7 min walk
  • THE HANEY CENTRE SCHOOL English Public 7 min walk
  • LAMBTON PARK COMMUNITY SCHOOL English Public 11 min walk
  • FRANK OKE SECONDARY SCHOOL English Public 11 min walk
  • ST JAMES CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRockcliffe-SmytheMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home56%54%
Population (2021)22,23516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRockcliffe-SmytheCity median
Assault742.7636.3
Robbery74.769.5
Shootings16.610.5
Auto theft157.7192.6
Theft over $5,00037.346.1
Break and enter132.8172.8
Theft from vehicles224188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.