HousePrecheckCheck an address

230 New Toronto StToronto · zoning, lot size and permit records

Employment · E 1.0 (x54)142.2 × 167.7 m22,244 m²on New Toronto Stcorner, also on Islington Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 25 119177 (NEW CARBON MONOXIDE SYSTEM, MAKEUP AIR UNIT, AND STRUCTURAL REINFORCING, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
142.2 m frontage167.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit25 119177Inspection

    NEW CARBON MONOXIDE SYSTEM, MAKEUP AIR UNIT, AND STRUCTURAL REINFORCING

    Mar 20, 2025 · 230 NEW TORONTO ST
  • Building permit21 156491Closed

    Proposal for interior alterations for a new tenant fitout of an existing vacant space - Warehouse & Office

    Aug 4, 2021 · 230 NEW TORONTO ST
  • Building permit19 133994Closed

    REVISION - as built drawingsProposal to construct a canopy at the entrance to an existing industrial building - "Sunbelt Rentals"

    Jul 30, 2019 · 230 NEW TORONTO ST
  • Zoning review19 145231 ZZCClosed
    Apr 26, 2019 · 230 NEW TORONTO ST
  • Building permit19 107402Closed

    To erect and display two illuminated wall signs displaying static copy, located on the first storey of the north elevation, measuring 1.22 m by 9.2 m, at a height of 8.69 m and on the south elevation, measuring 1.22 m by 9.2 m, at a height of 8.89 m. To erect and display one illuminated ground sign displaying static copy on the south elevation, measuring 1.52 m by 2.44 m at a height of 1.83 m.****SUNBELT RENTALS****

    Mar 25, 2019 · 230 NEW TORONTO ST
  • Building permit18 262268Inspection

    Proposed installation of wash bay and oil interceptor.

    Dec 13, 2018 · 230 NEW TORONTO ST
  • Zoning review11 239065 ZPRClosed
    Jul 15, 2011 · 230 NEW TORONTO ST
  • Building permit00 348787Cancelled

    Two new spray booths, etc. to existing wood working shop. HVAC Drawings to follow.

    Oct 24, 2000 · 230 NEW TORONTO ST
Show 2 older records
  • Building permit98 085803Closed

    DUST COLLECTOR TO INDUSTRIAL BUILDING

    Jun 28, 1999 · 230 NEW TORONTO ST
  • Building permit97 083503Closed

    INT. ALTS. TO CREATE LIQUID STORAGE ROOM

    Apr 3, 1997 · 230 NEW TORONTO ST

Check before you build

  • Site-specific exception 900.20.10(54)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(54)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    City of Toronto by-law 339-2012.

By-law 569-2013, Chapter 900

Lot facts

Area
22,244 m²
Frontage
142.2 m
Depth
167.7 m
Street
New Toronto St
Corner lot
Yes, also on Islington Ave167.7 m along it
Public lane
None
House footprint
7,114 m²roof up to 12.8 m
Back yard
89.3 mhouse to rear lot line
Side yards
7 m and 27.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (x54) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second storey addition above the existing building and a roof top patio.

    1 TOFFEE CRT · Nov 23, 2023 · 268 m away
  • Minor varianceApproved

    To construct a new one-storey addition above the existing building, and a new roof top amenity space.

    1 TOFFEE CRT · Jun 30, 2022 · 268 m away

Latest activity nearby

  • Building permit

    Proposal to construct a new loading dock to existing food bank storage facility - Daily Bread Food Bank

    191 NEW TORONTO ST · Aug 10, 2026 · 211 m away
  • Building permit

    1 Wall Sign ** DAILY BREAD FOOD BANK / COMMUNITY FOOD HUB **

    191 NEW TORONTO ST · Jul 20, 2026 · 211 m away
  • Building permit

    Revision 01: Revision to permit, including relocation of main fire alarm panel, removal of sprinkler head and other alterationsProposed addition that consists of granulated sugar silo facility with necessary equipment and truck bay. Renovation of part of the warehouse to allocate future equipment.

    198 NEW TORONTO ST · May 4, 2026 · 116 m away
  • Building permit

    Addition of external door and exterior weigh scale

    260 NEW TORONTO ST · Jul 15, 2025 · 172 m away
  • Zoning review

    Application On Hold

    260 NEW TORONTO ST · May 21, 2025 · 172 m away
  • Building permit

    Reconstruction of roof system due to previous structural failure & subsequent removal.

    260 NEW TORONTO ST · May 1, 2025 · 172 m away
  • Building permit

    NEW CARBON MONOXIDE SYSTEM, MAKEUP AIR UNIT, AND STRUCTURAL REINFORCING

    230 NEW TORONTO ST · Mar 20, 2025 · 51 m away
  • Building permit

    Feb 4, 2025 : Addition of New Mechanical and Controls Rooms in Existing Building, are removed from the scope of workProposal for demolition of unused portion of building. Rerouting of underground site services which currently run through demolition area. Addition of new mechanical and controls rooms in existing building.

    198 NEW TORONTO ST · Feb 4, 2025 · 116 m away
  • Building permit

    Design of dry stand pipe and sprinkler system for new silo building, cupola and loading area. Added Sprinkler protection of new electrical room - New Silo Building

    198 NEW TORONTO ST · Jan 29, 2025 · 116 m away
  • Building permit

    Design of sprinkler system for new mechanical room, new control room and fire protection room in the existing silo building and relocate fire department connection serving the existing silo building. - Existing Silo Building

    198 NEW TORONTO ST · Jan 28, 2025 · 116 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station19 min walk
Nearest TTC stop
Islington Ave at New Toronto St3 min walk
Nearest cycling route
Birmingham StCycle Track, 8 min walk
Nearest traffic count
8,332 vehicles in 8 hIslington Ave / New Toronto St, 140 m away, Apr 29, 2014
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Sixth Street Park4 min walk
Hillside Park7 min walk
Lamp Ground8 min walk

Schools within 1 km

  • SECOND STREET JR MDL SCHOOL English Public 11 min walk
  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 13 min walk
  • SEVENTH STREET JR SCHOOL English Public 15 min walk
  • MIMICO ADULT CENTRE English Public 15 min walk
  • THE MILDENHALL MONTESSORI SCHOOL Private 15 min walk
  • ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.