HousePrecheckCheck an address

23 Ross StKensington-Chinatown, Toronto · City records before you offer

Residential · R (f4.5; d1.0) (x835)6.4 × 34.3 m217 m²on Ross St

1 thing to check before you offer, including records mention garden suite, multiplex
N10 m
6.4 m frontage34.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 23 Ross St

23 Ross St is on a 6.4 m by 34.3 m lot on Ross St in Kensington-Chinatown. The zoning is R. A site-specific exception, 900.2.10(835), changes some of the usual rules for this address.

The City has 7 records on this lot since 2010. That is more than at 97% of Toronto houses. In 2026, a building permit was filed: "Revision 03: no longer applying for a rooming house and reverting to just interior alterations. revision 02- interior alterations to all units to convert each…". Status: closed. In 2026, a building permit was filed: "Proposal to construct a 2 storey garden suite in the rear yard". Status: closed. In 2026, a building permit was filed: "Proposal to install rooftop solar panels with ballast and structural anchors". Status: closed. Nothing on file is open right now.

Within 300 m, 2 development applications are open (the tallest up to 31 storeys). Queen's Park station is a 8-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Records mention garden suite, multiplexModerateFree check
  • Site-specific exception 900.2.10(835)Moderate
  • 2 development applications open within 300 mLowFree check
  • 1 City tree in front of this lotLowFree check
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Records mention garden suite, multiplex
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Records mention garden suite, multiplex

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

7 records on file, more than at 97% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-06-09Building permit
25 178098
Revision 03: No Longer applying for a rooming house and reverting to just interior alterations. Revision 02- Interior alterations to all units to convert each unit into a rooming house. Revision 01 - the total number of units remains as same but the configuration on the floor plans has changedProposed multiple projects including interior alterations and a partial third-storey addition to convert single family dwelling to fourplex.Closed
2026-05-12Building permit
25 244295
Proposal to construct a 2 storey garden suite in the rear yard.Closed
2026-04-28Building permit
26 150807
Proposal to install rooftop solar panels with ballast and structural anchors.Closed
2026-04-01Minor variance
A0803/25TEY
To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).Approved
2025-05-30Zoning review
25 167735 ZAP
No description on fileNotice Sent
2012-10-05Building permit
11 190602
Revision to add underpinning to scope of work in basement (44m).Closed
2010-09-21Zoning review
10 262290 ZPR
No description on fileCancelled
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(835)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(835)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(835)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: multiplex, garden suite
  • No public lane, so no laneway suite

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
6.4 m frontage34.3 m deepon Ross St
Zone
R (f4.5; d1.0) (x835)
Height limit
13 m
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
92 m²
Back yard
13.5 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 6 units

    On record

    Already permitted: 25 178098 (closed).

  • Secondary suite

    Likely fits
  • Garden suite

    On record

    Already permitted: 25 244295 (closed).

  • Laneway suite

    Not possible

Why, measured on this lot, and the most you could buildUnlock

Major change

Building nearby

How much neighbours are building and applying to change within 300 m

  • 2 development applications open within 300 m, up to 31 storeys
  • In the Queens Park station area
  • 25 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 2 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime well above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 1 of 7 categories
  • Theft over $5,000: 4.8 times the Toronto median
  • Theft from vehicles: 4.5 times the Toronto median
  • Assault: 3.2 times the Toronto median
  • Robbery: 2.8 times the Toronto median
  • Break and enter: 2.6 times the Toronto median
  • Shootings: 2.1 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Kensington-Chinatown neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$62,000median $84,500
Households that own their home32%median 54%
Population (2021)18,120median 16,813
Homes built in 1960 or before26%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Queen's Park StationNearest station8 min walk
  • College St at Beverley StNearest TTC stop1 min walk
  • Beverley StNearest cycling route1 min walk
  • Braemar College Private Secondary SchoolSchool2 min walk
  • Beverley & Subway Academy TwoSchool4 min walk
  • Ronald McDonald HouseSchool4 min walk
  • Cornerstone Preparatory School - Main CampusSchool5 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.32017.5
  • Robberycity median 69.5193
  • Shootingscity median 10.521.9
  • Auto theftcity median 192.6118.4
  • Theft over $5,000city median 46.1219.3
  • Break and entercity median 172.8443
  • Theft from vehiclescity median 188.1850.8

More about Kensington-Chinatown

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 23 Ross St

1 thing to check at 23 Ross St before you offer

  • Records mention garden suite, multiplexModerate
  • Site-specific exception 900.2.10(835)Moderate
  • 2 development applications open within 300 mLow
  • 1 City tree in front of this lotLow
  • and 2 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 5 steps to take before you offer, so nothing slips
  • What each of the 6 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.