Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 23 Major St
23 Major St is on a 4.9 m by 28.1 m lot on Major St in University. The zoning is R. A site-specific exception, 900.2.10(848), changes some of the usual rules for this address.
The City has 10 records on this lot since 2009. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "Proposal for multiple projects to an existing 3 storey sfd-townhouse. scope of work includes underpinning, new front porch, new front basement walkout and…". Status: closed. In 2021, a Committee of Adjustment application was filed: "To convert the existing three-storey, one unit townhouse to a three-storey, two unit townhouse by creating a secondary suite in the basement with a new front…". Status: closed. In 2012, a building permit was filed: "Admin permit for 25 major street". Status: closed. Nothing on file is open right now.
Within 300 m, 3 development applications are open. Within 300 m, the Committee of Adjustment decided 45 minor variance applications in the last 10 years and approved 93%. The nearest TTC stop is College St at Augusta Ave, a 2-minute walk.
Summary
What the City's records show on this house
- Records mention second unitModerateFree check
- Site-specific exception 900.2.10(848)Moderate
- 3 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention second unit
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2021-10-19 | Building permit21 222890 | Proposal for multiple projects to an existing 3 storey SFD-townhouse. Scope of work includes underpinning, new front porch, new front basement walkout and interior alterations to to add a 2nd suite in the basement. See also 21 139202 ZZC and 21 143961 MV. | Closed | |
| 2021-08-18 | Minor varianceA0512/21TEY | To convert the existing three-storey, one unit townhouse to a three-storey, two unit townhouse by creating a secondary suite in the basement with a new front porch and a new front basement walkout. | Approved | |
| 2021-04-12 | Zoning review21 139202 ZZC | No description on file | Closed | |
| 2012-01-13 | Building permit12 105899 | Admin permit for 25 Major Street | Closed | |
| 2011-11-17 | Building permit11 306646 | This is an administrative permit for a party wall in conjunction with construction activity at 21 Major Street | Closed | |
| 2010-10-18 | Building permit10 272629 | Administrative partywall permit in conjunction with 10 129881 BLD, 25 Major Street. | Closed | |
| 2010-05-27 | Building permit09 179053 | Revision to construct a second floor rear addition (11m2), interior alterations on second floor (63m2), and altering two openings on ground floor at side and rear of existing single family townhouse.Also see PPR file 09-187797, and CofA file 09-198674. | Closed | |
| 2010-03-31 | Minor varianceA0116/10TEY | To construct a second floor addition at the rear and a third floor addition and deck onto the existing two storey row house | Approved | |
| 2010-02-05 | Building permit09 160320 | Partywall Administative permit in conjuction with 09 152525 BLD, 25 Major St. See also 09 160310 BLD. | Closed | |
| 2009-11-13 | Zoning review09 187797 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(848)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(848)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(848)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: second unit
- Multiplex up to 6 units: likely fits
- Laneway suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x848)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Grimsby Dairy Lane, 4.9 m along it
- New house permit
- None since 2000
- House footprint
- 95 m²
- Back yard
- 7.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m
- 33 suite and multiplex permits within 300 m in 10 years
- 45 minor variance decisions within 300 m, 93% approved
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Break and enter: 4.2 times the Toronto median
- Assault: 2.7 times the Toronto median
- Theft over $5,000: 2.6 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Robbery: 1.9 times the Toronto median
- Theft from vehicles: 1.9 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
University neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station16 min walk
- College St at Augusta AveNearest TTC stop2 min walk
- College StNearest cycling route2 min walk
- Lord Lansdowne Jr Sr & Da VinciSchool2 min walk
- Westside Montessori Elementary SchoolSchool4 min walk
- Kensington Community SchoolSchool5 min walk
- King Edward Jr & Sr Public SchoolSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31740.5
- Robberycity median 69.5133.9
- Homicidecity median 5.312.2
- Auto theftcity median 192.6182.6
- Theft over $5,000city median 46.1121.7
- Break and entercity median 172.8730.3
- Theft from vehiclescity median 188.1353
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist