Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register5 building permits open, the oldest since 2001
Needs a closer lookStill open in the City's records: 10 125188 (Installation of a 2" backflow prevention device within the basement. (229 YONGE ST) (Of..., 2010, status Inspection); 10 139558 (Installation of a 1" backflow prevention device within the basement. (225 YONGE ST) (Re..., 2010, status Inspection); 05 203462 (Interior alterations to existing Urban Outfitters, 2005, status Inspection); and 2 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 233104 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations11 development applications open within 300 m
Good to know11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
63 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation25 248302 WST 00 IRClosed
Waste
Nov 3, 2025 · 229 YONGE ST - By-law investigation25 233104 PRS 00 IRClosed
Property Standards
Sep 30, 2025 · 229 YONGE ST - Zoning review23 232639 LTOClosedDec 5, 2023 · 225 YONGE ST
- Zoning review19 238592 ZPRClosedOct 20, 2019 · 225 YONGE ST
- Building permit19 190773Closed
To erect and display two static illuminated wall signs and two non-illuminated projecting signs, all displaying static copy. One wall sign and one projecting sign erected at on the west and others on the south elevation of the building located at the premises.**SWEAT & TONIC**
Sep 25, 2019 · 229 YONGE ST - Building permit18 230653Closed
Revision #01 - Changes as per attached.Interior alterations to portions of lower level, ground floor, and 2nd floor (existing "Retail-2" unit) to convert from retail to fitness facility with accessory uses (see cover letter). Tenatn - "SWEAT & TONIC". See ZZC 18 192118.
Sep 24, 2019 · 229 YONGE ST - Building permit19 212361Cancelled
Proposal to install (1) maglock on the ground level.
Aug 27, 2019 · 229 YONGE ST - Building permit19 169604Cancelled
Proposal for wood construction space to create themed photo backdrop. Start Date June 14, 2019. Tear Down date 17 Jun 19.
Jun 11, 2019 · 229 YONGE ST
Show 55 older records
- Building permit18 227247Closed
Revision 01: Code-compliant guards at second and ground floor, incl. detail. (A300, A301), Location of emergency lighting, fire pull stations, fire alarms and exit signage (A300, A301), Accurate drawings showing existing interior condition vs. demolished at ground floor (A200, A300),Panic hardware at all exit doors (A300, A301).Proposal for interior alterations to prepare space for new tenant in existing multi unit building
Mar 1, 2019 · 229 YONGE ST - Zoning review18 192118 ZZCClosedJul 11, 2018 · 229 YONGE ST
- Zoning review15 206497 ZZCClosedAug 13, 2015 · 229 YONGE ST
- Building permit15 171725Closed
Proposal to install 1 mag lock on the 3rd floor. See active BLD permit 15 124890.
Jul 10, 2015 · 229 YONGE ST - Building permit15 137048Closed
Proposal to install 1 maglock in existing office space on the 4th floor - Suite 400
Apr 29, 2015 · 229 YONGE ST - Building permit15 124890Closed
Interior alteration to convert vacant space into office space on the 3rd floor of the existing building.
Apr 8, 2015 · 229 YONGE ST - Building permit14 213786Closed
Proposal for interior alterations on the 4th floor, suite 400 for "Regus"
Dec 19, 2014 · 229 YONGE ST - Building permit10 125188Inspection
Installation of a 2" backflow prevention device within the basement. (229 YONGE ST) (Offiec space)
Apr 1, 2010 · 225 YONGE ST - Building permit10 139558Inspection
Installation of a 1" backflow prevention device within the basement. (225 YONGE ST) (Retail Store)
Mar 31, 2010 · 225 YONGE ST - Building permit09 154589Closed
Proposal to reconstruct a portion of basement roof slab in existing commercial building.
Sep 8, 2009 · 229 YONGE ST - Building permit08 220506Closed
permit to install one maglock double maglock to existing office space - floor 4 - suite 400 - Mica
Nov 17, 2008 · 229 YONGE ST - Building permit08 194319Closed
Minor alterations to ground and second floor of exisiting retail store. Convenience address 235 Yonge St.
Aug 26, 2008 · 229 YONGE ST - Building permit08 105950Closed
Interior alterations to create newly demised Suite on 4th floor. Multi Tenant Floor.
Feb 15, 2008 · 229 YONGE ST - Building permit07 251293Closed
Make interior alterations to office.
Aug 16, 2007 · 229 YONGE ST - Building permit07 212075Cancelled
Make interior alterations to retail store to provide structural support for suspended mechanical units (existing).
May 28, 2007 · 231 YONGE ST - Building permit06 106890Closed
Interior alterations to existing retail store on ground floor basement, & fill in portion of ground floor. Tenant - Buffalo. Conven. address 225 Yonge St.
Feb 8, 2006 · 229 YONGE ST - Building permit05 203462Inspection
Interior alterations to existing Urban Outfitters.
Dec 28, 2005 · 229 YONGE ST - Zoning review05 200037 ZPRClosedNov 4, 2005 · 229 YONGE ST
- Building permit04 165598Closed
To repair a portion of concrete slab over the basement.
Sep 10, 2004 · 229 YONGE ST - Building permit01 153843Permit Issued
provide fire suppression system for transformer vaults in connection with 01-133157 historical (plans received Feb 27/03 & delivered to S. Tung)
Mar 11, 2003 · 229 YONGE ST - Building permit01 189403Closed
install fixtures on 2nd floor- 5 w.c., 4 w.b., 1 urinal, 4 v.f.d., 1 h.w.t. see bp#01-118136
Oct 25, 2001 · 229 YONGE ST - Building permit01 133157Closed
make interior alterations for transformer vault -STRUCTURAL WORK ONLY IN THIS PERMIT-Hold for Fire Suppression System Application.historical
Jun 29, 2001 · 229 YONGE ST - Building permit01 122803Closed
install fixtures on 4th floor- 3 k.s., 7 w.c., 2 urinals, 6 w.b., 1 shower, 1 d.w. 'Historical' see bp#01-122795 tenant: MICA Management Resources Corp.
May 25, 2001 · 229 YONGE ST - Building permit01 132778Closed
Replace sprinkler system on 4th floor.
May 14, 2001 · 229 YONGE ST - Building permit01 123306Closed - Dormant
Alter HVAC system and related duct work on 4th floor. 'Historical'tenant: MICA Management Resources Corp. COST INCLUDED IN 01 122795
May 8, 2001 · 229 YONGE ST - Building permit01 122795Closed
install partitions on 4th floor. 'Historical' tenant: MICA Management Resources Corp.
May 3, 2001 · 229 YONGE ST - Building permit01 118136Closed
removal of interior non-loadbearing partitions only on 2nd floor. all life safety systems to remain in place and functional no renovations or other interior alterations included. historical
Apr 26, 2001 · 229 YONGE ST - Building permit01 125752Closed
To connect to the existing 6" sprinkler line for 1" domestic. "listed as Historical"
Apr 9, 2001 · 229 YONGE ST - Building permit01 108538Closed
removal of interior non-loadbearing partitions only. all life safety systems to remain in place and functional no renovations or other interior alterations included. historical
Feb 21, 2001 · 229 YONGE ST - Building permit00 364328Permit Issued
Install sprinkler system to the 3rd floor area. l i s t e d h i s t o r i c a l
Feb 9, 2001 · 229 YONGE ST - Building permit01 107123Closed
Install 1 mag log at the entry door on the ground floor
Feb 1, 2001 · 229 YONGE ST - Building permit01 106015Closed
Install partitions on 3rd floor level (office). Tenant FSC
Jan 31, 2001 · 229 YONGE ST - Building permit00 363256Closed - Dormant
supply and install h.v.a.c. system.1000 m2
Jan 25, 2001 · 229 YONGE ST - Building permit01 103940Closed
install fixtures: 3rd fl- 2wc, 2wb, 2 fd, 1 hub drain, 1 ks, 4th fl: 7 wc, 6 wb, 4 fd, 1 hub drain, 1 ks, 2 showers
Jan 23, 2001 · 229 YONGE ST - Zoning review01 035461 ZSVClosedJan 18, 2001 · 229 YONGE ST
- Zoning review01 104231 000ClosedJan 18, 2001 · 229 YONGE ST
- Building permit00 346011Closed
removal of interior non-loadbearing partitions only. all lifesafety systems to remain in place and functional. no renovations or other interior alterations included. l i s t e d h i s t o r i c a l
Oct 19, 2000 · 229 YONGE ST - Zoning review00 145917 000ClosedMay 1, 2000 · 229 YONGE ST
- Building permit99 014558Closed
INSTALL HVAC 2 NEW ROOF TOP UNITS TO SUPPLY FOR 5TH FLOOR ONLY REFER TO APPLICATION NUMBER: 423019
Nov 19, 1999 · 229 YONGE ST - Building permit99 013923Closed
INSTALL PARTITIONS ON PORTION OF THE 5TH FLOOR OFFICE. TENANT: HERE LOCAL 75 "HISTORICAL" /LM
Nov 15, 1999 · 229 YONGE ST - Building permit98 020290Closed
SHOP DRAWNING APPLICATION FOR SPRINKLER SYSTEM IN CONECTION WITH BUILDING PERMIT NO. 414921 COST INCLUDED UNDER PERMIT NO. 414921
Mar 26, 1999 · 229 YONGE ST - Building permit98 019852Closed
CONSTRUCT EXIT STAIR ADDITION ON GROUND FLOOR TO 5TH FLOOR LEVEL. ALSO MAKE INTERIOR ALTERTIONS 2ND, 3RD, 4TH, AND 5TH FLOOR. EDC
Oct 30, 1998 · 229 YONGE ST - Building permit98 019498Closed
SUPPLY AND INSTALL H.V.A.C. SYSTEM AND ALL RELATIVE DUCTWORK. REFER TO APPLICATION NUMBER: 414921
Oct 30, 1998 · 229 YONGE ST - Building permit98 021334Closed
INSTALL FIXTURES ON 3RD FLOOR OFFICE: 4 W.C., 4 W.B., 2 URINALS, 1 SLOP SINK, 2 V.F.D. /LM
Sep 10, 1998 · 229 YONGE ST - Building permit98 019323Closed
MAKE INTERIOR ALTERATIONS TO BASEMENT, 1ST & 2ND FLOOR FOR RETAIL STORE PURPOSES. ALTER STORE FRONTS. TENANT: HUDSONS BAY COMPANY OUTFITTERS FEE $3815.4
Aug 18, 1998 · 229 YONGE ST - Building permit98 017714Closed
SUPPLY AND INSTALL H.V.A.C. ON 5TH FLOOR (TWO NEW R.T.V. PLUS DUCTWORK AND SANITARY EXHAUST).SEE BP #411130. FEE $80.00
Jun 15, 1998 · 229 YONGE ST - Building permit98 015546Closed
MAKE INTERIOR ALTERATIONS TO 5TH FLOOR FOR OFFICE PURPOSES JNB MARCUS AREGAWI FAM
Apr 23, 1998 · 229 YONGE ST - Zoning review96 025569 LTOClosedOct 8, 1996 · 231 YONGE ST
- Zoning review94 025098 LTOClosedJun 20, 1994 · 229 YONGE ST
- Zoning review93 024818 LTOClosedMar 3, 1993 · 235 YONGE ST
- Zoning review91 025996 LTOClosedJan 16, 1991 · 235 YONGE ST
- Zoning review88 030272 LTOClosedMar 31, 1988 · 229 YONGE ST
- Zoning review86 028427 LTOClosedOct 15, 1986 · 229 YONGE ST
- Zoning review86 028074 LTOClosedMay 8, 1986 · 229 YONGE ST
- Zoning review82 026258 LTOClosedJul 8, 1982 · 235 YONGE ST
Check before you build
Site-specific exception 900.11.10(2533)
Needs a closer look7 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(1) 431 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 258 of former City of Toronto By-law 438-86
- Older by-law E
Section 12(2) 260 of former City of Toronto By-law 438-86
- Older by-law F
Section 12(2) 316 of former City of Toronto By-law 438-86
- Older by-law G
Former City of Toronto by-law 97-0194
1 part for other addresses
- H On 209 Yonge St., former City of Toronto by-law 95-0602.
Lot facts
- Area
- 1,518 m²
- Frontage
- 37.5 m
- Depth
- 41 m
- Street
- Shuter St
- Corner lot
- Yes, also on Yonge St41 m along it
- Public lane
- O'Keefe Lane, 48.2 m along it
- House footprint
- 1,411 m²
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0.4 m and 0.4 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 46 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 174. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 6.0 (c4.5; r6.0) SS1 (x2533) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%7 of 7 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 25
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 365 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 475 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 406 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 417 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 347 m away
Latest activity nearby
- Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 185 m away - Building permit
7 wall signs***WELL HEALTH MEDICAL CENTRES***
20 RICHMOND ST E · Nov 16, 2026 · 284 m away - Zoning review
Closed
220 YONGE ST · Nov 10, 2026 · 87 m away - Zoning review
Closed
2 QUEEN ST E · Nov 10, 2026 · 197 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 156 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 22nd and 26th floors.
20 QUEEN ST W · Nov 6, 2026 · 239 m away - Building permit
Proposed interior alterations to existing tenant retail space.
220 YONGE ST · Nov 6, 2026 · 87 m away - Building permit
Proposal for interior alterations to an existing retail store to accommodate a new tenant.
220 YONGE ST · Nov 6, 2026 · 87 m away - Building permit
Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.
260 YONGE ST · Nov 6, 2026 · 69 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.
1 DUNDAS ST W · Nov 5, 2026 · 223 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station4 min walk
- Nearest TTC stop
- Yonge St at Shuter St1 min walk
- Nearest cycling route
- Shuter StBike Lane, 1 min walk
- Nearest traffic count
- 10,405 vehicles in 14 hYonge St / Shuter St, 40 m away, Apr 12, 2025
- Serious collisions within 500 m
- 162021–2026, killed or seriously injured: 2 fatal, 10 with pedestrians, 1 with cyclists
- Parks
- Trinity Square2 min walk
- Larry Sefton Park5 min walk
- Toronto Metropolitan University Square5 min walk
Schools within 1 km
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
- TMU - HEASLIP HOUSE University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.