HousePrecheckCheck an address

2250 Kennedy RdToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (au41.7) (x38)68.0 × 152.5 m8,947 m²on Kennedy Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 18 storeys, 136 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 25 185206 ESC 22 OZ (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025); 25 185149 ESC 22 SB (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • City upkeep score: 97 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: AgincourtThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
68.0 m frontage152.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 224373 PRS 00 IR (Property Standards, 2026); 26 170440 000 00 IR (Adequate Heat, 2026); 26 170439 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 185206 ESC 22 OZ (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025); 25 185149 ESC 22 SB (The proposed development includes 4 new infill towers buildings with heights of 49-, 44..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 97 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (18 storeys, 136 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 224373 PRS 00 IRClosed

    Property Standards

    Aug 23, 2026 · 2250 KENNEDY RD
  • By-law investigation26 170440 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2250 KENNEDY RD
  • By-law investigation26 170439 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2250 KENNEDY RD
  • Development application25 185206 ESC 22 OZUnder Review

    The proposed development includes 4 new infill towers buildings with heights of 49-, 44-, 31- and 17-storeys, along with the retention of the existing 17-storey building at 2250 Kennedy Road. The subject site will be divided into four blocks including the new north-south road, two new parks and the central development block. The proposal is currently anticipated to be purpose-built rental.

    Jun 27, 2025 · 2250 KENNEDY RD · City file
  • Development application25 185149 ESC 22 SBUnder Review

    The proposed development includes 4 new infill towers buildings with heights of 49-, 44-, 31- and 17-storeys, along with the retention of the existing 17-storey building at 2250 Kennedy Road. The subject site will be divided into four blocks including the new north-south road, two new parks and the central development block. The proposal is currently anticipated to be purpose-built rental.

    Jun 27, 2025 · 2250 KENNEDY RD · City file
  • Zoning review19 240479 LPRClosed
    Oct 24, 2019 · 2250 KENNEDY RD
  • Building permit03 187570Closed

    REPAIRS TO 129 BALCONIES

    Nov 7, 2003 · 2250 KENNEDY RD
  • Building permit00 337792Closed

    INTERIOR ALTERATIONS, EQUIPMENT ROOM & ANTENNA INSTALLATION

    Nov 13, 2000 · 2250 KENNEDY RD
Show 1 older records
  • Building permit98 200841Closed

    BALCONY REPAIR

    Oct 10, 2000 · 2250 KENNEDY RD

Check before you build

  • Site-specific exception 900.8.10(38)

    Needs a closer look

    12 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(38)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a front lot line that abuts a street is: (i) 36.0 metres measured from the original centre line of the street if the front lot line abuts Sheppard Ave. or Kennedy Rd.; and (ii) 12.0 metres in all other cases

  2. Rule B

    The minimum building setback from a side lot line and rear lot line is a distance equal to the greater of: (i) half the height of the building ; or (ii) half the length of the building

  3. Rule C

    The minimum building setback from a lot line that abuts a lot in an RD or RS zone is 15.0 metres

  4. Rule D

    The minimum separation between the main walls of two residential buildings on the same lot is a distance equal to half the total combined height of the two buildings

  5. Rule E

    A minimum of 50% of the lot area must be landscaping

  6. Rule F

    Amenity space must be provided in each building at a minimum rate of 46 square metres for the first dwelling unit plus 0.9 square metres for each dwelling unit in excess of 50

  7. Rule G

    The maximum lot coverage is 18%

  8. Rule H

    Parking spaces must be provided at a minimum rate of 1.125 for each dwelling unit

  9. Rule I

    A minimum of 75% of all parking spaces must be underground

  10. Rule J

    A minimum of 11% of the parking spaces must be for visitors

  11. Rule K

    The minimum building setback from a lot line for a below grade parking structure is a distance equal to half the vertical distance from the lowest floor of the structure to the average elevation of grade at the front lot line

  12. Rule L

    The maximum building height is 54.0 metres.

By-law 569-2013, Chapter 900

Lot facts

Area
8,947 m²
Frontage
68 m
Depth
152.5 m
Street
Kennedy Rd
Corner lot
No
Public lane
None
House footprint
866 m²roof up to 58.9 m
Back yard
76.4 mhouse to rear lot line
Side yards
24.4 m and 24.9 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Agincourt. The lot is inside the Agincourt Major Transit Station Area approved by the Province (Site and Area Specific Policy 694). Source
  • Agincourt Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RAC (au41.7) (x38) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
80%4 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
10

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    2351 KENNEDY RD · Nov 5, 2026 · 245 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    3 COLLINGWOOD ST · Nov 3, 2026 · 174 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    7 COLLINGWOOD ST · Nov 3, 2026 · 199 m away
  • Building permitdemolition

    Complete demolition of the existing vacant single-family dwelling to facilitate future construction of a multi-unit townhouse development.

    5 COLLINGWOOD ST · Nov 3, 2026 · 190 m away
  • Building permit

    Proposed unheated front porch enclosure.

    56 DEMPSTER ST · Oct 15, 2026 · 265 m away
  • Building permitsecondary suite

    Proposal for interior alterations to create a secondary suite

    138 EARLTON RD · Jul 27, 2026 · 183 m away
  • Zoning review

    Closed

    2351 KENNEDY RD · Jul 6, 2026 · 245 m away
  • Building permit

    Alteration for restairant and Barrier Free Washroom

    4002 SHEPPARD AVE E · Jun 11, 2026 · 177 m away
  • Building permitsecondary suite

    PROPOSE A BASEMENT SECOND DWELLING UNIT

    2218 KENNEDY RD · Apr 24, 2026 · 118 m away
  • Building permit

    Proposed tenant fit-up to create a spa unit - unit D2

    2330 KENNEDY RD · Mar 9, 2026 · 220 m away

Neighbourhood: Tam O'Shanter-Sullivan

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station5 min walk
Nearest TTC stop
Sheppard Ave East at Kennedy Rd2 min walk
Nearest cycling route
West Highland Creek TrlMulti-Use Trail, 9 min walk
Nearest traffic count
21,829 vehicles in 8 hKennedy Rd / Jade St, 120 m away, Jan 31, 2017
Serious collisions within 500 m
62021–2026, killed or seriously injured: 2 fatal, 4 with pedestrians, 0 with cyclists
Parks
Collingwood Park4 min walk
Inglewood Heights Park5 min walk
Ron Watson Park8 min walk

Schools within 1 km

  • MAPLE LEAF COLLEGIATE SCHOOL Private 3 min walk
  • CANADA INTERNATIONAL COLLEGE SCHOOL Private 3 min walk
  • INGLEWOOD HEIGHTS JR PUBLIC SCHOOL English Public 7 min walk
  • TAM O'SHANTER JR PUBLIC SCHOOL English Public 13 min walk
  • AGINCOURT JR PUBLIC SCHOOL English Public 15 min walk
  • AGINCOURT MONTESSORI SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureTam O'Shanter-SullivanMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home56%54%
Population (2021)27,20516,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleTam O'Shanter-SullivanCity median
Assault446.6636.3
Robbery96.869.5
Homicide3.15.3
Shootings12.510.5
Auto theft209.2192.6
Theft over $5,00034.446.1
Break and enter124.9172.8
Theft from vehicles256.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.