Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2002
Needs a closer lookStill open in the City's records: 02 137787 (TO INSTALL PLUMBING FIXTURES IN 3 STOREY BUILDING. ORIGINAL BUILDING PERMIT #01-122186, 2002, status Inspection); 02 104698 (TO INSTALL NEW FIRE ALARM THROUGHOUT THE APARTMENT BUILDING. 3 STOREYS A ND BASEMENT (..., 2002, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (24% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 96 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 217654 PRS 00 IR (Property Standards, 2026); 26 201492 PRS 00 IR (Property Standards, 2026); 26 173454 000 00 IR (Adequate Heat, 2026); and 3 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 Committee of Adjustment files on this lot
Good to know2 approved. A59/01HY (This application was previously approved by the Committee of Adjustment on February 15,..., 2001); A676/00NY (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2001).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)Rental building evaluation: 97 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 10 units, built 1958).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 217654 PRS 00 IRClosed
Property Standards
Aug 11, 2026 · 2250 KEELE ST - By-law investigation26 201492 PRS 00 IRClosed
Property Standards
Jul 14, 2026 · 2250 KEELE ST - By-law investigation26 173454 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 2250 KEELE ST - By-law investigation26 173453 000 00 IRClosed
Property Standards
Jun 1, 2026 · 2250 KEELE ST - By-law investigation26 171604 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 2250 KEELE ST - By-law investigation26 171603 000 00 IRClosed
Property Standards
Jun 1, 2026 · 2250 KEELE ST - Building permit02 137787Inspection
TO INSTALL PLUMBING FIXTURES IN 3 STOREY BUILDING. ORIGINAL BUILDING PERMIT #01-122186.
Jun 17, 2002 · 2250 KEELE ST - Building permit02 137793Closed
TO INSTALL HVAC TO 3 STOREY BUILDING. ORIGINAL BUILDING PERMIT # 01-122186.
Jun 11, 2002 · 2250 KEELE ST
Show 5 older records
- Building permit01 122186Closed
CONSTRUCTING A NEW THREE STOREY RESIDENTIAL BUILDING
Feb 25, 2002 · 2250 KEELE ST - Building permit02 104698Inspection
TO INSTALL NEW FIRE ALARM THROUGHOUT THE APARTMENT BUILDING. 3 STOREYS A ND BASEMENT ( A WALKOUT).
Feb 1, 2002 · 2250 KEELE ST - Minor varianceA59/01HYApproved
This application was previously approved by the Committee of Adjustment on February 15, 2001 to permit the construction of a four-storey, 15-unit apartment building on condition that 18 parking spaces and 2 visitor parking spaces are provided. The applicant is seeking a variance to provide only 13 parking spaces and 2 visitor parking spaces.
Sep 11, 2001 · 2250 KEELE ST - Zoning review01 137656 000ClosedMay 15, 2001 · 2250 KEELE ST
- Minor varianceA676/00NYApproved
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a four storey, fifteen unit apartment building to the rear of the existing three storey, ten unit apartment building on the above noted site. The existing parking garage would be demolished.
Feb 15, 2001 · 2250 KEELE ST
Lot facts
- Area
- 1,255 m²
- Frontage
- 19.9 m
- Depth
- 73.1 m
- Street
- Keele St
- Corner lot
- No
- Public lane
- None
- House footprint
- 325 m²roof up to 14.9 m
- Back yard
- 6.5 mhouse to rear lot line
- Side yards
- 2.7 m and 4.1 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- 35%
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Minimum frontage 21 m. Frontage is about 19.9 m: below the minimum. Fine for the existing lot, but a new lot or major rebuild may need a variance. Source
- Minimum lot area 925 m². Lot area is 1,255 m²: meets the minimum. Source
- Zone RM (f21.0; a925; d0.85) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
Around this lot
- Minor variances approved
- 100%10 of 10 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 1
- Multiplex permits
- 2
- Development applications
- 0
Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a one-storey rear addition.
28 ARROWSMITH AVE · Nov 6, 2025 · 288 m away - Minor varianceApproved
To construct a fourth storey above the existing three storey condominium building.
60 GULLIVER RD · Jun 28, 2007 · 377 m away - Minor varianceApproved
To permit the construction of a one-storey (sunroom) addition to the rear of the existing dwelling.
53 GOTHAM CRT · May 28, 2002 · 168 m away - Minor varianceApproved
This application was previously approved by the Committee of Adjustment on February 15, 2001 to permit the construction of a four-storey, 15-unit apartment building on condition that 18 parking spaces and 2 visitor parking spaces are provided. The applicant is seeking a variance to provide only 13 parking spaces and 2 visitor parking spaces.
2250 KEELE ST · Sep 11, 2001 · 10 m away - Minor varianceApproved
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a four storey, fifteen unit apartment building to the rear of the existing three storey, ten unit apartment building on the above noted site. The existing parking garage would be demolished.
2250 KEELE ST · Feb 15, 2001 · 10 m away
Latest activity nearby
- Building permit
Proposal to construct new interior piping for a new water closet, lavatory, bathtub, double-bowl kitchen sink on second floor & new washing machine connection on ground floor.
2292 KEELE ST · Nov 25, 2026 · 134 m away - Building permit
REV 01: Revision to permit (as bubbled and as per change order)Proposal for interior alterations of second floor.
2265 KEELE ST · Nov 17, 2026 · 82 m away - Zoning review
Closed
2308 KEELE ST · Nov 10, 2026 · 174 m away - Building permit
INSIDE BACK WATER VALVE
8 GOTHAM CRT · Nov 4, 2026 · 289 m away - Building permit
Proposal for a one storey rear addition and interior alterations to existing single family dwelling
28 ARROWSMITH AVE · Oct 30, 2026 · 288 m away - Zoning review
Notice Sent
15 ARROWSMITH AVE · Oct 15, 2026 · 246 m away - Zoning review
Closed
9 DENSLEY AVE · Sep 29, 2026 · 151 m away - Zoning review
Closed
9 DENSLEY AVE · Sep 1, 2026 · 151 m away - Minor varianceApproved
To permit a recreational use (padel court) within the rear of the existing industrial building.
9 DENSLEY AVE · Jul 16, 2026 · 151 m away - Building permit
Proposal to install an HVAC System and dryer vent within the second floor residential unit. Unit A
2292 KEELE ST · Jun 25, 2026 · 134 m away
Neighbourhood: Brookhaven-Amesbury
About the area around the lot, not the lot itself.
- Nearest station
- Keelesdale Station20 min walk
- Nearest TTC stop
- Keele St at Densley Ave2 min walk
- Nearest traffic count
- 13,360 vehicles in 8 hKeele St / Densley Ave / Flamborough Dr, 120 m away, Feb 1, 2022
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Westview Greenbelt2 min walk
- Gulliver Park6 min walk
- Redbank Greenbelt7 min walk
Schools within 1 km
- GEORGE ANDERSON PUBLIC SCHOOL English Public 7 min walk
- IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
- CHARLES E WEBSTER JR PUBLIC SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Brookhaven-Amesbury | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $73,000 | $84,500 |
| Households that own their home | 41% | 54% |
| Population (2021) | 17,495 | 16,813 |
| Homes built in 1960 or before | 30% | 29% |
| Homes needing major repairs | 9% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Brookhaven-Amesbury | City median |
|---|---|---|
| Assault | 610.9 | 636.3 |
| Robbery | 62.7 | 69.5 |
| Homicide | 5.2 | 5.3 |
| Shootings | 10.4 | 10.5 |
| Auto theft | 193.2 | 192.6 |
| Theft over $5,000 | 47 | 46.1 |
| Break and enter | 167.1 | 172.8 |
| Theft from vehicles | 182.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.