HousePrecheckCheck an address

225 The East MallToronto · zoning, lot size and permit records

≈ 181.5 × 109.5 m10,237 m²on The East Mall

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 12 230603 (Interior alterations to retail store for CAA, 2012, status Inspection); 11 258669 (interior renovations for UPS Store, 2011, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
≈ 181.5 m frontage≈ 109.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 12 230603 (Interior alterations to retail store for CAA, 2012, status Inspection); 11 258669 (interior renovations for UPS Store, 2011, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

30 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit19 227057Closed

    Proposal for interior alterations and installation of kitchen hood from vacant to restaurant under 30.UNIT 3 TAZA EXPRESS

    Oct 29, 2019 · 225 THE EAST MALL
  • Building permit19 216139Closed

    To erect and display an illuminated static copy wall sign on the south elevation. Measuring 0.72m by 5.99m at a height of 4.45m from the grade.**Sarajevo Grill & Meat**

    Oct 16, 2019 · 225 THE EAST MALL
  • Building permit19 183350Closed

    Revision 01: Site conditions resulting in changes to the bathroomProposal for interior alterations to existing commercial unit for new tenant - UNIT 15, "Connect Hearing"

    Sep 5, 2019 · 225 THE EAST MALL
  • Building permit18 240950Closed

    To erect and display one illuminated wall sign******CAA*******

    Nov 28, 2018 · 225 THE EAST MALL
  • Building permit18 101414Closed

    Interior altertaions to units 6, 7, & 8 for the expansion of an existing CAA retail store (originally in units 7 &8 only).

    Feb 5, 2018 · 225 THE EAST MALL
  • Zoning review13 273935 LTOClosed
    Dec 4, 2013 · 225 THE EAST MALL
  • Building permit13 139975Closed

    Install (1) backflow preventer and thermal expantion tank to mechanical room

    Apr 26, 2013 · 225 THE EAST MALL
  • Building permit13 130947Closed

    To erect and display two illuminated overhanging structure signs with static copy on the southerly elevation of the building, in conjunction with a new bakery. **Coco - Bakery**

    Apr 18, 2013 · 225 THE EAST MALL
Show 22 older records
  • Building permit12 294444Closed

    Interior alterations to unit to create bakery in Unit 13 - Coco Bakery

    Jan 15, 2013 · 225 THE EAST MALL
  • Zoning review12 273540 ZZCClosed
    Nov 5, 2012 · 225 THE EAST MALL
  • Building permit12 230603Inspection

    Interior alterations to retail store for CAA

    Sep 18, 2012 · 225 THE EAST MALL
  • Building permit11 326056Closed

    Interior alterations to demolish and add new partition walls to vacant space and create *First Choice Hair Salon* Unit 4

    Jan 31, 2012 · 225 THE EAST MALL
  • Building permit11 258669Inspection

    interior renovations for UPS Store

    Sep 22, 2011 · 225 THE EAST MALL
  • Building permit11 209858Closed

    Proposed interior alterations to an existing vacant unit to create a new medical office within an existing multi-use commercial plaza - UNIT #9. No plumbing or HVAC work are proposed.

    Jun 21, 2011 · 225 THE EAST MALL
  • Building permit10 210664Closed - Dormant

    Plumbing - Interior alteration of unit #25 to construct medical offices for hearing clinic.

    Aug 6, 2010 · 225 THE EAST MALL
  • Zoning review10 195639 ZPUClosed
    Jun 14, 2010 · 225 THE EAST MALL
  • Zoning review07 102886 LTOClosed
    Jan 17, 2007 · 225 THE EAST MALL
  • Zoning review07 102043 LTOClosed
    Jan 12, 2007 · 225 THE EAST MALL
  • Building permit04 111753Closed

    Kitchen range exhaust at an existing restauant. **Kalyna Deli and Catering**

    Jan 3, 2007 · 225 THE EAST MALL
  • Zoning review06 148500 LTOClosed
    Jun 20, 2006 · 225 THE EAST MALL
  • Building permit06 143346Closed

    interior alters to ground floor only

    Jun 19, 2006 · 225 THE EAST MALL
  • Building permit04 180101Closed

    Install mechanical stand alone kitchen exhaust system to existing take-out restaurant.

    Jan 20, 2005 · 225 THE EAST MALL
  • Building permit04 161579Closed

    Proposed int. alt. to exist. restaurant to create a DSR

    Sep 3, 2004 · 225 THE EAST MALL
  • Building permit04 158318Cancelled

    designated smoke room for Pub

    Jul 20, 2004 · 225 THE EAST MALL
  • Zoning review04 128001 LTOClosed
    Apr 26, 2004 · 225 THE EAST MALL
  • Zoning review02 152129 LTOClosed
    Jun 28, 2002 · 225 THE EAST MALL
  • Building permit02 134652Closed

    Interior alterations/partitiions to retail store. Unit 16

    May 9, 2002 · 225 THE EAST MALL
  • Zoning review01 165571 000Closed
    Aug 3, 2001 · 225 THE EAST MALL
  • Building permit00 161895Closed

    Replace an existing exhaust hood to existing *Yellow Cup* cafe restaurant. Unit 1 Refer: B58229

    Sep 6, 2000 · 225 THE EAST MALL
  • Building permit00 132462Closed

    Interior alterations to 'Ukrainian Credit Union'. HVAC and plumbing permits included.

    May 4, 2000 · 225 THE EAST MALL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
10,237 m²
Frontage
181.5 mestimated, irregular lot
Depth
109.5 mestimated, irregular lot
Street
The East Mall
Corner lot
No
Public lane
None
House footprint
2,926 m²roof up to 8 m
Back yard
17.9 mhouse to rear lot line
Side yards
36.4 m and 42.3 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: spruce, colorado blue (25 cm), serviceberry (8 cm), buckeye, yellow (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
5

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To permit two front yard parking spaces.

    36 PAULART DR · Jul 16, 2026 · 365 m away
  • Minor varianceApproved

    To legalize and to maintain the rear second storey platform.

    57 SILVERHILL DR · Aug 29, 2024 · 410 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage and a secondary suite.

    11 BILLINGHAM RD · Mar 28, 2024 · 271 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    19 VICKSON CRT · May 5, 2022 · 492 m away
  • Minor varianceApproved

    To construct a two-storey rear addition, a second storey addition above the existing dwelling and a rear yard deck. The existing secondary suite will be relocated to the second floor.

    8 YARN RD · Apr 21, 2022 · 139 m away

Latest activity nearby

  • Building permit

    Fire Damage Restoration - To Restore to Pre-Loss Condition: Order Number: 26 185723 UNS 00 VI. Related permit 26-264186 BLD 00 SR.

    243 THE EAST MALL · Nov 13, 2026 · 156 m away
  • Zoning review

    Application Acceptable

    250 THE EAST MALL · Nov 10, 2026 · 222 m away
  • Building permit

    Proposal for a Back water valve installation

    22 YARN RD · Nov 9, 2026 · 125 m away
  • Building permit

    Proposed interior fit-up for a rexall pharmacy - unit # 125

    250 THE EAST MALL · Nov 5, 2026 · 222 m away
  • Building permit

    Proposed construction of a new enclosed front porch and enlargement of the existing rear sunroom (21.21 m²). Related permit 26 263692 BLD 00 SR.

    243 THE EAST MALL · Nov 2, 2026 · 156 m away
  • Building permitdemolition

    Demolish existing 2239m2 school.

    160 SILVERHILL DR · Sep 30, 2026 · 207 m away
  • Building permit

    Proposal to iInstall (5) temporary tents for Relish Festival: ONE 82'x82' TENT (CERT#25 135831 000 00), ONE 30'x25' TENT (CERT#25 137586 000 00), ONE 40'x45' TENT (CERT#25 135929 000 00), ONE 30'x40' TENT (CERT#25 135938 000 00), ONE 20'x40' TENT (CERT#25 135795 000 00). Anchored by stakes. Install is Sept 14th. Event is Sept 18- 20th. Removal is Sept 22nd

    250 THE EAST MALL · Sep 9, 2026 · 222 m away
  • Building permit

    Proposed installation of five (5) temporary tents for Relish Festival: ONE 82'x82' TENT (CERT#25 135831 000 00), ONE 30'x25' TENT (CERT#25 137586 000 00), ONE 40'x45' TENT (CERT#25 135929 000 00), ONE-30'x40' TENT (CERT#25 135938 000 00), ONE 20'x40' TENT (CERT#25 135795 000 00). Anchored by stakes. Install is Sept 14th. Event is Sept 18- 20th. Removal is Sept 22nd

    250 THE EAST MALL · Aug 21, 2026 · 222 m away
  • Building permit

    Proposal to install two 30' x 40' tents. Install date June 24, Removal date June 29

    250 THE EAST MALL · Jun 22, 2026 · 222 m away
  • Building permit

    Proposal to install two 30' x 40' tents. Install date June 24, Removal date June 29

    250 THE EAST MALL · Jun 17, 2026 · 222 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station24 min walk
Nearest TTC stop
The East Mall at Yarn Rd South Side1 min walk
Nearest cycling route
Renforth DrBike Lane, 16 min walk
Nearest traffic count
11,341 vehicles in 8 hThe East Mall / East Mall Cres, 90 m away, Jan 18, 2023
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Silverhill Park2 min walk
Cloverdale Park9 min walk
Snowellen Avenue Parkette10 min walk

Schools within 1 km

  • ETOBICOKE SECONDARY ALTERNATIVE SCHOOL English Public 3 min walk
  • ST ELIZABETH CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • BLOORLEA MDL SCHOOL English Public 11 min walk
  • KINGSLEY PRIMARY SCHOOL Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.