HousePrecheckCheck an address

225 The Donway WToronto · zoning, lot size and permit records

Also 215 The Donway W

Residential apartment · RA (f21.0; a835) (x367)≈ 133.9 × 143.9 m12,134 m²on Langbourne Plcorner, also on The Donway W

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 121373 (Localized structural concrete repairs associated with the parking garage top deck rehab..., 2026); 24 251452 (Proposal for existing amenity space on level below grade to be modernized to provide AO..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 133.9 m frontage≈ 143.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 196612 (Maglock Upgrade Installation, 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 121373 (Localized structural concrete repairs associated with the parking garage top deck rehab..., 2026); 24 251452 (Proposal for existing amenity space on level below grade to be modernized to provide AO..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 121373Permit Issued

    Localized structural concrete repairs associated with the parking garage top deck rehabilitation and waterproofing under the entrance drive lanes shared by the two apartment buildings 215 and 225 The Donway West.

    Apr 1, 2026 · 215 THE DONWAY W
  • By-law investigation26 131855 WST 00 IRClosed

    Waste

    Mar 19, 2026 · 215 THE DONWAY W
  • By-law investigation25 216236 WST 00 IRClosed

    Waste

    Aug 26, 2025 · 215 THE DONWAY W
  • By-law investigation25 154345 WST 00 IRClosed

    Waste

    May 5, 2025 · 215 THE DONWAY W
  • Building permit24 251452Permit Issued

    Proposal for existing amenity space on level below grade to be modernized to provide AODA compliant facilities and improve use of space.

    Apr 10, 2025 · 225 THE DONWAY W
  • By-law investigation25 133576 WST 00 IRClosed

    Waste

    Mar 24, 2025 · 215 THE DONWAY W
  • Building permit24 196612Permit Issued

    Maglock Upgrade Installation

    Oct 15, 2024 · 215 THE DONWAY W
  • Building permit13 221721Closed

    Replacement of three MUA and one Cooling Tower

    Sep 16, 2013 · 215 THE DONWAY W
Show 5 older records
  • Building permit13 139663Closed

    Relocating bathtub drain - Suite 205

    Apr 2, 2013 · 225 THE DONWAY W
  • Building permit11 285046Closed

    Install Backflow Prevention Devices

    Oct 20, 2011 · 215 THE DONWAY W
  • Building permit09 172182Closed - Dormant
    Oct 5, 2009 · 215 THE DONWAY W
  • Building permit07 108105Closed

    Fire alarm panel replacement on the ground floor south end utility room

    Mar 15, 2007 · 215 THE DONWAY W
  • Building permit07 111333Cancelled

    Boiler replacement in parking garage

    Mar 13, 2007 · 215 THE DONWAY W

Check before you build

  • Site-specific exception 900.7.10(367)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(367)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    On these lands former City of North York by-law 29075.

By-law 569-2013, Chapter 900

Lot facts

Area
12,134 m²
Frontage
133.9 mestimated, irregular lot
Depth
143.9 mestimated, irregular lot
Street
Langbourne Pl
Corner lot
Yes, also on The Donway W143.9 m along it
Public lane
None
Max height
—
Max lot coverage
35%
  • Central Don Mills Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 21 m. Frontage is about 133.9 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 835 m². Lot area is 12,134 m²: meets the minimum. Source
  • Zone RA (f21.0; a835) (x367) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: oak (26 cm), horsechestnut (25 cm), oak (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%13 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Interior alterations to an existing restaurnat. - Unit R0001A - Naan Kabob

    1090 DON MILLS RD · Nov 26, 2026 · 267 m away
  • Building permit

    2 wall signs**CANDY PROM & EVENING**

    1090 DON MILLS RD · Nov 19, 2026 · 267 m away
  • Building permit

    Application for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign: 0.91m L x 3.05m W x 0.15m D at a height of 5.69 on the east elevation.** BEER WINE **

    1090 DON MILLS RD · Oct 16, 2026 · 267 m away
  • Building permit

    1 wall sign + 1 projecting sign***LA PAIGE NAILS***

    1090 DON MILLS RD · Oct 13, 2026 · 267 m away
  • Building permit

    1 wall sign.***METRO***

    1090 DON MILLS RD · Oct 8, 2026 · 267 m away
  • Zoning review

    Closed

    1090 DON MILLS RD · Sep 25, 2026 · 267 m away
  • Building permit

    Install 1 first party wall sign and 1 first party over hanging structure sign. **Naan Kabob**

    1090 DON MILLS RD · Sep 23, 2026 · 267 m away
  • Building permit

    Proposal for interior alterations to a retail space - Unit M6A - Crock A Doodle

    1090 DON MILLS RD · Sep 23, 2026 · 267 m away
  • Building permit

    Install One (1) Wall Sign***THE GOLDEN HIVE***

    1090 DON MILLS RD · Sep 9, 2026 · 267 m away
  • Building permit

    Interior alterations to a retail space - Unit M6A - Crock A Doodle

    1090 DON MILLS RD · Sep 8, 2026 · 267 m away

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Don Valley Station32 min walk
Nearest TTC stop
Opposite 230 The Donway West1 min walk
Nearest cycling route
Duncairn Park TrlMulti-Use Trail, 1 min walk
Nearest traffic count
6,533 vehicles in 8 hLangbourne Pl / The Donway W, 90 m away, Sep 28, 2017
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Duncairn Park1 min walk
Macklin Hancock Park4 min walk
Mallow Park7 min walk

Schools within 1 km

  • NORMAN INGRAM PUBLIC SCHOOL English Public 5 min walk
  • DON MILLS MDL SCHOOL English Public 9 min walk
  • DON MILLS COLLEGIATE INSTITUTE English Public 10 min walk
  • SENECA HILL PRIVATE SCHOOL Private 11 min walk
  • OVERLAND LEARNING CENTRE English Public 12 min walk
  • CLEARVIEW SCHOOL OF ARTS AND CULTURE Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.