HousePrecheckCheck an address

225 Milliken BlvdToronto · zoning, lot size and permit records

Employment · EH 0.5325.1 × 184.5 m55,158 m²on Milliken Blvd

Not a home

Mcnicoll Garage (Ttc)

The City of Toronto's real estate inventory lists Mcnicoll Garage (Ttc) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelStill open in the City's records: 18 202249 (Proposed sprinklers for industiral processing plant, 2018, status Permit Issued); 18 136132 (Proposed interior alterations for food processing with new kitchen food, 2018, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
325.1 m frontage184.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (8% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 2 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 18 202249 (Proposed sprinklers for industiral processing plant, 2018, status Permit Issued); 18 136132 (Proposed interior alterations for food processing with new kitchen food, 2018, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit23 161551Closed

    REV01 - Plumbing - REVISED PLUMBING FIXTURE AND GREASE INTERCEPTOR.Plumbing - INTERIOR ALTERATIONS - REMOVE NON-LOADBEARING WALL, NEW WALK-IN COOLER & FREEZER, NEW WASHROOMS

    Sep 18, 2023 · 225 MILLIKEN BLVD
  • Building permit18 202249Permit Issued

    Proposed sprinklers for industiral processing plant.

    Aug 15, 2018 · 225 MILLIKEN BLVD
  • Building permit18 136132Permit Issued

    Proposed interior alterations for food processing with new kitchen food.

    Apr 18, 2018 · 225 MILLIKEN BLVD
  • Development application15 183368 ESC 39 SAClosed

    The proposed TTC Mcnicoll bus garage will be a new indoor storage facility with capacity for 250 buses. In addition to bus storage space, the new facility will also include a traffic office, 2 service lines, an employee parking lot, a repair bay area, bus cleaning facilities, an exterior vehicle wash system, a body shop, maintenance and transportation offices, a cafeteria and employee change rooms.

    Jun 30, 2015 · 225 MILLIKEN BLVD · City file

Lot facts

Area
55,158 m²
Frontage
325.1 m
Depth
184.5 m
Street
Milliken Blvd
Corner lot
No
Public lane
None
House footprint
21,294 m²
Back yard
19.3 mhouse to rear lot line
Side yards
11.5 m and 126.9 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 0.5 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
  • 25 City trees in front of this lot. The City's street tree inventory lists 25 trees at this address: elm, accolade (70 cm), olive, russian (13 cm), olive, russian (13 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    2155 MCNICOLL AVE · Aug 28, 2026 · 278 m away
  • Building permit

    2 WALL SIGNS**DONG JIE KOU****AUTHENTIC FUZHOU NOODLE SOUP**

    385 SILVER STAR BLVD · Aug 21, 2026 · 299 m away
  • Building permit

    To erect and display two illuminated wall signs.***DONG JIE KOU (Authentic Fuzhou Noodle Soup)***

    385 SILVER STAR BLVD · Aug 10, 2026 · 299 m away
  • Building permit

    PROPOSED INTERIOR ALTERATIONS TO THE EXISTING RESTAURANT, INCLUDING THE ADDITION OF ONE NEW WASHROOM. THE TOTAL OCCUPANT LOAD IS PROPOSED TO INCREASE TO 60 PERSONS.

    2150 MCNICOLL AVE · Jul 31, 2026 · 205 m away
  • Building permit

    Proposal for interior alterations to existing office suite.

    385 SILVER STAR BLVD · Jun 5, 2026 · 299 m away
  • Development application

    Draft Plan of Condominium for 16 units

    2075 MCNICOLL AVE · May 11, 2026 · 191 m away · City file
  • Building permit

    interior alterations to create new dentistry office

    2190 MCNICOLL AVE · May 7, 2026 · 300 m away
  • Building permit

    3 WALL SIGNS**NICOCA RAMEN**

    385 SILVER STAR BLVD · Apr 15, 2026 · 299 m away
  • Building permit

    Part Permit - Proposal to construct two one storey plus mezzanie industrial buildings (shell only) with a total GFA of 13,439 s.m.See also 23 235666 ESC 22 SA.

    2075 MCNICOLL AVE · Apr 9, 2026 · 190 m away
  • Building permit

    3 Wall Sign

    385 SILVER STAR BLVD · Feb 27, 2026 · 299 m away

Neighbourhood: Milliken

About the area around the lot, not the lot itself.

Nearest TTC stop
McNicoll Ave at Milliken Blvd2 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 2 min walk
Nearest traffic count
13,083 vehicles in 8 hMilliken Blvd / McNicoll Ave, 170 m away, Oct 27, 2020
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
L'Amoreaux North Park6 min walk
L'Amoreaux Hydro7 min walk
Shepton Way Park9 min walk

Schools within 1 km

  • MARY WARD CATHOLIC SECONDARY SCHOOL English Separate 7 min walk
  • MILLIKEN PUBLIC SCHOOL English Public 14 min walk
  • KENNEDY PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMillikenMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home88%54%
Population (2021)23,98016,813
Homes built in 1960 or before2%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMillikenCity median
Assault334.2636.3
Robbery197.569.5
Shootings1910.5
Auto theft607.7192.6
Theft over $5,000125.346.1
Break and enter254.5172.8
Theft from vehicles398.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.