Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2248 Dufferin St
2248 Dufferin St is on a 11.8 m by 26.7 m lot on Dufferin St in Caledonia-Fairbank. The zoning is RM. A site-specific exception, 900.6.10(252), changes some of the usual rules for this address. The lot also fronts Rowan Ave.
The City has 7 records on this lot since 2024. That is more than at 97% of Toronto houses. In 2026, a building permit was filed: "Drain - proposal for a 1-storey garden suite". Status: closed. In 2025, a Committee of Adjustment application was filed: "To convert the previously approved one-storey ancillary building (detached garage with access from rowan avenue, as approved in minor variance decision…". Status: closed. In 2024, a building permit was filed: "To demolish existing dwelling and construct a new three storey fourplex". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open (the tallest up to 40 storeys). Fairbank station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention garden suite, multiplexModerateFree check
- Site-specific exception 900.6.10(252)Moderate
- 1 development application open within 300 mLowFree check
- 8 City trees in front of this lotLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention garden suite, multiplex
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention garden suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-03-19 | Building permit25 261941 | Drain - Proposal for a 1-storey garden suite. | Closed | |
| 2025-09-10 | Minor varianceA0550/25TEY | To convert the previously approved one-storey ancillary building (detached garage with access from Rowan Avenue, as approved in Minor Variance Decision A0409/24TEY) into a one-storey ancillary building containing one garden suite and a south side patio with canopy above. The existing driveway will be removed. There will be a total of five residential dwelling units on this lot (four units within the main building under construction and one unit within the ancillary building). | Approved | |
| 2025-05-23 | Zoning review25 164185 ZAP | No description on file | Application On Hold | |
| 2025-01-23 | Building permit24 197292 | Rev - Revision to basement layoutTo demolish existing dwelling and construct a new three storey fourplex | Cancelled | |
| 2024-10-31 | Building permit24 197304 | To demolish existing dwelling and construct a new three storey fourplex | Closed | |
| 2024-07-03 | Minor varianceA0409/24TEY | To construct a new three-storey detached dwelling (fourplex) with front balconies on the first, second, and third floors, and a front basement walkout and stairs. Also, to reconstruct the rear one-storey ancillary building (detached garage). There will be a total of four residential dwelling units on this lot.. | Approved | |
| 2024-01-26 | Zoning review24 108505 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.6.10(252)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.6.10(252)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
8 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.6.10(252)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, garden suite
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- RM (f12.0; u4; d0.8) (x252)
- Height limit
- 11 m
- Corner lot
- Yes, also on Rowan Ave
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 40 storeys
- In the Fairbank station area
- 32 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Caledonia-Fairbank neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Fairbank StationNearest station6 min walk
- Dufferin St at Rowan AveNearest TTC stop1 min walk
- Vaughan RdNearest cycling route5 min walk
- Lycee Francais de TorontoSchool2 min walk
- Fairbank Public SchoolSchool4 min walk
- St John Bosco Catholic Elementary SchoolSchool7 min walk
- St Thomas Aquinas Catholic Elementary SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3552.3
- Robberycity median 69.574.9
- Shootingscity median 10.59.4
- Auto theftcity median 192.6280.8
- Theft over $5,000city median 46.118.7
- Break and entercity median 172.8121.7
- Theft from vehiclescity median 188.1159.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist