HousePrecheckCheck an address

223 Redpath AveToronto · zoning, lot size and permit records

Also 223 Redpath Ave, 225 Redpath Ave, 227 Redpath Ave, 229 Redpath Ave, 231 Redpath Ave

Residential · R (d2.0) (x99)37.2 × 36.0 m1,209 m²on Redpath Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 39 storeys, 448 rental units, built 2024More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 20 development applications open within 300 m, up to 61 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
37.2 m frontage36.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 9 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 258065 HEA 00 IR (Adequate Heat, 2026); 26 252382 PRS 00 IR (Property Standards, 2026); 26 252379 PRS 00 IR (Property Standards, 2026); and 6 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 61 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Apartment).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (39 storeys, 448 units, built 2024).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 258065 HEA 00 IRClosed

    Adequate Heat

    Oct 21, 2026 · 223 REDPATH AVE
  • By-law investigation26 252382 PRS 00 IRClosed

    Property Standards

    Oct 9, 2026 · 223 REDPATH AVE
  • By-law investigation26 252379 PRS 00 IRClosed

    Property Standards

    Oct 9, 2026 · 223 REDPATH AVE
  • By-law investigation26 180320 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 8, 2026 · 223 REDPATH AVE
  • By-law investigation26 138850 PRS 00 IRClosed

    Property Standards

    Apr 4, 2026 · 223 REDPATH AVE
  • By-law investigation25 238490 PRS 00 IRClosed

    Property Standards

    Oct 10, 2025 · 225 REDPATH AVE
  • By-law investigation25 227612 PRS 00 IRClosed

    Property Standards

    Sep 18, 2025 · 223 REDPATH AVE
  • By-law investigation25 178671 PRS 00 IRClosed

    Property Standards

    Jun 17, 2025 · 223 REDPATH AVE
Show 11 older records
  • By-law investigation25 125315 PRS 00 IRClosed

    Property Standards

    Mar 6, 2025 · 231 REDPATH AVE
  • By-law investigation25 111213 HEA 00 IRClosed

    Adequate Heat

    Jan 31, 2025 · 223 REDPATH AVE
  • Building permit20 224637Closeddemolition

    Proposal to demolish existing semi detached house.

    Apr 6, 2021 · 231 REDPATH AVE
  • Building permit20 224636Closeddemolition

    Proposal to demolish existing semi detached house.

    Apr 6, 2021 · 229 REDPATH AVE
  • Building permit20 224547Closeddemolition

    Proposal to demolished existing semi SFD house.

    Apr 6, 2021 · 227 REDPATH AVE
  • Building permit20 224527Closeddemolition

    Proposal to demolish existing semi-detached house.

    Apr 6, 2021 · 225 REDPATH AVE
  • Building permit20 224488Closeddemolition

    Proposal to demolish an existing semi detached house

    Apr 6, 2021 · 223 REDPATH AVE
  • Development application19 243515 NNY 15 SAClosed

    Site Plan Control Application for the combined sites at 100, 110, 114 and 120 Broadway Avenue and 223-233 Redpath Avenue. The development consists of 3 towers: a 39-storey building containing 448 purpose-built rental units and 100 square metres of retail space at-grade on 100 Broadway Avenue. Two residential towers at 37- and 26-storeys in height, connected by a base building containing 965 residential units and 626.5 square metres of office space is proposed on 110-120 Broadway Avenue. Immediately south of the 100 Broadway Avenue building on the northeast corner of Broadway and Redpath Avenues is a new 746 square metre public park with surrounding POPS.(The rezonings for these sites were approved under two applications: 15 228723 NNY 25 OZ and 17 218847 NNY 25 OZ, and further amended by Minor Variance approvals no. A0066/23NY and A0064/23NY).

    Oct 31, 2019 · 233 REDPATH AVE · City file
  • Development application15 228723 NNY 15 OZClosed

    The application proposes to amend the former City of Toronto Zoning By-law 438-86 and new City of Toronto Zoning By-law 569-2013 to permit a 34-storey (107 metre) apartment building at 100 Broadway Avenue and 223-225 Redpath Avenue. The proposed building would contain a total of 329 residential dwellings units including 52 rental replacement dwelling units. The total gross floor area for this project is 19,580 m2 with a 120 m2 non-residential component on the ground floor facing Broadway Avenue. The floor space index would be 13.41 times the area of the lot. Vehicular access to the site is proposed from Redpath Avenue abutting the north property line. A total of 100 parking spaces comprised of 91 resident spaces and 9 visitor spaces are proposed in a three level underground parking garage. A total of 660 m2 of indoor amenity space and 240 m2 of outdoor amenity space is proposed on the second floor of the building.

    Sep 25, 2015 · 225 REDPATH AVE · City file
  • Building permit03 184502Closed

    Install 4" sanitary drains and fixtures. See plans and fixture schedule attached.

    Oct 16, 2003 · 225 REDPATH AVE
  • Building permit02 147377Closed

    excavate and underpin to lower basement, party wall to be benched

    Jun 18, 2002 · 225 REDPATH AVE

Check before you build

  • Site-specific exception 900.2.10(99)

    Needs a closer look

    19 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(99)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 100 Broadway Avenue and 223, 225, 227, 229, 231 and 233 Redpath Avenue, if the requirements of Sections 4 and 5 and Schedule A of By-law 71-2021(LPAT) are complied with, a building or structure may be erected or constructed in compliance with Sections

  2. Rule B

    to (S) below; (B) Despite regulation 10.10.20.40 (1), a mixed use building is a permitted building type

  3. Rule C

    Despite regulation 10.10.20.10 (1), the following uses are permitted: (i) Dwelling Unit in a permitted building type; (ii) Municipal Shelter ; (iii) Park ; (iv) Retail Store ; and (v) Offices

  4. Rule D

    Despite regulation 10.5.40.10(1), height is measured from the Canadian Geodetic Datum elevation of 159.30 metres and the elevation of the highest point of the building

  5. Rule E

    Despite regulation 10.10.40.10(1), the permitted maximum height of a building or structure is the height in metres specified by the numbers following the symbol HT on Diagram 3 of By-law 71-2021(LPAT)

  6. Rule F

    Despite Section (E) above and regulation 10.5.40.10, the following building elements and structures may project above the permitted maximum height in Diagram 3 of By-law 71-2021(LPAT) as follows: (i) roof drainage materials, thermal insulation, roof assemblies including decking and pavers or roof ballast, parapets, terraces, patios, balustrades, bollards, and accessory structures , may project above the height limits by no more than 1.5 metres; (ii) elements on the roof of the building or structure used for green roof technology and related roofing material may project above the height limits by no more than 2.0 metres; (iii) parapets, garbage chutes, aircraft warning lights, lightning rods, safety railings, guard rails, ornamental or architectural elements and features, balcony and terrace partitions and dividers, telecommunications equipment and antennae, planters, retaining walls, wheelchair ramps, and lightning rods to a maximum of 2.3 metres; (iv) equipment used for the functional operation of the building , such as electrical, utility, air handling, emergency generators, mechanical, exhaust flues, vents, ventilation equipment, and associated screening to a maximum of 3.0 metres; (v) stairs, elevator shafts and enclosed stairwells, window washing equipment to a maximum of 3.0 metres; (vi) structures on the roof of any part of the building used for outside or open air recreation, acoustical barriers, wind mitigation features, amenity space features, amenity space screens, trellises, gazebos, landscape elements and features, fencing, canopies, enclosed stairs, unenclosed stairs, elevator shafts, to a maximum of 4.0 metres

  7. Rule G

    Despite regulations 5.10.40.70(1), 10.5.40.70(1) and Clause 10.10.40.70, the required minimum building setbacks for all above ground portions of any building or structure are as shown on Diagram 3 of By-law 71-2021(LPAT)

  8. Rule H

    Despite regulations 10.5.40.60(1), (2), (3), (5), (7) and (8) and Section G above, the following may encroach into the required minimum building setbacks on Diagram 3 of By-law 71-2021(LPAT): (i) a platform, mechanical penthouse or balcony attached to or within 0.3m from a building may encroach into the required building setbacks to a maximum of 2.1 metres unless otherwise prohibited as shown in Diagram 3 of this By-law; (ii) an entrance canopy, awning, or similar structure at the ground floor, with or without structural support, or a roof over a platform may encroach into the required building setbacks to a maximum of 3.0 metres; (iii) underground garage access ramps may encroach into a required building setback to a maximum of 3.0 metres; (iv) exterior stairs, wheelchair access ramps, pedestrian access ramps, and elevating devices may encroach into a required building setback to a maximum of 3.0 metres; (v) architectural features including lighting on a building may encroach into a required building setback to a maximum of 1.0 metres; (vi) roof parapets may encroach into a required building setback to a maximum of 1.0 metres; and, (vii) vents, pipes, utility equipment, siamese connections, satellite dishes, and antennas (including mounting poles) may encroach into a required building setback to a maximum of 1.0 metres

  9. Rule I

    Despite regulation 10.10.40.40(1), the permitted maximum gross floor area is 27,250 square metres

  10. Rule J

    Despite 10.5.40.40(4), the gross floor area of a mixed use building with may be reduced by the area in the building used for: (i) Parking, loading and bicycle parking at, above or below ground; (ii) Required loading spaces at the ground level and required bicycle parking spaces at, above or below ground; (iii) Storage rooms, washrooms, electrical, utility, mechanical and ventilation rooms in any level of the building ; (iv) Shower and change facilities required by this By-law for required bicycle parking spaces ; (v) Residential amenity space required and above the requirement of this By-law; (vi) Elevator shafts; (vii) Garbage shafts; (viii) Mechanical Penthouse; and (ix) Exit stairwells in the building .

  11. Rule K

    A maximum of 413 dwelling units are permitted, of which a minimum of 8% must have three-bedrooms with the required amount rounded down to the nearest whole number

  12. Rule L

    Despite regulation 10.10.40.50(1), a minimum of 710 square metres of indoor amenity space and a minimum 575 square metres of outdoor amenity space must be provided

  13. Rule M

    Despite clause 200.5.10.1 parking spaces must be provided and maintained as follows: (i) a minimum of 70 parking spaces for residential and residential visitor uses and parking spaces may be allocated in any combination to the residents on the lot and the residents of the lot known municipally in the year 2021 as 110-120 Broadway Avenue

  14. Rule N

    Despite Article 200.15.1 and By-law 579-2017, accessible parking spaces must be provided as follows; (i) of the required parking spaces in (M) above, a minimum of 3 must be accessible parking spaces and must be provided in the underground parking garage; (ii) accessible parking spaces must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.9 metres; and (c) vertical clearance of 2.1 metres; (iii) despite N(ii) above, the minimum required width of 3.9 metres may be reduced to 3.4 metres provided that an accessible barrier-free aisle or path measuring 1.5 metres in width is provided along a side of the parking space for its entire length; and (iv) despite 200.15.1(4), accessible parking spaces may be located anywhere in the underground parking garage

  15. Rule O

    Despite clause 220.5.10.1, a minimum of one Type "G" and one Type "C" loading space must be provided on the lot

  16. Rule P

    Despite regulation 200.5.1.10(2), a maximum of 10 parking spaces may have a minimum width of 2.6 metres when obstructed on one or two sides

  17. Rule Q

    Despite regulation 200.5.10.1(12) the total minimum number of parking spaces required on the lot may be reduced at a rate of 1 vehicle parking space for each 5 bicycle parking spaces provided in excess of the minimum number of bicycle parking spaces required by By-law 569-2013 if the reduction of vehicle parking spaces is not greater than 20% of the total minimum of vehicle parking spaces required

  18. Rule R

    Bicycle parking spaces must be provided and maintained on the lot in accordance with the following: (i) Despite regulations 230.5.10.1(1), (3) and (5): (a) a minimum of 0.9 bicycle parking spaces per dwelling unit must be provided as long-term bicycle parking spaces ; and (b) a minimum of 0.1 bicycle parking spaces per dwelling unit must be provided as short-term bicycle parking spaces ; (ii) Despite regulation 230.5.1.10(2), the number of required bicycle parking spaces shall be rounded down when the calculation results in a fraction; (iii) Despite regulation 230.5.1.10(4), a bicycle parking space oriented in a horizontal position must have a minimum length of 1.8 metres, a minimum width of 0.45 metres and a minimum vertical clearance of 1.9 metres; (iv) Despite 4(R)(iii), if a stacked bicycle parking space is provided, the minimum vertical clearance for each bicycle parking space is 1.2 metres; (v) Despite regulation 230.5.1.10(4), a bicycle parking space oriented in a vertical position must have a minimum length or vertical clearance of 1.9 metres, a minimum width of 0.45 metres and a minimum horizontal clearance from the wall of 1.2 metres; (vi) Despite regulation 230.5.1.10(9), long-term and short-term bicycle parking spaces for dwelling units may be located anywhere above or below ground in the building ; (vii) Despite regulation 230.5.1.10(10), long-term and short-term bicycle parking spaces for dwelling units may be provided in any combination of vertical, horizontal or stacked positions; (viii) Despite regulation 230.10.1.20(2), a short-term bicycle parking space may be located more than 30 metres from a pedestrian entrance to the building on the lot and may be located in a secured room or an unsecured room

  19. Rule S

    Regulation 10.5.50.10(4) does not apply.

By-law 569-2013, Chapter 900

Lot facts

Area
1,209 m²
Frontage
37.2 m
Depth
36 m
Street
Redpath Ave
Corner lot
No
Public lane
None
House footprint
263 m²roof up to 13.3 m
Back yard
11.4 mhouse to rear lot line
Side yards
0.6 m and 24.8 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
38 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x99) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
95%18 of 19 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
46

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 406 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 406 m away
  • Minor varianceApproved

    To alter the existing semi-detached dwelling by constructing a rear second storey addition.

    50 SHERWOOD AVE · May 21, 2026 · 443 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units.

    170 ROEHAMPTON AVE · Apr 1, 2026 · 209 m away
  • Minor varianceApproved

    To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.

    241 REDPATH AVE · Feb 19, 2026 · 38 m away

Latest activity nearby

  • Building permit

    Install a Electro Magnetic Locking Device on PH Level (17th floor)

    55 ERSKINE AVE · Nov 24, 2026 · 246 m away
  • Building permit

    Proposal for multiple repairs at P1 Garage Parking Level

    66 BROADWAY AVE · Nov 23, 2026 · 153 m away
  • Building permit

    Proposal to repair loose concrete for balcony slab edge and replace the guardrail surrounding the property.

    171 ERSKINE AVE · Nov 3, 2026 · 173 m away
  • Building permit

    Proposal to install two Maglocks - doors P100b and P00b at the level P1.

    170 ROEHAMPTON AVE · Oct 14, 2026 · 209 m away
  • Building permit

    Replace Domestic Hot and Cold Risers

    900 MOUNT PLEASANT RD · Sep 9, 2026 · 158 m away
  • Building permit

    Localized Garage & Boiler Room Roof Slab Waterproofing Repairs and Swimming Pool Deck Repairs and Waterproofing Installation including targeted concrete repairs and waterproofing replacement.

    100 ROEHAMPTON AVE · Aug 25, 2026 · 270 m away
  • Zoning review

    Closed

    894 MOUNT PLEASANT RD · Aug 21, 2026 · 179 m away
  • Zoning review

    Closed

    115 BROADWAY AVE · Aug 20, 2026 · 99 m away
  • Zoning review

    Closed

    241 REDPATH AVE · Aug 12, 2026 · 38 m away
  • Building permit

    Proposal for interior alterations to common areas due to water damage.

    161 ROEHAMPTON AVE · Jul 6, 2026 · 267 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station7 min walk
Nearest TTC stop
Mt Pleasant Rd at Broadway Ave3 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
6,998 vehicles in 8 hRedpath Ave / Broadway Ave, 60 m away, Oct 31, 2018
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Dawn Redwood Park1 min walk
Redpath Avenue Parkette2 min walk
60 Broadway Ave Park3 min walk

Schools within 1 km

  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 3 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 5 min walk
  • NORTHERN SECONDARY SCHOOL English Public 5 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 5 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • WILLOWDALE HIGH SCHOOL Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.