HousePrecheckCheck an address

223 Gladys Allison PlToronto · zoning, lot size and permit records

Residential detached · RD (f15.0; a550) (x5)19.2 × 45.7 m878 m²on Gladys Allison Pl

Not a home

Lee Lifeson Art Park - Prop G

The City of Toronto's real estate inventory lists Lee Lifeson Art Park - Prop G here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 11 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • Major Transit Station Area: North York CentreThe City plans more homes around the station: good for transit, and more building over time.
N10 m
19.2 m frontage45.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit22 236871Closeddemolition

    Proposal to demolish two storey mixed use building.

    Apr 14, 2023 · 223 GLADYS ALLISON PL

Check before you build

  • Site-specific exception 900.3.10(5)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.3.10(5)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite regulation 10.20.40.70 (3), the minimum side yard setback is 1.8 metres

  2. Rule C

    For a lawfully existing building on the lot known as 2980 Weston Road: (i) the maximum driveway width is 16.6 metres; and (ii) the minimum front yard landscaping is 33 percent and the minimum front yard soft landscaping is 74 percent. Prevailing By-laws and Prevailing Sections: (A) Schedule `D' Airport Hazard Map from City of North York zoning by-law 7625.

  3. Older by-law A

    Despite regulation 10.20.40.70 (3), the minimum side yard setback is 1.8 metres

  4. Older by-law C

    For a lawfully existing building on the lot known as 2980 Weston Road: (i) the maximum driveway width is 16.6 metres; and (ii) the minimum front yard landscaping is 33 percent and the minimum front yard soft landscaping is 74 percent. Prevailing By-laws and Prevailing Sections: (A) Schedule `D' Airport Hazard Map from City of North York zoning by-law 7625.

2 parts for other addresses
  • B On 97 Hillmount Avenue regulation 10.5.80.40(2) does not apply if the building complies with OMB Order PL100076.
  • B On 97 Hillmount Avenue regulation 10.5.80.40(2) does not apply if the building complies with OMB Order PL100076.
By-law 569-2013, Chapter 900

Lot facts

Area
878 m²
Frontage
19.2 m
Depth
45.7 m
Street
Gladys Allison Pl
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
10 m
Max lot coverage
30%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: North York Centre. The lot is inside the North York Centre Major Transit Station Area approved by the Province (Site and Area Specific Policy 726). Source
  • Minimum frontage 15 m. Frontage is about 19.2 m: meets the zone minimum. Source
  • Minimum lot area 550 m². Lot area is 878 m²: meets the minimum. Source
  • Zone RD (f15.0; a550) (x5) (Residential Detached). Chapter 10, section 10.20 of the by-law. Source

Around this lot

Minor variances approved
90%26 of 29 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
13

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached 2 storey dwelling.

    79 EMPRESS AVE · Feb 19, 2026 · 178 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an integral garage, front porch, and rear deck.

    101 PARKVIEW AVE · Dec 4, 2025 · 421 m away
  • Minor varianceRefused

    To construct a new dwelling. File numbers B0038/24NY, A0477/24NY & A0478/24NY will be jointly considered. Please note, this application was previously deferred Thursday, January 23, 2025.

    100 ALFRED AVE · Apr 17, 2025 · 445 m away
  • Minor varianceRefused

    To construct a new dwelling. File numbers B0038/24NY, A0477/24NY & A0478/24NY will be jointly considered. Please note, this application was previously deferred Thursday, January 23, 2025.

    100 ALFRED AVE · Apr 17, 2025 · 445 m away
  • Minor varianceApproved

    To construct a new dwelling.

    84 ELMWOOD AVE · Mar 6, 2025 · 173 m away

Latest activity nearby

  • Building permit

    A proposal to replace two existing ¿Loblaws¿ signs located at the third storey of the building facing the intersection of Yonge and Empress Avenue with two new wall signs identifying ¿T&T¿. In addition to replace two faces of an existing ground sign at the entrance of the indoor garage located at the north frontage of the property, facing Empress Avenue. **T&T SUPERMARKET**

    5095 YONGE ST · Nov 19, 2026 · 211 m away
  • Building permit

    Interior Alteration for Beauty Salon

    5095 YONGE ST · Nov 6, 2026 · 211 m away
  • Building permit

    Proposed interior fit-up for new "One Plant" Cannabis retail store.

    5095 YONGE ST · Nov 2, 2026 · 211 m away
  • Building permit

    Interior alterations to a non-residential building existing office suite fit-out.

    5140 YONGE ST · Oct 15, 2026 · 279 m away
  • Zoning review

    Under Review

    5095 YONGE ST · Sep 17, 2026 · 211 m away
  • Building permit

    Proposal for interior alterations to office suite

    5150-5160 YONGE ST · Aug 24, 2026 · 298 m away
  • Building permit

    Proposal for installation of 3 maglock doors.

    5150-5160 YONGE ST · Aug 17, 2026 · 298 m away
  • Zoning review

    Closed

    5095 YONGE ST · Aug 4, 2026 · 211 m away
  • Development application

    City of Markham application - To demolish the existing automobile service station and reconstruct a new automobile services station, and construct a car wash and drive-through restaurant on the subject site.

    5100 YONGE ST · Jul 23, 2026 · 287 m away · City file
  • Building permit

    Proposal for interior alterations to add 2 walls on the 6th floor.

    5150-5160 YONGE ST · Jul 22, 2026 · 298 m away

Neighbourhood: East Willowdale

About the area around the lot, not the lot itself.

Nearest station
North York Centre Station4 min walk
Nearest TTC stop
North York Centre Station - Northbound Platform4 min walk
Nearest cycling route
Willowdale AveCycle Track, 10 min walk
Nearest traffic count
5,706 vehicles in 8 hElmwood Ave / Doris Ave, 150 m away, Nov 3, 2021
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Lee Lifeson Art Park1 min walk
Ring Road Linear Park1 min walk
Willowdale Park1 min walk

Schools within 1 km

  • CLAUDE WATSON SCHOOL FOR THE ARTS English Public 5 min walk
  • EARL HAIG SECONDARY SCHOOL English Public 5 min walk
  • TORONTO DISTRICT SCHOOL BOARD - HEAD OFFICE English Public 6 min walk
  • CROWN ACADEMY Private 7 min walk
  • CARDINAL CARTER ACADEMY FOR THE ARTS English Separate 8 min walk
  • ELPIS COLLEGE TORONTO (temporarily moved) Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEast WillowdaleMedian neighbourhood
Median household income (2020)$95,000$84,500
Households that own their home70%54%
Population (2021)15,48516,813
Homes built in 1960 or before15%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEast WillowdaleCity median
Assault295.1636.3
Robbery56.869.5
Shootings5.710.5
Auto theft181.6192.6
Theft over $5,00051.146.1
Break and enter198.6172.8
Theft from vehicles193188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.