HousePrecheckCheck an address

222 Islington AveToronto · zoning, lot size and permit records

Employment · E 1.0 (x54)97.6 × 76.2 m7,434 m²on Islington Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 2 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
97.6 m frontage76.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 134232 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 134232 PRS 00 IRClosed

    Property Standards

    Mar 25, 2026 · 222 ISLINGTON AVE
  • Zoning review23 125987 LTOClosed
    Mar 23, 2023 · 222 ISLINGTON AVE
  • Building permit17 106340Cancelled

    INTERIOR ALTERATIONS TO BOTH LEVELS AND LIFE SAFETY SYSTEM UPGRADE OF EXISTING ONE AND TWO STOREY NON-RESIDENTIAL BUILDING. RELOCATE SPRINKLERS AND EMERGENCY LIGHTS BASED ON NEW EXITS.

    Jan 19, 2017 · 222 ISLINGTON AVE
  • Building permit15 110513Closed

    Permit to install (1) Backflow Prevention Devices (Water only).

    Feb 5, 2015 · 222 ISLINGTON AVE
  • Zoning review12 201072 ZPRClosed
    Jun 27, 2012 · 222 ISLINGTON AVE
  • Building permit07 240319Closed - Dormant

    Fire alarm panel replacement in an existing industrial bldg

    Jul 24, 2007 · 222 ISLINGTON AVE
  • Zoning review06 109797 ZPUClosed
    Feb 15, 2006 · 222 ISLINGTON AVE
  • Building permit02 174456Closed

    Interior partitions to Industrial Building

    May 21, 2003 · 222 ISLINGTON AVE

Check before you build

  • Site-specific exception 900.20.10(54)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(54)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    City of Toronto by-law 339-2012.

By-law 569-2013, Chapter 900

Lot facts

Area
7,434 m²
Frontage
97.6 m
Depth
76.2 m
Street
Islington Ave
Corner lot
No
Public lane
None
House footprint
4,679 m²roof up to 18.9 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (x54) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: maple, norway (28 cm), maple, norway (26 cm), maple, norway (19 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second storey addition above the existing building and a roof top patio.

    1 TOFFEE CRT · Nov 23, 2023 · 129 m away
  • Minor varianceApproved

    To construct a new one-storey addition above the existing building, and a new roof top amenity space.

    1 TOFFEE CRT · Jun 30, 2022 · 129 m away

Latest activity nearby

  • Building permit

    REV: Proposed revision for layout change and structural updatesProposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling.

    181 SIXTH ST · Oct 21, 2026 · 286 m away
  • Zoning review

    Closed

    260 EIGHTH ST · Jul 20, 2026 · 125 m away
  • Minor varianceApproved

    To construct two new warehouse buildings.

    260 EIGHTH ST · Jun 25, 2026 · 125 m away
  • Building permit

    Interior alteration at second floor of apartment, adding a second kitchen, seeplans

    195 SIXTH ST · Jan 26, 2026 · 240 m away
  • Zoning review

    Closed

    260 EIGHTH ST · Nov 19, 2025 · 125 m away
  • Building permit

    1 WALL SIGN**Canadian Helen Keller Centre**

    150 EIGHTH ST · Nov 12, 2025 · 266 m away
  • Building permit

    2 WALL SIGNS and 1 WINDOW SIGN**Canadian Helen Keller Centre**

    150 EIGHTH ST · Oct 30, 2025 · 266 m away
  • Building permit

    Party wall admin permit for proposed work at 181 Sixth St (25 138632).

    183 SIXTH ST · Apr 24, 2025 · 279 m away
  • Building permit

    Proposal for a non-heated vestibule adition to the existing mosque to facilitate shoes and coats

    75 BIRMINGHAM ST · Apr 14, 2025 · 284 m away
  • Zoning review

    Closed

    181 SIXTH ST · Jan 23, 2025 · 286 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station25 min walk
Nearest TTC stop
Islington Ave at Birmingham St North Side2 min walk
Nearest cycling route
Birmingham StCycle Track, 3 min walk
Nearest traffic count
8,406 vehicles in 8 hIslington Ave / Birmingham St, 170 m away, Mar 24, 2021
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Sixth Street Park2 min walk
Jordon Carter Memorial Park3 min walk
Lamp Ground5 min walk

Schools within 1 km

  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 7 min walk
  • SEVENTH STREET JR SCHOOL English Public 9 min walk
  • ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • SECOND STREET JR MDL SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.