HousePrecheckCheck an address

222 Cherry StToronto · zoning, lot size and permit records

≈ 60.0 × 136.9 m5,434 m²on Polson Stcorner, also on Cherry St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 07 122209 (Install 5 new kitchen exhaust hoods. HVAC - Make interior alterations to existing super..., 2007, status Revision Issued); 07 109401 (Drain - Insulate exterior walls, south wall to be removed and replaced, interior altera..., 2007, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 60.0 m frontage≈ 136.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 2 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 07 122209 (Install 5 new kitchen exhaust hoods. HVAC - Make interior alterations to existing super..., 2007, status Revision Issued); 07 109401 (Drain - Insulate exterior walls, south wall to be removed and replaced, interior altera..., 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (14% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0003/07TEY (To lease the Parts 10 - 27 on the Draft Reference Plan for a period in excess of 21 yea..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

28 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit20 129996Closeddemolition

    Demolition of existing retail store (supermarket)

    Apr 28, 2020 · 222 CHERRY ST
  • Building permit08 112441Closed

    Revision to location and size of canopy.

    Apr 29, 2008 · 222 CHERRY ST
  • Building permit07 285662Closed

    Int alterations to office on main floor

    Dec 14, 2007 · 222 CHERRY ST
  • Building permit07 122209Revision Issued

    Install 5 new kitchen exhaust hoods. HVAC - Make interior alterations to existing supermarket (Phase II) for new tenant (T&T Supermarket).

    Aug 15, 2007 · 222 CHERRY ST
  • Zoning review07 250330 LTOClosed
    Aug 3, 2007 · 222 CHERRY ST
  • Consent (lot split)B0003/07TEYApproved

    To lease the Parts 10 - 27 on the Draft Reference Plan for a period in excess of 21 years. The use of the leased portion of 222-238 Cherry Street is for the purpose of a grocery store and ancillary parking for a period of 40 years. No changes to the property layout are proposed.

    Jun 6, 2007 · 222 CHERRY ST
  • Zoning review07 183247 ZPRClosed
    Apr 30, 2007 · 222 CHERRY ST
  • Building permit07 109401Inspection

    Drain - Insulate exterior walls, south wall to be removed and replaced, interior alterations to Mezzanine level, under slab plumbing and new sprinklers to entire area. New glass sliding doors on North wall. Vacant food store.

    Mar 26, 2007 · 222 CHERRY ST
Show 20 older records
  • Zoning review05 104902 LTOClosed
    Jan 27, 2005 · 222 CHERRY ST
  • Zoning review04 199673 LTOClosed
    Dec 10, 2004 · 222 CHERRY ST
  • Zoning review04 136212 LTOClosed
    May 18, 2004 · 222 CHERRY ST
  • Zoning review04 125368 LTOClosed
    Apr 16, 2004 · 222 CHERRY ST
  • Zoning review04 108065 LTOClosed
    Feb 9, 2004 · 222 CHERRY ST
  • Zoning review03 198164 LTOClosed
    Dec 4, 2003 · 222 CHERRY ST
  • Zoning review03 197924 LTOClosed
    Dec 3, 2003 · 222 CHERRY ST
  • Building permit03 190201Closed

    Make interior alterations to the ground floor retail store to use as a Flea Market. Existing and proposed: Retail.

    Dec 1, 2003 · 222 CHERRY ST
  • Zoning review03 195749 LTOClosed
    Nov 25, 2003 · 222 CHERRY ST
  • Zoning review03 195746 LTOClosed
    Nov 25, 2003 · 222 CHERRY ST
  • Zoning review03 195745 LTOClosed
    Nov 25, 2003 · 222 CHERRY ST
  • Zoning review03 195743 LTOClosed
    Nov 25, 2003 · 222 CHERRY ST
  • Zoning review03 195741 000Cancelled
    Nov 25, 2003 · 222 CHERRY ST
  • Zoning review03 195739 LTOClosed
    Nov 25, 2003 · 222 CHERRY ST
  • Building permit03 186628Closed

    Install new plumbing fixtures. See fixture schedule attached.

    Oct 17, 2003 · 222 CHERRY ST
  • Zoning review94 024774 LTOClosed
    Apr 19, 1994 · 222 CHERRY ST
  • Zoning review94 024475 LTOClosed
    Jan 27, 1994 · 222 CHERRY ST
  • Zoning review83 026419 LTOClosed
    Nov 4, 1983 · 222 CHERRY ST
  • Zoning review81 030928 LTOClosed
    Dec 7, 1981 · 222 CHERRY ST
  • Zoning review81 029970 LTOClosed
    Feb 23, 1981 · 222 CHERRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
5,434 m²
Frontage
60 mestimated, irregular lot
Depth
136.9 mestimated, irregular lot
Street
Polson St
Corner lot
Yes, also on Cherry St136.9 m along it
Public lane
None
House footprint
3,594 m²roof up to 10.4 m
Back yard
51.9 mhouse to rear lot line
Side yards
0.2 m and 4.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: elm, siberian (45 cm), pine, austrian (30 cm), maple, norway crimson king (29 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a place of amusement use for the purpose of axe throwing on the ground floor of the existing two-storey industrial building.

    16 MUNITION ST · Aug 9, 2023 · 443 m away
  • Minor varianceApproved

    To permit a "place of amusement" use for the purpose of Hatchet Throwing on the ground floor of the existing two-storey industrial building, for a period of five years.

    16 MUNITION ST · Sep 27, 2017 · 443 m away
  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of six years, from June 10 to November 30, annually.

    51 COMMISSIONERS ST · Jan 31, 2017 · 409 m away
  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 5 years, from July 1st to October 31st, annually.

    51 COMMISSIONERS ST · Feb 19, 2014 · 409 m away
  • Minor varianceApproved

    To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 3 years, from July 1st to October 31st, annually.

    51 COMMISSIONERS ST · Jun 1, 2011 · 409 m away

Latest activity nearby

  • Zoning review

    Not Started

    55 POLSON ST · Nov 17, 2026 · 226 m away
  • Building permit

    1 Ground Sign***PORSHE***

    190 CHERRY ST · Nov 13, 2026 · 109 m away
  • Building permit

    1 Ground Sign****Porsche****

    190 CHERRY ST · Oct 19, 2026 · 109 m away
  • Zoning review

    Notice Sent

    190 CHERRY ST · Sep 8, 2026 · 109 m away
  • Minor variancePending

    Proposal to reduce the parking requirement for the existing car dealership (Porsche)

    190 CHERRY ST · Sep 8, 2026 · 109 m away
  • Building permit

    Installation of temporary structures for a temporary one-day outdoor event, including a bandstand, viewing decks, and front-of-house platformSet up August 31 and Removal September 11

    185 CHERRY ST · Aug 28, 2026 · 235 m away
  • Building permit

    Proposal for erecting one temporary tent (10x100¿ Frame tent (Cert#15 152028))

    185 CHERRY ST · Aug 5, 2026 · 235 m away
  • Building permit

    Proposed two temporary structures (stages) for Electric Island.Set up Aug. 6, 2026; tear down Aug. 10, 2026.

    185 CHERRY ST · Jul 31, 2026 · 235 m away
  • Building permit

    Installation of temporary structure for a one day even. Structures include bandstand, viewing decks and front-of-house platform.

    185 CHERRY ST · Jun 26, 2026 · 235 m away
  • Building permit

    Construct two temporary structures for Electric Island.Set up June 26, 2026; tear down June 29, 2026.

    185 CHERRY ST · Jun 26, 2026 · 235 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station34 min walk
Nearest TTC stop
Commissioners St at Cherry St East Side4 min walk
Nearest cycling route
Biidaasige Park TrlMulti-Use Trail, 1 min walk
Nearest traffic count
5,350 vehicles in 14 hPolson St / Cherry St / Martin Goodman Trl, 80 m away, Oct 6, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Biidaasige Park1 min walk
Jennifer Kateryna Koval's'kyj Park6 min walk
Cherry Beach Sports Fields12 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.