Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2023
Needs a closer lookStill open in the City's records: 23 151947 (Deferred Fees from folder 22 151947 (RSN-5106542) ZoningProcess RSN 73579092, 2023, status Open).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 228412 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 22 151947 (Proposed to construct 49 Storey mixed use building, with 7 level of hotels and 5 levels..., 2022); 20 207326 STE 13 SA (Proposal for a 49-storey mixed-use building comprised of 215 hotel suites, 580 resident..., 2020).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. A0170/25TEY (To alter the development standards of the 49-storey mixed-use building (as approved und..., 2025); A0621/24TEY (To permit access to the loading area of the 49-storey mixed-use building (as approved u..., 2024).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)14 development applications open within 300 m
Good to know14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
21 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 228412 PRS 00 IRClosed
Property Standards
Aug 29, 2026 · 225 JARVIS ST - By-law investigation26 143562 GRA 00 IRClosed
Graffiti
Apr 14, 2026 · 225 JARVIS ST - Minor varianceA0170/25TEYApproved
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
May 7, 2025 · 225 JARVIS ST - Minor varianceA0621/24TEYApproved
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
Sep 4, 2024 · 225 JARVIS ST - Building permit23 151947Open
Deferred Fees from folder 22 151947 (RSN-5106542) ZoningProcess RSN 73579092
Nov 7, 2023 · 225 JARVIS ST - Zoning review20 207326 PSPClosedJun 10, 2022 · 225 JARVIS ST
- Building permit22 151947Examiner's Notice Sent
Proposed to construct 49 Storey mixed use building, with 7 level of hotels and 5 levels of below grade parking.
May 26, 2022 · 225 JARVIS ST - Development application20 207326 STE 13 SANOAC Issued
Proposal for a 49-storey mixed-use building comprised of 215 hotel suites, 580 residential dwelling units, and ground floor non-residential uses. The total residential gross floor area is 42,780 square metres, and the total non-residential gross floor area is 13,095 square metres.
Oct 16, 2020 · 225 JARVIS ST · City file
Show 13 older records
- Building permit19 259409Closed
Proposal to demolish existing 13 storey hotel.
Feb 13, 2020 · 225 JARVIS ST - Zoning review15 134245 PRZClosedApr 1, 2015 · 225 JARVIS ST
- Development application15 134245 STE 27 OZClosed
Proposal for rezoning related to maintaining the existing 13 storey building that consits of hotel units and restaurant and constructing a 45 storey tower and building podium which will contain 580 residential units
Mar 30, 2015 · 225 JARVIS ST - Zoning review11 307334 LTOClosedNov 9, 2011 · 225 JARVIS ST
- Building permit10 312265Closed
Installation of two(2) 3" backflow prevention devices within the basement mechanical room of this multi use building.
Dec 16, 2010 · 225 JARVIS ST - Building permit01 149780Closed
Install fixtures on P1 Level in change rooms for swimming pool: 4 w.b., 3 w.c., 4 showers, 4 v.f.d., 1 sump pump cost incl. 01 - 107439
Jun 19, 2001 · 225 JARVIS ST - Building permit01 107439Closed
construct swimming pool and 2 change rooms in basement (p1 level)
May 9, 2001 · 225 JARVIS ST - Building permit00 167289Closed
install fix. 1st fl: 12 w.c., 9 w.b. 3 bar sink, 5 urinals -- cost incl. under file #00-121781
Jun 29, 2000 · 225 JARVIS ST - Zoning review00 142219 000ClosedApr 17, 2000 · 225 JARVIS ST
- Building permit99 014587Closed
H.V.A.C. ALTER H.V.A.C. SYSTEM. SEE BUILDIING PERMIT NO. 420584 COST INCLUDED IN 420584 EDC
May 7, 1999 · 225 JARVIS ST - Building permit99 014237Closed
SPRINKLER SHOP DRAWINGS IN ACCORDANCE WITH PERMIT #420584.
May 5, 1999 · 225 JARVIS ST - Building permit99 014588Closed
2ND FL: 14 K.S., 23 W.B., 14 B.T., 4 SHOWERS, 19 W.C., 3RD FL: 11 K.S., 19 W.B., 15 B.T., 1 SHOWER, 16 W.C., ON 5TH-13TH FLRS: (TYPICAL) 17 K.S., 17 W.B., 17 B.T., 17 W.C., 4 (6") SANITARY DRAINS, INSTALL NEW SOIL STACKS & VENT STACKS. COST INCLUDED IN #420584. EDC
Mar 29, 1999 · 225 JARVIS ST - Building permit98 024972Closed
MAKE INTERIOR ALTERATIONS. W. SOMMER IS FAMILIAR. FEE $35219.31
Mar 15, 1999 · 225 JARVIS ST
Check before you build
Site-specific exception 900.11.10(59)
Needs a closer look19 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 225 Jarvis Street, if the requirements of By-law 765-2020(OMB) are complied with, none of the provisions of 5.10.40.70 (1) and (2), 40.5.40.10, 40.10.20.100(1.A) and (4), 40.10.40.1(1), 40.10.40.10(2), 40.10.40.40(1), 40.10.40.50(1), 40.10.40.60, 40.10.40.70(2) and (4), 40.10.40.80(2), 40.10.50.10(2) and (3), 40.10.100.10(1), 150.100.30.1(1), 200.5.10.1(1), 200.15.1.5(1), 220.5.1, 220.5.10.1. and 230.5.10.1 apply to prevent the erection or use of a building , structure , addition or enlargement permitted in By-law 765-2020(OMB)
- Rule B
The total gross floor area of all buildings and structures must not exceed a maximum of 56,100 square metres, of which: (i) the residential gross floor area shall not exceed 43,000 square metres; and (ii) the non-residential gross floor area shall not exceed 13,100 square metres
- Rule C
Height shall be measured from Canadian Geodetic Datum elevation of 88.55 metres
- Rule D
The height of any building or structure , erected on the lands must not exceed the height in metres permitted as indicated by the numbers following the letter "H" on Diagram 3 of By-law 765-2020(OMB)
- Rule E
Despite (D), but subject to the provisions of
- Rule F
below, the following may exceed the height indicated by the numbers following the letter "H" as shown on Diagram 3 of By-law 765-2020(OMB): (i) A stair tower, elevator shaft, chimney stack or other heating, cooling or ventilation equipment or window washing equipment on the roof of the building or a fence, wall, decorative feature or structure enclosing such elements may exceed the height limits on the attached Diagram 3 of By-law 765-2020(OMB) by no more than 8.0 metres; (ii) A structure located on the roof of the building used for outside or open air recreation, maintenance, landscaping , privacy, safety or wind protection may exceed the height limits shown on the attached Diagram 3 of By-law 765-2020(OMB) by no more than 3.0 metres; (iii) The structures , elements and enclosures permitted by
- Rule G
of this Exception may exceed the height limits shown on the attached Diagram 3 of By-law 765-2020(OMB) by no more than 3.0 metres; (F) Notwithstanding the height encroachments permitted by (E) of this Exception, no portion of any building or structure or use, either temporary or permanent, shall have a height above 116.5 metres for any portion of the lands located within 0.6 metres north of any portion of Line A and for any portion of the lands located south of any portion of Line A; (G) Subject to the provisions of
- Rule H
below, no portion of any building or structure erected above grade shall be located otherwise than wholly within the areas delineated by heavy lines on the attached Diagram 3 of By-law 765-2020(OMB), except for the following: (i) Light fixtures, cornices, sills, eaves, mullions, canopies, awnings, parapets, trellises, ornamental and architectural elements, guardrails, balustrades, railings, stairs, stair enclosures, stair landings, terraces, balconies, platforms, wheel chair ramps, vents, air shafts, underground garage ramps and their associated structures , privacy screens and walls, fences, bollards, retaining walls, landscape features and vegetation, lightning rods, transformer vaults and elements required for the functional operation of the building , window washing equipment, aircraft warning features, patio tables and chairs and public art features. (H) Notwithstanding the encroachments permitted by (G) of this Exception, no portion of any building or structure or use, either temporary or permanent, above a height of 116.5 metres shall be located south of any portion of Line A identified on Diagram 3 of By-law 765-2020(OMB)
- Rule I
The building shall be setback 3.0 metres from Jarvis Street between a height of 18.4 metres and 26.0 metres as shown on Diagram 3 of By-law 765-2020(OMB)
- Rule J
A minimum of 2.0 square metres of indoor amenity space per dwelling unit shall be provided on the lot . Indoor amenity space provided in the building or structure above the minimum requirement of 2.0 square metres per dwelling unit is permitted to be shared between all residential and non-residential uses provided on the lot
- Rule K
A minimum of 860 square metres of outdoor amenity space shall be provided on the lot
- Rule L
Parking spaces for residential uses within the building must be maintained on the lot in accordance with the following: (i) A minimum of 0.3 parking spaces for each bachelor dwelling unit ; (ii) A minimum of 0.5 parking spaces for each one bedroom dwelling unit ; (iii) A minimum of 0.75 parking spaces for each two bedroom dwelling unit ; (iv) A minimum of 1.0 parking space for each three bedroom dwelling unit ; and (v) A minimum of 0.06 parking spaces for each dwelling unit for visitors to the building .
- Rule M
Parking spaces for non-residential uses within the building must be maintained on the lot in accordance with the following: (i) A minimum of 0.2 parking spaces per 100 square metres of non-residential gross floor area .
- Rule N
Bicycle parking spaces for residential uses shall be provided on the lot as follows: (i) A minimum of 0.9 long term bicycle parking spaces per dwelling unit ; and (ii) A minimum of 0.1 short term bicycle parking spaces per dwelling unit .
- Rule O
Bicycle parking spaces for non-residential uses shall be provided on the lot as follows: (i) 6 short term bicycle parking spaces ; and (ii) 2 long bicycle parking spaces .
- Rule P
The minimum number of loading spaces to be provided and maintained on the lot shall be: (i) Two (2) loading spaces – type B; (ii) Two (2) loading spaces – type C; and (iii) One (1) loading space – type G.
- Rule Q
Despite any existing or future severance, partition, or division of the lot, the provisions of Exception CR (x59) shall apply to the whole of the lands as if no severance, partition or division occurred
- Rule R
None of the provisions of By-law 569-2013 or the provisions of Exception CR (x59), other than (F) and (H), shall apply to prevent the erection and use of a temporary sales office anywhere on the lands for the purpose of selling dwelling units permitted by this Exception.
- Rule S
Definitions: (i) "Line A" shall mean the dashed line identified as Line A on Diagram 3 attached to By-law 765-2020(OMB).
Lot facts
- Area
- 4,627 m²
- Frontage
- 66.6 m
- Depth
- 70.3 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- Walnut Hall Pl, 6 m along it
- House footprint
- 1,998 m²roof up to 76.1 m
- Back yard
- 12.3 mhouse to rear lot line
- Side yards
- 7.6 m and 17.5 mhouse to side lot lines
- Buildings on the lot
- 12house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.5 (c2.0; r2.0) SS2 (x59) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%25 of 26 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 15
- Development applications
- 46
Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 144 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 457 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 241 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 141 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 147 m away
Latest activity nearby
- Building permit
Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.
231 DUNDAS ST E · Nov 19, 2026 · 152 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 163 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 74 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 243 m away - Building permit
REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.
154 SHUTER ST · Oct 15, 2026 · 236 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 68 m away - Zoning review
Closed
150 SHERBOURNE ST · Oct 5, 2026 · 290 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Oct 2, 2026 · 77 m away - Building permit
1 wall sign + 1 projecting sign**ELEMON PILATES**
30 MUTUAL ST · Oct 1, 2026 · 271 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 155 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station9 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 2 min walk
- Nearest traffic count
- 6,552 vehicles in 8 hDundas St E / George St, 100 m away, Apr 19, 2023
- Serious collisions within 500 m
- 232021–2026, killed or seriously injured: 3 fatal, 17 with pedestrians, 1 with cyclists
- Parks
- Moss Park2 min walk
- Arena Gardens2 min walk
- 45 Dalhousie St Park4 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 6 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.