HousePrecheckCheck an address

220 George StToronto · zoning, lot size and permit records

Also 102 Shuter St, 104 Shuter St, 106 Shuter St

24.6 × 31.7 m773 m²on George Stcorner, also on Shuter Stbacks onto Walnut Hall Pl

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 12 development applications open within 300 m, up to 52 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
24.6 m frontage31.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0309/14TEY (To alter the re-development plan for a 14-storey residential building, approved under s..., 2014); A0344/02TEY (This project involves the restoration, conversion and expansion of a vacant building de..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 52 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 167876Cancelled

    CONSTRUCTION OF A NEW PERGOLA & DECK

    Jun 20, 2024 · 220 GEORGE ST
  • Building permit22 225697Cancelled

    CONSTRUCTION OF A NEW PERGOLA & DECK

    Nov 3, 2022 · 220 GEORGE ST
  • Development application16 142550 STE 27 CDClosed

    Draft plan of standard condominium for a 12-14 storey residential building containing 50 residential units and 42 resident parking spaces.

    Apr 19, 2016 · 108 SHUTER ST · City file
  • Building permit15 178654Closed

    Proposal to install 5 electromagnetic locks on the 1st,, 5th and 11th floors

    Jul 15, 2015 · 102 SHUTER ST
  • Building permit12 124662Closednew building

    Permit to construct new 14 storey residential condominium building with 50 units. The base of the building includes three 2-storey townhouses fronting on Shuter Street. There are 42 parking spaces proposed within a three level underground garage accessed from an existing public lane. A valet will take cars to the underground garage via a car elevator. - Please see 10 249540 STE 27 SA for Site Plan Approval application - and note site plan indicates 48 units where building permit indicates 50 units.

    Jun 8, 2015 · 102 SHUTER ST
  • Minor varianceA0309/14TEYApproved

    To alter the re-development plan for a 14-storey residential building, approved under site specific By-law 68-2014 (OMB), by adding additional units and by amending the heights shown on Map 2 of the By-law.

    Oct 9, 2014 · 102 SHUTER ST
  • Zoning review10 256841 PSPClosed
    Sep 13, 2010 · 102 SHUTER ST
  • Development application10 249540 STE 27 SAClosed

    Armstrong Hunter & Associates (O.B.O. 6645411 Canada Inc.) is applying for a site plan application to permit a 12-14 storey residential condominium building with 50 units. The base of the building includes three 3-storey townhouses fronting on Shuter Street. There are 37 parking spaces proposed within a three level underground garage accessed from an existing public lane. A valet will take cars to the underground garage via a car elevator.

    Aug 30, 2010 · 102 SHUTER ST
Show 7 older records
  • Zoning review08 224509 POZClosed
    Nov 25, 2008 · 102 SHUTER ST
  • Development application08 222718 STE 27 OZClosed

    Application to amend the Official Plan & Zoning By-law to permit a 14 storey residential condominium building with 48 units. The base of the building includes three 2-storey townhouses fronting on Shuter Street. There are 42 parking spaces proposed within a three level underground garage accessed from an existing public lane. A valet will take cars to the underground garage via a car elevator.

    Nov 18, 2008 · 108 SHUTER ST
  • Zoning review08 221049 ZPUClosed
    Nov 13, 2008 · 102 SHUTER ST
  • Building permit07 228004Closeddemolition

    Proposal to demolish remaining portion of existing apartment building on 102-110 Shuter St.

    Jun 28, 2007 · 102 SHUTER ST
  • Minor varianceA0344/02TEYApproved with conditions

    This project involves the restoration, conversion and expansion of a vacant building designated under the Ontario Heritage Act, that previously contained 16 apartment units and 20 dwelling rooms. The total number of units proposed for this project is 54 dwelling units and 2 townhouse units occupying a total area of 395.93 square metres. The total number of underground parking spaces will be 15.

    Aug 14, 2002 · 102 SHUTER ST
  • Zoning review02 129162 PSPClosed
    Apr 23, 2002 · 102 SHUTER ST
  • Zoning review02 127219 ZPRClosed
    Apr 16, 2002 · 102 SHUTER ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
773 m²
Frontage
24.6 m
Depth
31.7 m
Street
George St
Corner lot
Yes, also on Shuter St31.7 m along it
Public lane
Walnut Hall Pl, 31.2 m along it
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%29 of 29 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    15
    Development applications
    41

    Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

      212 DUNDAS ST E · Jul 15, 2026 · 223 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.

      244 QUEEN ST E · Mar 11, 2026 · 391 m away
    • Minor varianceApproved

      To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

      30 BOND ST · Jan 21, 2026 · 434 m away
    • Minor varianceApproved

      To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

      134 JARVIS ST · Nov 12, 2025 · 172 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

      53 MUTUAL ST · Oct 1, 2025 · 135 m away

    Latest activity nearby

    • Building permit

      1 wall sign**PHARMASAVE**

      213 A QUEEN ST E · Nov 23, 2026 · 278 m away
    • Building permit

      Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

      231 DUNDAS ST E · Nov 19, 2026 · 216 m away
    • Building permit

      1 wall sign**PHARMASAVE**

      215 QUEEN ST E · Nov 12, 2026 · 286 m away
    • Zoning review

      Not Started

      134 JARVIS ST · Nov 6, 2026 · 172 m away
    • Zoning review

      Closed

      78 MUTUAL ST · Oct 28, 2026 · 193 m away
    • Building permit

      1 wall sign**PHARMASAVE**

      215 QUEEN ST E · Oct 26, 2026 · 286 m away
    • Building permit

      INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT

      111 QUEEN ST E · Oct 26, 2026 · 299 m away
    • Zoning review

      Not Started

      207 JARVIS ST · Oct 21, 2026 · 53 m away
    • Building permit

      Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

      25 MUTUAL ST · Oct 19, 2026 · 186 m away
    • Building permit

      REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.

      154 SHUTER ST · Oct 15, 2026 · 197 m away

    Neighbourhood: Moss Park

    About the area around the lot, not the lot itself.

    Nearest station
    Queen Station10 min walk
    Nearest TTC stop
    Dundas St East at Jarvis St3 min walk
    Nearest cycling route
    Shuter StCycle Track, 1 min walk
    Nearest traffic count
    4,682 vehicles in 8 hGeorge St / Shuter St / Moss Park Trl, 30 m away, Nov 4, 2021
    Serious collisions within 500 m
    252021–2026, killed or seriously injured: 3 fatal, 18 with pedestrians, 1 with cyclists
    Parks
    Moss Park1 min walk
    Arena Gardens3 min walk
    45 Dalhousie St Park3 min walk

    Schools within 1 km

    • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 2 min walk
    • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 6 min walk
    • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 6 min walk
    • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 7 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 7 min walk
    • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMoss ParkMedian neighbourhood
    Median household income (2020)$65,000$84,500
    Households that own their home35%54%
    Population (2021)21,49016,813
    Homes built in 1960 or before17%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMoss ParkCity median
    Assault2226.8636.3
    Robbery166.669.5
    Homicide3.45.3
    Shootings3.410.5
    Auto theft81.6192.6
    Theft over $5,00064.646.1
    Break and enter350.2172.8
    Theft from vehicles275.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.