Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (35% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (25% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2020
Needs a closer lookStill open in the City's records: 20 135488 (Revision 01 - Revision related to sprinklers. Proposed interior alterations to convert..., 2020, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (40% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 Committee of Adjustment file on this lot
Good to know1 approved. A113/01N (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2001).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
4 records on file: more than at 88% of Toronto houses (median 0).
- Building permit20 135488Revision Issued
Revision 01 - Revision related to sprinklers. Proposed interior alterations to convert an existing film studio into a new industrial warehouse building for vehicle and tire storage.
Jun 24, 2020 · 220 BARTLEY DR - Building permit12 196285Closed
Install one premise isolation back flow preventer for Time To Play Inc.
Jun 25, 2012 · 220 BARTLEY DR - Minor varianceA113/01NApproved
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit a portion of the above noted hydro lands to be used for parking in conjunction with the lands to the south municipally known as 220 Bartley Drive.
Apr 12, 2001 · 220 BARTLEY DR - Building permit97 088038Closed
INTERIOR
Feb 27, 1997 · 220 BARTLEY DR
Lot facts
- Area
- 17,256 m²
- Frontage
- 153.4 mestimated, irregular lot
- Depth
- 235.7 mestimated, irregular lot
- Street
- Bartley Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 7,622 m²roof up to 15.4 m
- Back yard
- 28.8 mhouse to rear lot line
- Side yards
- 9.5 m and 30.3 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%2 of 2 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a reduction in the number of parking spaces provided on the subject property.
155 BERMONDSEY RD · Mar 26, 2026 · 197 m away
Latest activity nearby
- Building permit
3 wall signs.***MAPLE LEAF SELF STORAGE***
150 BERMONDSEY RD · Nov 6, 2026 · 112 m away - Building permit
3 wall signs.***MAPLE LEAF SELF STORAGE***
150 BERMONDSEY RD · Oct 14, 2026 · 112 m away - Building permit
1 Wall Sign ** BUILD FACTORY **
155 BERMONDSEY RD · Aug 19, 2026 · 197 m away - Zoning review
Closed
254 BARTLEY DR · Apr 9, 2026 · 212 m away - Minor varianceApproved
To permit a reduction in the number of parking spaces provided on the subject property.
155 BERMONDSEY RD · Mar 26, 2026 · 197 m away - Building permit
HVAC - PROPOSED INTERIOR ALTERATIONS TO OFFICE/WAREHOUSE
251 BARTLEY DR · Feb 2, 2026 · 300 m away - Building permit
Part Permit - Construction of a 1,459 Square metre warehouse expansion for the purposeof fabrication and storage of townhouse wall and floor panels
155 BERMONDSEY RD · Nov 14, 2025 · 197 m away - Building permit
Proposal for front sidewalk retaining wall & exterior stairs.
197 BARTLEY DR · Nov 10, 2025 · 283 m away - Zoning review
Closed
155 BERMONDSEY RD · Jun 26, 2025 · 197 m away - Building permit
Proposal for a replacement of existing 2" RP backflow preventer with a 2' DVCA
150 BERMONDSEY RD · Jun 20, 2025 · 112 m away
Neighbourhood: Victoria Village
About the area around the lot, not the lot itself.
- Nearest station
- Sloane Station12 min walk
- Nearest TTC stop
- Bermondsey Rd at Bartley Dr3 min walk
- Nearest cycling route
- Bermondsey RdSigned Route (No Pavement Markings), 2 min walk
- Nearest traffic count
- 10,212 vehicles in 8 hBermondsey Rd / Bartley Dr, 170 m away, Feb 8, 2022
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Charles Sauriol Conservation Area1 min walk
- Academy Soccer Field6 min walk
- Linkwood Lane Park11 min walk
Schools within 1 km
- IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Victoria Village | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,000 | $84,500 |
| Households that own their home | 41% | 54% |
| Population (2021) | 17,365 | 16,813 |
| Homes built in 1960 or before | 29% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Victoria Village | City median |
|---|---|---|
| Assault | 591.2 | 636.3 |
| Robbery | 20.4 | 69.5 |
| Auto theft | 285.4 | 192.6 |
| Theft over $5,000 | 30.6 | 46.1 |
| Break and enter | 208.9 | 172.8 |
| Theft from vehicles | 178.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.