HousePrecheckCheck an address

22 O'Hara AveToronto · zoning, lot size and permit records

Residential · R (d1.0) (x803)15.1 × 40.8 m607 m²on O'Hara Avebacks onto O'Hara Pl

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 13 rental units, built 1918More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 3 development applications open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 25 266580 PRS 00 IR (Property Standards, 2025, status Rescheduled).
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
15.1 m frontage40.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 25 266580 PRS 00 IR (Property Standards, 2025, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 242497 PRS 00 IR (Property Standards, 2026); 26 209348 PRS 00 IR (Property Standards, 2026); 26 171758 000 00 IR (Adequate Heat, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 13 units, built 1918).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 242497 PRS 00 IRClosed

    Property Standards

    Sep 23, 2026 · 22 O'HARA AVE
  • By-law investigation26 209348 PRS 00 IRClosed

    Property Standards

    Jul 27, 2026 · 22 O'HARA AVE
  • By-law investigation26 171758 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 22 O'HARA AVE
  • By-law investigation26 171757 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 22 O'HARA AVE
  • By-law investigation25 266580 PRS 00 IRRescheduled

    Property Standards

    Dec 15, 2025 · 22 O'HARA AVE
  • Building permit14 237044Closed

    Proposed construction of main entrance stairs for existing three storey multi dwelling residential building.

    Oct 22, 2014 · 22 O'HARA AVE
  • Building permit12 143488Closed

    permit to install one backflow device in basement of existing apartment building.

    Apr 2, 2012 · 22 O'HARA AVE

Check before you build

  • Site-specific exception 900.2.10(803)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(803)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

6 parts for other addresses
  • A On 27 Brock Ave., 21-23 Earnbridge St., former City of Toronto by-law 97-0591
  • B On 58 Brock Ave., former City of Toronto by-law 275-82 and 567-82
  • C On 62 Brock Ave., City of Toronto by-law 115-02
  • D On 26 Lansdowne Ave., City of Toronto by-laws 262-2005 and 414-2005
  • E On 30 Lansdowne Ave., City of Toronto by-law 113-02
  • F On 48 O'Hara Ave., former City of Toronto by-law 513-79.
By-law 569-2013, Chapter 900

Lot facts

Area
607 m²
Frontage
15.1 m
Depth
40.8 m
Street
O'Hara Ave
Corner lot
No
Public lane
O'Hara Pl, 14.8 m along it
House footprint
307 m²roof up to 18.6 m
Back yard
14.6 mhouse to rear lot line
Side yards
0 m and 1.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone R (d1.0) (x803) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
94%30 of 32 decisions
Garden suite permits
1
Laneway suite permits
1
Multiplex permits
17
Development applications
11

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the existing rear ground floor deck with stairs, as well as a one-storey side (south) addition above the existing basement walkout, which were constructed beyond/without an authorized building permit.

    93 MACDONELL AVE · Sep 9, 2026 · 345 m away
  • Minor varianceApproved

    To construct a new rear one-storey semi-detached ancillary building (greenhouse and storage shed), abutting the side (north) lot line and adjacent to the existing carport.

    85 MACDONELL AVE · May 13, 2026 · 326 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey addition with a ground floor deck and stairs, and a front basement walkout. The existing rear ground floor deck and a portion of the existing front porch will be demolished.

    38 O'HARA AVE · May 6, 2026 · 61 m away
  • Minor varianceRefused

    To legalize and to maintain the exterior stairs leading to the rooftop platform, as well as the perimeter guardrails (around the roof of the existing rear one-storey detached ancillary building (detached garage abutting the laneway)), that were constructed without an authorized building permit.

    191 COWAN AVE · Apr 15, 2026 · 260 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front basement walkout, a rear two-storey addition (replacing the existing rear one-storey addition) with a second storey deck, and a third storey addition.

    22 BROCK AVE · Mar 18, 2026 · 165 m away

Latest activity nearby

  • Minor variancePending

    To convert the existing spa use (located within the one-storey extension of the existing mixed-use building), into a nightclub use. The existing uses with the three-storey portion of the building (ground floor restaurant uses, and four residential dwelling units on the second and third floors) will be maintained and unaltered.

    1347 QUEEN ST W · Dec 16, 2026 · 119 m away
  • Zoning review

    Not Started

    1337 QUEEN ST W · Nov 23, 2026 · 145 m away
  • Zoning review

    Not Started

    1346 QUEEN ST W · Nov 12, 2026 · 216 m away
  • Building permit

    Proposal for interior alterations to legalize the conversion of the garage to a hair salon and legalize the decks on the existing flat roof.

    1267 QUEEN ST W · Nov 9, 2026 · 290 m away
  • Building permit

    Proposal to install Backwater Valve.

    31 O'HARA AVE · Oct 21, 2026 · 82 m away
  • Building permitmultiplex, secondary suite

    REVISION-01Proposed addition and interior alterations to exisiting single family dwelling to create a three storey triplex.

    18 O'HARA AVE · Oct 19, 2026 · 20 m away
  • Building permit

    Revision No.1:Proposal to convert the existing dwelling into a community centre/art gallery. Scope of work includes 2-storey rear addition with a 2nd floor mezzanine, interior alterations and 2nd storey terrace with rear exit stair, front ramp access, vestibule and a front basement walk-out. See also 22 134421 ZAP and 22 182731 MV - "Band Gallery"

    19 BROCK AVE · Oct 14, 2026 · 207 m away
  • Building permitmultiplex

    Proposal for third floor extension and additional four units. (Total units: 5)

    23 LANSDOWNE AVE · Oct 5, 2026 · 150 m away
  • Minor variancePending

    Postponed

    1337 QUEEN ST W · Sep 16, 2026 · 145 m away
  • Building permit

    Proposal for a party wall admin permit related to work occurring at 23 Lansdowne Ave.

    21 LANSDOWNE AVE · Sep 16, 2026 · 150 m away

Neighbourhood: Roncesvalles

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station25 min walk
Nearest TTC stop
West Lodge Ave at May Robinson Apartments1 min walk
Nearest cycling route
Seaforth AveSharrows, 2 min walk
Nearest traffic count
1,333 vehicles in 14 hO'Hara Ave / Maple Grove Ave, 60 m away, Mar 31, 2026
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Masaryk Park3 min walk
Pat Capponi Parkette4 min walk
Dunn Avenue Parkette5 min walk

Schools within 1 km

  • PARKDALE JR & SR PUBLIC SCHOOL English Public 3 min walk
  • PARKDALE COLLEGIATE INSTITUTE English Public 4 min walk
  • HOLY FAMILY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • DR RITA COX - KINA MINAGOK PUBLIC SCHOOL English Public 10 min walk
  • MARY MOTHER OF GOD SCHOOL Private 10 min walk
  • ALEXANDER MUIR GLADSTONE AVE & THE GROVE English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRoncesvallesMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home47%54%
Population (2021)14,61016,813
Homes built in 1960 or before67%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRoncesvallesCity median
Assault939.5636.3
Robbery66.269.5
Auto theft102.4192.6
Theft over $5,000646.1
Break and enter252.9172.8
Theft from vehicles150.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.