HousePrecheckCheck an address

22 Lascelles BlvdToronto · zoning, lot size and permit records

Also 131 Oriole Pkwy

Open space · O236.9 × 20.1 m4,481 m²on Lascelles Blvd

Not a home

Portion Of Kay Gardner Beltline Park

The City of Toronto's real estate inventory lists Portion Of Kay Gardner Beltline Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
236.9 m frontage20.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
4,481 m²
Frontage
236.9 m
Depth
20.1 m
Street
Lascelles Blvd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
84%27 of 32 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
13
Development applications
3

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to construct an one-storey rear yard addition and new deck.See also 26-255451 ZAP 00 ZR

    30 CHAPLIN CRES · Nov 20, 2026 · 280 m away
  • Building permit

    PROPOSED DECK & PERGOLA ON REAR YARD

    26 WILBERTON RD · Nov 10, 2026 · 203 m away
  • Building permit

    Proposed 2 storey rear addition and interior alterations

    264 ORIOLE PKWY · Nov 5, 2026 · 280 m away
  • Zoning review

    Closed

    30 CHAPLIN CRES · Oct 16, 2026 · 280 m away
  • Building permit

    Proposal for concrete slab repair within parking garage

    25 LASCELLES BLVD · Oct 9, 2026 · 199 m away
  • Building permit

    Proposal to install backwater valves on sanitary as well as storm line

    18 OXTON AVE · Oct 6, 2026 · 188 m away
  • Building permitgarden suite

    Proposed converting existing garage to garden suite.

    38 KILBARRY RD · Oct 6, 2026 · 108 m away
  • Zoning review

    Notice Sent

    14 KILBARRY RD · Oct 5, 2026 · 112 m away
  • Building permitmultiplex

    Proposed addition, interior alteration, underpinning, and new deck, to convert SRF to 3 storey 4 unit dwelling.

    5 HIGHBOURNE RD · Sep 30, 2026 · 193 m away
  • Building permitdemolition

    Proposal to demolish existing single family dwelling and three-storey two-unit dwelling.See also 25-182991 ZAP 00 ZR & 26-231172 BLD 00 NH

    20 WILBERTON RD · Sep 17, 2026 · 201 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
Davisville Station6 min walk
Nearest TTC stop
Oriole Pkwy at Frobisher Ave2 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
19,956 vehicles in 8 hOriole Pkwy / Oriole Cres, 110 m away, Nov 27, 1986
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Oriole Park - Toronto1 min walk
Fiona Nelson Parkette5 min walk

Schools within 1 km

  • UPPER CANADA COLLEGE SCHOOL Private 9 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 10 min walk
  • THE STUDY ACADEMY Private 10 min walk
  • THE STUDY ACADEMY SCHOOL Private 11 min walk
  • UPPER CANADA PREP SCHOOL Private 11 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.