Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2008
Needs a closer lookStill open in the City's records: 07 288726 (Make modifications to existing fire alarm in TTC station, 2008, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 250675 ((TTC Chester Subway Station) Installation of new guardrail gate, new wall anchors, davi..., 2025); 26 261849 (Proposal for installation of roof edge railings and ladder port at TTC's Chester Station, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A1064/16TEY (To alter the existing TTC Chester Station by constructing two additions to accommodate..., 2017).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
11 records on file: more than at 99% of Toronto houses (median 0).
- Building permit26 261849Examiner's Notice Sent
Proposal for installation of roof edge railings and ladder port at TTC's Chester Station.
Oct 28, 2026 · 22 CHESTER AVE - Building permit25 250675Permit Issued
(TTC Chester Subway Station) Installation of new guardrail gate, new wall anchors, davit arms and local concrete slab repairs
Dec 11, 2025 · 22 CHESTER AVE - Building permit17 205336Closed
REVISION - as per the bubbled drawingsPropsoal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing two additions at the rear which will include elevators from the ground floor to the platform level.
Aug 22, 2018 · 22 CHESTER AVE - Building permit18 111611Closed
Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates
Feb 5, 2018 · 22 CHESTER AVE - Zoning review17 145534 LTOClosedApr 19, 2017 · 22 CHESTER AVE
- Minor varianceA1064/16TEYApproved
To alter the existing TTC Chester Station by constructing two additions to accommodate elevators on the west side of the building for a fully accessible transit station.
Feb 15, 2017 · 22 CHESTER AVE - Zoning review16 205107 ZZCClosedAug 11, 2016 · 22 CHESTER AVE
- Zoning review16 146783 ZPRClosedApr 27, 2016 · 22 CHESTER AVE
Show 3 older records
- Building permit14 260878Closed
Proposal for interior alterations related to sanitary pump replacement, "Chester Subway Station"
Dec 18, 2014 · 22 CHESTER AVE - Building permit07 288726Inspection
Make modifications to existing fire alarm in TTC station.
Jan 22, 2008 · 22 CHESTER AVE - Zoning review08 103308 LTOClosedJan 15, 2008 · 22 CHESTER AVE
Check before you build
Exception 900.2.10(312) does not apply to this address
Good to knowThe exception covers this area, but each of its 3 parts names other addresses. The standard rules on this page apply.
Zoning By-law 569-2013, Chapter 900
Every part of the exception names other addresses. The standard rules apply to this lot.
3 parts for other addresses
- A On 40 Ainsworth Rd., former City of Toronto by-law 323-85
- B On or between the odd numbered addresses of 19-23 Canning Ave., the even numbered addresses of 20-24 Canning Ave., former City of Toronto by-law 376-78
- C On 21R Pretoria Ave., City of Toronto by-law 250-08.
Lot facts
- Area
- 1,244 m²
- Frontage
- 30.5 m
- Depth
- 41 m
- Street
- Chester Ave
- Corner lot
- No
- Public lane
- Ln N Danforth W Chester, 30.5 m along it
- House footprint
- 442 m²roof up to 6.5 m
- Back yard
- 17.5 mhouse to rear lot line
- Side yards
- 1.2 m and 4 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 94%75 of 80 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 11
- Multiplex permits
- 6
- Development applications
- 1
Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 80 variance decisions: more than at 99% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (including a basement) and a rear ground level deck with stairs. Also, to enlarge portions of the east and west sides of the third storey.
67 WOLFREY AVE · Oct 14, 2026 · 397 m away - Minor varianceApproved
To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a complete second storey addition (containing one garden suite) with an east side cantilevered portion, and a north side flat roof cantilevered extension. Also, to construct an east side ground floor covered lounge (located below the cantilevered portion of the second level). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).
32 BAYFIELD CRES · Oct 7, 2026 · 319 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey addition to the north side of the existing rear two-storey portion of the dwelling, a new rear ground floor deck and stairs, and to extend the rear ground floor patio. Also, to construct a third floor west side dormer addition, and a rear rooftop deck (above the second storey portion of the dwelling).
20 BUTTERNUT ST · Sep 23, 2026 · 359 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial rear three-storey addition with rear second and third storey balconies. There will be a total of one residential dwelling unit on this lot.
152 WOLFREY AVE · Aug 5, 2026 · 346 m away - Minor varianceApproved
To construct a new three-storey detached dwelling with a front covered porch with stairs, a rear deck with stairs, a rear basement walkout, and a rear third floor terrace.
180 WOLFREY AVE · Jul 15, 2026 · 372 m away
Latest activity nearby
- Building permit
Revision 01 - structural revision to kitchen floor/ceiling framing and fire-separation assembly.Proposal for water damage repairs - Base Building ONLY - Remove and replace damaged subfloor sections to restore structural integrity. Remove and replace displaced and unsafe first-floor floor joists; remove and reinstate subfloor as needed to access framing. Repair or replace deteriorated basement wall studs.Install missing subfloor sections within the first-floor framing. Restore fire-rated assemblies.
492 DANFORTH AVE · Nov 23, 2026 · 276 m away - Minor variancePending
In Process
19 PLAYTER CRES · Nov 18, 2026 · 264 m away - Building permit
Scope of work to include lowering the basement level by underpinning and a basement front addition under the front porch that is to be partially-reconstructed.
964 A LOGAN AVE · Oct 29, 2026 · 269 m away - Building permit
Proposal for installation of roof edge railings and ladder port at TTC's Chester Station.
22 CHESTER AVE · Oct 28, 2026 · 4 m away - Minor variancePending
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition (including basement) with a rear deck and stairs.
22 GARNOCK AVE · Sep 15, 2026 · 242 m away - Zoning review
Notice Sent
19 PLAYTER CRES · Aug 26, 2026 · 264 m away - Zoning review
Closed
499 DANFORTH AVE · Aug 11, 2026 · 280 m away - Building permit
Proposal for 3rd storey dormers on the north & south sides for habitable space in the attic. New Balcony, Re-roofing of the second-floor roof and the roof of the ground-level enclosed porch.
82 CHESTER AVE · Jul 29, 2026 · 160 m away - Building permit
Supply/install six (6) new awnings for TD Bank
480 DANFORTH AVE · Jul 24, 2026 · 224 m away - Building permit
Proposal to demo existing dwelling to construct a new 3 storey 2 Unit Dwelling.
46 PLAYTER CRES · Jul 23, 2026 · 164 m away
Neighbourhood: Playter Estates-Danforth
About the area around the lot, not the lot itself.
- Nearest station
- Chester Station1 min walk
- Nearest TTC stop
- Chester Station - Eastbound Platform1 min walk
- Nearest cycling route
- Danforth AveCycle Track, 1 min walk
- Nearest traffic count
- 1,702 vehicles in 14 hHurndale Ave / Jackman Ave, 80 m away, Jul 25, 2024
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Logan Avenue Parkette2 min walk
- Logan Green Field4 min walk
- Withrow Park6 min walk
Schools within 1 km
- FRANKLAND COMMUNITY SCHOOL English Public 4 min walk
- JACKMAN AVENUE JR PUBLIC SCHOOL English Public 5 min walk
- HOLY NAME CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- MONTCREST ELEMENTARY SCHOOL Private 11 min walk
- CITY ADULT LEARNING CENTRE English Public 11 min walk
- CENTENNIAL COLLEGE SCHOOL - CARLAW CAMPUS College 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Playter Estates-Danforth | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 48% | 54% |
| Population (2021) | 7,680 | 16,813 |
| Homes built in 1960 or before | 60% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Playter Estates-Danforth | City median |
|---|---|---|
| Assault | 1400.3 | 636.3 |
| Robbery | 59.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 249.2 | 192.6 |
| Theft over $5,000 | 35.6 | 46.1 |
| Break and enter | 237.3 | 172.8 |
| Theft from vehicles | 712 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.