HousePrecheckCheck an address

2198 Queen St EToronto · zoning, lot size and permit records

Also 2198A Queen St E, 59 Balsam Ave

16.0 × 40.4 m639 m²on Queen St Ecorner, also on Balsam Avebacks onto Sarah McComb Lane

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 19 rental units, built 1927More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
16.0 m frontage40.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 171288 000 00 IR (Adequate Heat, 2026); 26 171287 000 00 IR (Property Standards, 2026); 26 165953 PRS 00 IR (Property Standards, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 19 units, built 1927).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 171288 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 2198 QUEEN ST E
  • By-law investigation26 171287 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 2198 QUEEN ST E
  • By-law investigation26 165953 PRS 00 IRClosed

    Property Standards

    May 23, 2026 · 2198 QUEEN ST E
  • By-law investigation25 252963 PRS 00 IRClosed

    Property Standards

    Nov 12, 2025 · 2198 QUEEN ST E
  • By-law investigation25 240796 HEA 00 IRClosed

    Adequate Heat

    Oct 16, 2025 · 2198 QUEEN ST E
  • By-law investigation25 213886 PRS 00 IRClosed

    Property Standards

    Aug 21, 2025 · 2198 QUEEN ST E
  • By-law investigation25 122244 GRA 00 IRClosed

    Graffiti

    Feb 26, 2025 · 2198 QUEEN ST E
  • Building permit24 134674Closed

    Proposal to install a back flow prevention device

    May 15, 2024 · 59 BALSAM AVE
Show 2 older records
  • Zoning review11 202335 LPRClosed
    May 25, 2011 · 2198 QUEEN ST E
  • Zoning review09 188716 LTOClosed
    Nov 17, 2009 · 2198 QUEEN ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
639 m²
Frontage
16 m
Depth
40.4 m
Street
Queen St E
Corner lot
Yes, also on Balsam Ave40.4 m along it
Public lane
Sarah McComb Lane, 24.1 m along it
House footprint
508 m²roof up to 17.3 m
Back yard
0.6 mhouse to rear lot line
Side yards
0.1 m and 2.9 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    77%41 of 53 decisions
    Garden suite permits
    4
    Laneway suite permits
    0
    Multiplex permits
    7
    Development applications
    1

    Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 53 variance decisions: more than at 87% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit and maintain the existing one-storey ancillary building (one-car garage) in the rear yard, constructed beyond Building Permit (26 116057 BLD 00 NH) which permitted the demolition of the existing garage and provision of a parking pad.

      25 SELWOOD AVE · Nov 4, 2026 · 327 m away
    • Minor varianceApproved

      To alter the existing two-storey semi-detached dwelling by replacing the existing rear one-storey addition and decks with a new two-storey addition (including a basement level, and a first level deck with stairs). The existing covered front porch with stairs will be maintained and unaltered.

      99 SCARBORO BEACH BLVD · Jun 10, 2026 · 314 m away
    • Minor varianceApproved

      To permit a front (south) yard parking pad (located on a private driveway that does not lead directly to a garage) and construct a driveway, abutting Balmy Avenue. Also, to construct a new front walkway.

      20 BALMY AVE · Mar 18, 2026 · 490 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a new partial front addition (entry) and a front second-storey addition. The existing front second storey balcony will be demolished.

      93 SILVER BIRCH AVE · Feb 4, 2026 · 393 m away
    • Minor varianceApproved

      To maintain the existing two-storey semi-detached dwelling (containing two residential dwelling units), with a front porch, and a front second storey balcony.

      52 SCARBORO BEACH BLVD · Nov 12, 2025 · 435 m away

    Latest activity nearby

    • Building permit

      Proposal for a party wall administrative permit for work occurring at 10 Pine Terrace.

      12 PINE TER · Nov 19, 2026 · 243 m away
    • Building permit

      Proposal for a party wall administrative permit for work occurring at 10 Pine Terrace.

      8 PINE TER · Nov 19, 2026 · 235 m away
    • Building permit

      Proposal for interior alterations and underpinning.

      10 PINE TER · Nov 19, 2026 · 239 m away
    • Zoning review

      Not Started

      20 CROWN PARK RD · Nov 9, 2026 · 198 m away
    • Building permit

      Interior alterations to an existing retail store to accommodate a retail store with an ancillary café.

      120 GLEN MANOR DR · Nov 6, 2026 · 262 m away
    • Building permit

      Backwater Valve installation

      160 MACLEAN AVE · Oct 19, 2026 · 229 m away
    • Building permit

      Proposal to relocate rear retaining wall to gain two parking spaces.

      142 WILLOW AVE · Oct 8, 2026 · 280 m away
    • Building permit

      Install backwater valve

      62 MACLEAN AVE · Sep 24, 2026 · 243 m away
    • Building permit

      HVAC - Proposing to add a third bedroom by extending existing loft to the opposite walls as third floor addition and interior alterations

      4 PINE TER · Jul 22, 2026 · 227 m away
    • Building permitsecondary suite

      Revision 1: changes to the rear walkoutPROPOSED NEW THIRD STOREY ADDITION AND REAR WALKOUT

      34 FERNWOOD PARK AVE · Jun 30, 2026 · 222 m away

    Neighbourhood: The Beaches

    About the area around the lot, not the lot itself.

    Nearest station
    Danforth GO Station32 min walk
    Nearest TTC stop
    Queen St East at Beech Ave3 min walk
    Nearest cycling route
    Balsam AveSigned Route (No Pavement Markings), 1 min walk
    Nearest traffic count
    7,094 vehicles in 8 hQueen St E / Balsam Ave, 40 m away, Oct 19, 2022
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 2 with cyclists
    Parks
    Ivan Forrest Gardens3 min walk
    Balmy Beach Park5 min walk
    Glen Stewart Park5 min walk

    Schools within 1 km

    • ST DENIS CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
    • AVALON CHILDREN'S MONTESSORI SCHOOL Private 4 min walk
    • THE COLE ACADEMY Private 6 min walk
    • THE CLAREMONT SCHOOL Private 6 min walk
    • BALMY BEACH COMMUNITY SCHOOL English Public 7 min walk
    • WILLIAMSON ROAD JR PUBLIC SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureThe BeachesMedian neighbourhood
    Median household income (2020)$116,000$84,500
    Households that own their home63%54%
    Population (2021)21,51016,813
    Homes built in 1960 or before65%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleThe BeachesCity median
    Assault525.6636.3
    Robbery25.269.5
    Auto theft164192.6
    Theft over $5,00050.546.1
    Break and enter151.4172.8
    Theft from vehicles243.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.