HousePrecheckCheck an address

219 Livingston RdToronto · zoning, lot size and permit records

Also 158 Toynbee Trl

Open space · O≈ 129.3 × 605.3 m23,198 m²on Livingston Rdcorner, also on Toynbee Trl

Not a home

Guildwood Village Park

The City of Toronto's real estate inventory lists Guildwood Village Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 129.3 m frontage≈ 605.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    23,198 m²
    Frontage
    129.3 mestimated, irregular lot
    Depth
    605.3 mestimated, irregular lot
    Street
    Livingston Rd
    Corner lot
    Yes, also on Toynbee Trl605.3 m along it
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

    Around this lot

    Minor variances approved
    67%2 of 3 decisions
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    0

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      INSTALL BACK WATER VALVE

      182 TOYNBEE TRL · Nov 2, 2026 · 154 m away
    • Building permitnew building, new house, secondary suite

      Rev 02 - Amendment related to swimming pool, jacuzzi, and cabana at rear.Rev 01: [excavate under garage and rear deck] shown as cloudedProposal for a new 2 Unit-Detached.

      59 REGENCY SQ · Oct 16, 2026 · 184 m away
    • Building permit

      Interior alterations on the first floor

      56 REGENCY SQ · May 29, 2026 · 210 m away
    • Building permitsecondary suite

      Proposed interior alterations for new second suite in basement with walk-out.

      12 WYTHENSHAWE WOOD · May 15, 2026 · 293 m away
    • Building permit

      Removal of the load bearing wall and new pantry in the kitchen

      17 REGENCY SQ · Mar 12, 2026 · 247 m away
    • Building permit

      Proposal to install backwater valve.

      75 REGENCY SQ · Jan 6, 2026 · 292 m away
    • Building permitsecondary suite

      proposed second unit in basement and below grade entrance in rear yard

      3 NUFFIELD DR · Nov 5, 2025 · 140 m away
    • Building permit

      PROPOSED INTERIOR AND EXTERIOR SANITARY LINE REPLACEMENT WITH BACKWATER VALVE

      18 REGENCY SQ · Sep 18, 2025 · 201 m away
    • Building permit

      Proposal to construct two new detached garden sheds

      14 BURNAGE CRT · Sep 18, 2025 · 234 m away
    • Building permit

      Addition of a Backwater Valve

      10 WYTHENSHAWE WOOD · Sep 17, 2025 · 291 m away

    Neighbourhood: Guildwood

    About the area around the lot, not the lot itself.

    Nearest station
    Guildwood Station5 min walk
    Nearest TTC stop
    130 Westlake Rd - Guildwood Station5 min walk
    Nearest cycling route
    Westlake RdSigned Route (No Pavement Markings), 4 min walk
    Nearest traffic count
    946 vehicles in 14 hDearham Wood / Toynbee Trl, 350 m away, Aug 26, 2025
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Guildwood Village Park1 min walk
    Guild Park and Gardens7 min walk
    Galloway Park7 min walk

    Schools within 1 km

    • GUILDWOOD JR PUBLIC SCHOOL English Public 5 min walk
    • ST URSULA CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • SIR WILFRID LAURIER & NATIVE LEARNING CTR EAST English Public 9 min walk
    • MAPLEWOOD HIGH SCHOOL English Public 12 min walk
    • POPLAR ROAD JR PUBLIC SCHOOL English Public 13 min walk
    • JACK MINER SR PUBLIC SCHOOL English Public 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureGuildwoodMedian neighbourhood
    Median household income (2020)$102,000$84,500
    Households that own their home78%54%
    Population (2021)9,68016,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleGuildwoodCity median
    Assault399.4636.3
    Robbery55.769.5
    Shootings18.610.5
    Auto theft74.3192.6
    Theft over $5,00027.946.1
    Break and enter55.7172.8
    Theft from vehicles204.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.